Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210432District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$469 k
Oct 2004 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
260
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18160185
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$276
GasProduction67,192 Mcf$469,102
Total$469,378

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5212, -100.9154. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52124, -100.91541 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,000 ft.

Completions filed
Oct 2004
1 of 1 wells

1 well

42-43537075269,000 ftOct 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

May 2026043106.413.05$131
Apr 202603798.932.87$106
Mar 202604089.753.15$126
Feb 202603863.503.75$143
Jan 202604559.138.00$360
Dec 202504756.664.41$207
Nov 202504658.593.93$181
Oct 202504959.383.30$162
Sep 202504662.743.08$142
Aug 202503663.933.01$109
Jul 202503466.743.32$113
Jun 202503266.483.13$100
May 202503360.553.23$107
Apr 202503162.363.54$110
Mar 202503167.704.27$132
Feb 202503070.884.34$130
Jan 202503874.324.28$163
Dec 202403568.993.12$109
Nov 202403969.052.20$86
Oct 202403571.372.28$80
Sep 202402669.612.36$61
Aug 202402775.632.06$56
Jul 202403079.932.15$64
Jun 202403078.082.63$79
May 202403278.812.20$70
Apr 202403184.451.66$51
Mar 202402980.301.55$45
Feb 202402676.091.78$46
Jan 202402873.023.30$92
Dec 202302071.262.61$52
Nov 202302177.892.81$59
Oct 202302885.443.09$86
Sep 202302989.042.74$79
Aug 202303080.522.67$80
Jul 202302874.852.64$74
Jun 202302468.962.26$54
May 202301570.622.23$33
Apr 202301778.122.24$38
Mar 202311672.852.39$111
Feb 202301375.112.47$32
Jan 202301576.533.39$51
Dec 202202176.415.73$120
Nov 202202685.005.65$147
Oct 202203387.185.86$194
Sep 202203184.888.16$253
Aug 202213394.529.13$396
Jul 2022032101.587.54$241
Jun 2022029115.097.98$231
May 2022034109.378.43$287
Apr 2022030104.226.84$205
Mar 2022135108.885.08$287
Feb 202203491.054.86$165
Jan 202203981.844.54$177
Dec 202104271.323.90$164
Nov 202104177.435.24$215
Oct 202104579.795.71$257
Sep 202104469.865.35$235
Aug 202104866.024.22$203
Jul 202104470.783.98$175
Jun 202104169.493.38$139
May 202104063.483.02$121
Apr 202103860.362.76$105
Mar 202103961.302.72$106
Feb 202104157.805.55$227
Jan 202103750.412.81$104
Dec 202005244.642.68$139
Nov 202004838.772.71$130
Oct 202004336.972.48$107
Sep 202004137.091.99$82
Aug 202004239.982.39$100
Jul 202004438.371.83$80
Jun 202004234.901.69$71
May 202004116.921.81$74
Apr 202004214.751.80$76
Mar 202004430.341.86$82
Feb 202003949.881.98$77
Jan 202004357.252.09$90
Dec 201904359.012.30$99
Nov 201904255.302.75$116
Oct 201904453.472.42$106
Sep 201904055.052.66$106
Aug 201904653.112.30$106
Jul 201904756.272.46$116
Jun 201904452.782.49$110
May 201904758.482.74$129
Apr 201904562.632.75$124
Mar 201904656.803.06$141
Feb 201904050.852.79$112
Jan 201904646.033.23$149
Dec 201804246.594.19$176
Nov 201804452.934.24$186
Oct 201804561.443.40$153
Sep 201804259.543.11$131
Aug 201804859.403.07$147
Jul 201804965.142.93$144
Jun 201805460.183.08$166
May 201805265.382.90$151
Apr 201805063.842.90$145
Mar 201804861.222.79$134
Feb 201804561.782.77$124
Jan 201805062.874.01$200
Dec 201705057.272.92$146
Nov 201705055.423.12$156
Oct 201704949.292.98$146
Sep 201704947.523.09$151
Aug 201705245.373.00$156
Jul 201705443.873.09$167
Jun 201705242.493.09$161
May 201705645.373.26$183
Apr 201705447.933.21$173
Mar 201705446.772.98$161
Feb 201704950.452.95$145
Jan 201705149.413.42$174
Dec 201604948.763.72$182
Nov 201605142.492.64$135
Oct 201605046.193.09$155
Sep 201604941.553.10$152
Aug 201605241.442.92$152
Jul 201605541.622.92$161
Jun 201605445.352.69$145
May 201605642.521.99$112
Apr 201605736.561.99$113
Mar 201605633.011.79$100
Feb 201605326.472.06$109
Jan 201606127.352.36$144
Dec 201506232.362.00$124
Nov 201505938.792.17$128
Oct 201506743.552.43$163
