Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210303District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Jul 2004 – May 2026
Value, last 12 filed months
$37 k
at the published price for each month
Months reported
263
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-10-05159452
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition616 bbl$37,422
GasProduction194,248 Mcf$1,243,105
Total$1,280,526

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3709, -100.6021. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.37085, -100.60210 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,011 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,011 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-4353685466,011 ftJul 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (263)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

263 months

May 202603,910106.413.05$11,909
Apr 202604,22998.932.87$12,136
Mar 202602,22789.753.15$7,014
Feb 2026058563.503.75$2,194
Jan 2026051559.138.00$4,119
Dec 202502256.664.41$97
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250163.933.01$3
Jul 20250066.743.32$0
Jun 20250166.483.13$3
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250367.704.27$13
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240171.372.28$2
Sep 20240069.612.36$0
Aug 20240175.632.06$2
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240178.812.20$2
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200544.642.68$13
Nov 202005338.772.71$143
Oct 202005736.972.48$141
Sep 202006737.091.99$133
Aug 2020016839.982.39$401
Jul 202001438.371.83$26
Jun 20200534.901.69$8
May 20200216.921.81$4
Apr 2020010114.751.80$182
Mar 202003430.341.86$63
Feb 202001849.881.98$36
Jan 202005557.252.09$115
Dec 201905859.012.30$134
Nov 201906055.302.75$165
Oct 201906253.472.42$150
Sep 201906855.052.66$181
Aug 201906453.112.30$147
Jul 201907556.272.46$185
Jun 20190052.782.49$0
May 201904358.482.74$118
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 201805846.594.19$243
Nov 201805152.934.24$216
Oct 201807661.443.40$258
Sep 201807059.543.11$218
Aug 201807459.403.07$227
Jul 201807665.142.93$223
Jun 201807560.183.08$231
May 201807965.382.90$229
Apr 201807663.842.90$220
Mar 201807861.222.79$217
Feb 201807161.782.77$196
Jan 201807862.874.01$313
Dec 201707957.272.92$231
Nov 201707355.423.12$228
Oct 201707749.292.98$230
Sep 201708447.523.09$259
Aug 201708445.373.00$252
Jul 201708743.873.09$269
Jun 201708542.493.09$262
May 201709045.373.26$294
Apr 201708847.933.21$283
Mar 201709246.772.98$275
Feb 201708450.452.95$248
Jan 201709449.413.42$321
Dec 201609548.763.72$354
Nov 201609542.492.64$251
Oct 2016010546.193.09$324
Sep 2016011141.553.10$344
Aug 2016012041.442.92$351
Jul 2016015641.622.92$456
Jun 2016041145.352.69$1,104
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160933.011.79$16
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150132.362.00$2
Nov 2015014538.792.17$314
Oct 20150043.552.43$0
Sep 20150842.992.76$22
Aug 2015116940.162.87$526
Jul 20150648.152.95$18
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150149.822.71$3
Mar 201508342.892.93$244
Feb 201504844.662.98$143
Jan 20150243.433.10$6
Dec 2014112254.693.59$493
Nov 2014115770.464.25$738
Oct 2014020778.303.90$808
Sep 2014110686.164.05$515
Aug 2014012689.394.04$508
Jul 2014168296.564.18$2,947
Jun 2014024398.164.74$1,151
May 2014010994.734.73$515
Apr 2014024895.944.81$1,193
Mar 2014021495.895.06$1,082
Feb 2014119497.406.19$1,299
Jan 2014028990.404.86$1,405
Dec 2013134891.824.35$1,607
Nov 2013128188.853.74$1,139
Oct 2013033697.423.78$1,270
Sep 20131394104.113.72$1,569
Aug 20134294104.253.52$1,453
Jul 20130369102.523.72$1,372
Jun 2013371194.403.93$3,080
May 2013080094.834.15$3,319
Apr 2013279593.964.28$3,593
Mar 2013060993.623.91$2,383
Feb 2013273091.233.42$2,679
Jan 2013079091.603.42$2,702
Dec 2012089086.773.42$3,044
Nov 2012061386.953.62$2,222
Oct 2012061989.383.40$2,104
Sep 2012238694.672.92$1,316
Aug 2012069792.662.91$2,027
Jul 2012073985.133.02$2,232
Jun 2012069479.822.52$1,748
May 2012066291.612.49$1,647
Apr 20122791101.652.00$1,783
Mar 20120779105.052.22$1,731
Feb 20125619101.102.57$2,096
Jan 2012080498.092.73$2,198
Dec 2011284696.873.24$2,935
Nov 2011669395.723.31$2,869
Oct 2011085284.983.65$3,109
Sep 2011291683.623.99$3,818
Aug 2011088783.404.15$3,680
Jul 2011086194.144.52$3,889
Jun 2011083692.904.64$3,879
May 2011285598.134.40$3,962
Apr 20113932105.964.33$4,357
Mar 2011273596.364.06$3,175
Feb 2011272585.644.18$3,202
Jan 2011259686.504.59$2,908
Dec 2010280185.734.35$3,654
Nov 2010261380.843.80$2,488
Oct 2010474778.103.51$2,934
Sep 2010776172.633.98$3,537
Aug 2010397273.684.42$4,517
Jul 2010479472.554.74$4,051
Jun 2010085470.364.91$4,193
May 201041,05071.124.24$4,731
Apr 201031,07381.694.12$4,669
Mar 2010358078.394.39$2,781
Feb 201051,18473.585.44$6,812
Jan 201041,32974.365.96$8,224
Dec 2009477671.445.48$4,541
Nov 200901,09774.593.75$4,115
Oct 200991,24172.544.11$5,754
Sep 200951,39465.543.06$4,600
Aug 200901,43567.423.22$4,619
Jul 200941,43961.133.46$5,230
Jun 200941,38566.163.90$5,659
May 200981,42554.743.93$6,032
Apr 200941,35246.773.59$5,037
Mar 200941,56642.144.06$6,525
Feb 200991,49732.814.63$7,231
Jan 200991,65735.865.37$9,222
Dec 200841,61037.105.98$9,772
Nov 200851,22755.496.86$8,695
Oct 2008258175.246.92$4,172
Sep 20083607101.767.88$5,087
Aug 200821,161114.228.48$10,077
Jul 200821,174131.0811.39$13,633
Jun 20083759131.3313.03$10,286
May 200861,046123.1711.57$12,846
Apr 20086909110.3110.45$10,165
Mar 200831,270101.909.66$12,579
Feb 2008799692.538.77$9,383
Jan 200801,32790.388.21$10,889
Dec 200771,28988.337.30$10,031
Nov 200741,22791.677.29$9,314
Oct 200781,41882.856.92$10,478
Sep 200741,46875.846.24$9,470
Aug 200741,60469.066.39$10,523
Jul 200741,49170.906.39$9,808
Jun 200701,61062.007.55$12,153
May 200771,47058.747.85$11,945
Apr 200781,53559.617.81$12,458
Mar 200781,51256.927.30$11,496
Feb 200741,37855.108.22$11,542
Jan 200741,44850.306.73$9,942
Dec 2006101,54056.656.92$11,221
Nov 200641,90654.207.62$14,736
Oct 200671,83854.906.01$11,438
Sep 200671,71460.085.04$9,054
Aug 200641,28568.717.34$9,707
Jul 200601,48369.376.34$9,406
Jun 200641,32266.286.38$8,705
May 200681,60866.016.42$10,859
Apr 200641,54264.397.36$11,607
Mar 2006101,64956.707.08$12,247
Feb 2006101,52357.597.75$12,381
Jan 200691,64160.598.93$15,205
Dec 200501,67054.9413.42$22,404
Nov 200594,92954.6910.59$52,682
Oct 2005135,36858.3413.80$74,814
Sep 200545,47161.4512.08$66,330
Aug 200546,01961.519.80$59,213
Jul 2005111,68055.697.84$13,790
Jun 2005146,73152.337.38$50,414
May 2005152,71245.226.65$18,716
Apr 2005172,91349.207.36$22,277
Mar 2005293,56050.377.15$26,932
Feb 2005212,67945.226.31$17,859
Jan 2005263,02243.166.32$20,228
Dec 2004304,42239.866.75$31,049
Nov 2004335,14745.286.33$34,077
Oct 2004285,76549.706.52$38,951
Sep 2004216,08543.245.28$33,061
Aug 200465,95242.375.55$33,292
Jul 2004280338.286.08$4,962

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                3,910 Mcf  × $  3.05 =    $11,909

────────────────────────────────────────────────────
Month total                                  $11,909

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210303 is the state's own key, not one this site invented.