Sep 201505842.992.76$160
Aug 201506140.162.87$175
Jul 201506048.152.95$177
Jun 201505856.152.88$167
May 201506055.212.96$177
Apr 201506049.822.71$162
Mar 201506242.892.93$182
Feb 201505844.662.98$173
Jan 201506343.433.10$195
Dec 2014011054.693.59$395
Nov 2014010270.464.25$434
Oct 2014010778.303.90$417
Sep 2014010286.164.05$413
Aug 2014011189.394.04$448
Jul 2014011396.564.18$472
Jun 201409098.164.74$426
May 2014010694.734.73$501
Apr 2014012195.944.81$582
Mar 2014011495.895.06$576
Feb 201405497.406.19$334
Jan 201406490.404.86$311
Dec 201305891.824.35$253
Nov 201306288.853.74$232
Oct 201306097.423.78$227
Sep 2013060104.113.72$223
Aug 2013067104.253.52$236
Jul 2013065102.523.72$242
Jun 201306294.403.93$244
May 201306994.834.15$286
Apr 201307493.964.28$317
Mar 201307993.623.91$309
Feb 201307091.233.42$239
Jan 201308391.603.42$284
Dec 201208186.773.42$277
Nov 201207986.953.62$286
Oct 201208489.383.40$286
Sep 201208194.672.92$236
Aug 201208592.662.91$247
Jul 201208785.133.02$263
Jun 201208579.822.52$214
May 201208891.612.49$219
Apr 2012085101.652.00$170
Mar 20120100105.052.22$222
Feb 2012086101.102.57$221
Jan 201209398.092.73$254
Dec 2011010296.873.24$330
Nov 201109195.723.31$301
Oct 201109184.983.65$332
Sep 201108283.623.99$327
Aug 201108283.404.15$340
Jul 201108394.144.52$375
Jun 201109092.904.64$418
May 201109498.134.40$414
Apr 2011090105.964.33$390
Mar 201109896.364.06$398
Feb 201108085.644.18$334
Jan 2011010386.504.59$473
Dec 2010011985.734.35$517
Nov 201009180.843.80$345
Oct 2010010078.103.51$351
Sep 201009672.633.98$382
Aug 2010011073.684.42$486
Jul 2010011572.554.74$545
Jun 2010012270.364.91$599
May 2010013871.124.24$584
Apr 2010013481.694.12$552
Mar 2010013778.394.39$601
Feb 2010012273.585.44$664
Jan 2010014874.365.96$883
Dec 2009017571.445.48$960
Nov 2009042474.593.75$1,591
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009018467.423.22$592
Jul 2009018961.133.46$655
Jun 2009020066.163.90$779
May 2009021554.743.93$844
Apr 2009024846.773.59$890
Mar 2009029642.144.06$1,201
Feb 2009026632.814.63$1,232
Jan 2009031235.865.37$1,676
Dec 2008030337.105.98$1,811
Nov 2008031855.496.86$2,182
Oct 2008033975.246.92$2,347
Sep 20080337101.767.88$2,655
Aug 20080347114.228.48$2,944
Jul 20080328131.0811.39$3,736
Jun 20080430131.3313.03$5,604
May 20080527123.1711.57$6,100
Apr 20080472110.3110.45$4,935
Mar 20080654101.909.66$6,320
Feb 2008055392.538.77$4,850
Jan 2008068690.388.21$5,629
Dec 2007073088.337.30$5,330
Nov 2007066091.677.29$4,813
Oct 2007067682.856.92$4,679
Sep 2007077075.846.24$4,808
Aug 2007063069.066.39$4,024
Jul 2007080270.906.39$5,123
Jun 2007087462.007.55$6,597
May 200701,03758.747.85$8,137
Apr 200701,14859.617.81$8,960
Mar 200701,38456.927.30$10,106
Feb 200701,54655.108.22$12,702
Jan 2007026750.306.73$1,796
Dec 2006030856.656.92$2,131
Nov 2006033554.207.62$2,552
Oct 2006037354.906.01$2,243
Sep 2006041560.085.04$2,090
Aug 2006047468.717.34$3,479
Jul 2006047569.376.34$3,013
Jun 2006053366.286.38$3,403
May 2006065966.016.42$4,234
Apr 2006076464.397.36$5,623
Mar 200601,06656.707.08$7,550
Feb 200601,13557.597.75$8,798
Jan 200601,35460.598.93$12,096
Dec 200501,62754.9413.42$21,827
Nov 200501,09154.6910.59$11,552
Oct 200501,29558.3413.80$17,866
Sep 200501,17761.4512.08$14,217
Aug 200501,25161.519.80$12,256
Jul 200501,40255.697.84$10,997
Jun 200501,55752.337.38$11,492
May 200501,73145.226.65$11,513
Apr 200502,03349.207.36$14,964
Mar 200502,41750.377.15$17,293
Feb 200502,46445.226.31$15,553
Jan 200502,93743.166.32$18,568
Dec 200403,41139.866.75$23,028
Nov 200404,69645.286.33$29,728
Oct 2004056249.706.52$3,661

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   43 Mcf  × $  3.05 =       $131

────────────────────────────────────────────────────
Month total                                     $131

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210432 is the state's own key, not one this site invented.