HILL-MAYER, MINNIE H."D"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210842District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$160 k
Oct 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
260
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18160749
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2 bbl$83
GasProduction21,983 Mcf$159,421
Total$159,504

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6138, -100.7828. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.61384, -100.78280 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,100 ft.

Completions filed
Dec 2004
1 of 1 wells

1 well

42-4353700838,100 ftDec 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240369.612.36$7
Aug 20240175.632.06$2
Jul 20240279.932.15$4
Jun 20240378.082.63$8
May 20240478.812.20$9
Apr 20240384.451.66$5
Mar 20240480.301.55$6
Feb 20240376.091.78$5
Jan 20240473.023.30$13
Dec 20230471.262.61$10
Nov 20230477.892.81$11
Oct 20230385.443.09$9
Sep 20230289.042.74$5
Aug 20230180.522.67$3
Jul 20230274.852.64$5
Jun 20230368.962.26$7
May 20230570.622.23$11
Apr 20230478.122.24$9
Mar 20230472.852.39$10
Feb 20230575.112.47$12
Jan 20230776.533.39$24
Dec 20220676.415.73$34
Nov 20220585.005.65$28
Oct 20220587.185.86$29
Sep 20220584.888.16$41
Aug 20220294.529.13$18
Jul 202202101.587.54$15
Jun 202203115.097.98$24
May 202206109.378.43$51
Apr 202205104.226.84$34
Mar 202206108.885.08$30
Feb 20220891.054.86$39
Jan 202201281.844.54$54
Dec 20210771.323.90$27
Nov 20210677.435.24$31
Oct 20210679.795.71$34
Sep 20210569.865.35$27
Aug 20210466.024.22$17
Jul 20210470.783.98$16
Jun 20210469.493.38$14
May 20210663.483.02$18
Apr 20210660.362.76$17
Mar 20210761.302.72$19
Feb 202101057.805.55$55
Jan 20210650.412.81$17
Dec 20200644.642.68$16
Nov 20200438.772.71$11
Oct 20200436.972.48$10
Sep 20200437.091.99$8
Aug 20200239.982.39$5
Jul 20200338.371.83$5
Jun 20200434.901.69$7
May 20200516.921.81$9
Apr 20200614.751.80$11
Mar 20200630.341.86$11
Feb 20200749.881.98$14
Jan 20200957.252.09$19
Dec 201901059.012.30$23
Nov 20190955.302.75$25
Oct 20190753.472.42$17
Sep 20190755.052.66$19
Aug 20190353.112.30$7
Jul 20190456.272.46$10
Jun 20190752.782.49$17
May 20190858.482.74$22
Apr 20190762.632.75$19
Mar 201901056.803.06$31
Feb 20190850.852.79$22
Jan 20190946.033.23$29
Dec 20180946.594.19$38
Nov 20180952.934.24$38
Oct 20180861.443.40$27
Sep 20180759.543.11$22
Aug 20180459.403.07$12
Jul 20180265.142.93$6
Jun 20180260.183.08$6
May 20180865.382.90$23
Apr 201801063.842.90$29
Mar 201801061.222.79$28
Feb 20180961.782.77$25
Jan 201801262.874.01$48
Dec 201701157.272.92$32
Nov 201701055.423.12$31
Oct 201701149.292.98$33
Sep 20170747.523.09$22
Aug 201701145.373.00$33
Jul 201703943.873.09$120
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 201501332.362.00$26
Nov 201501438.792.17$30
Oct 201501143.552.43$27
Sep 201511342.992.76$79
Aug 20151840.162.87$63
Jul 201501548.152.95$44
Jun 201501156.152.88$32
May 201501355.212.96$38
Apr 201501449.822.71$38
Mar 201501642.892.93$47
Feb 201503844.662.98$113
Jan 201508043.433.10$248
Dec 201408354.693.59$298
Nov 201405470.464.25$230
Oct 20140978.303.90$35
Sep 20140686.164.05$24
Aug 20140089.394.04$0
Jul 20140996.564.18$38
Jun 201401698.164.74$76
May 201401894.734.73$85
Apr 201401795.944.81$82
Mar 201401995.895.06$96
Feb 201402497.406.19$149
Jan 201404890.404.86$233
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201306104.253.52$21
Jul 201305102.523.72$19
Jun 20130494.403.93$16
May 20130894.834.15$33
Apr 201301993.964.28$81
Mar 201302393.623.91$90
Feb 201301191.233.42$38
Jan 201302191.603.42$72
Dec 201201886.773.42$62
Nov 201201686.953.62$58
Oct 201201489.383.40$48
Sep 201201094.672.92$29
Aug 201201092.662.91$29
Jul 20120985.133.02$27
Jun 201201079.822.52$25
May 201201691.612.49$40
Apr 2012027101.652.00$54
Mar 2012030105.052.22$67
Feb 2012026101.102.57$67
Jan 201203098.092.73$82
Dec 201102896.873.24$91
Nov 201102395.723.31$76
Oct 201101984.983.65$69
Sep 201101383.623.99$52
Aug 201101283.404.15$50
Jul 201101394.144.52$59
Jun 201101492.904.64$65
May 201102098.134.40$88
Apr 2011024105.964.33$104
Mar 201104196.364.06$166
Feb 201103485.644.18$142
Jan 201103886.504.59$174
Dec 201003685.734.35$157
Nov 201002980.843.80$110
Oct 201002378.103.51$81
Sep 201001872.633.98$72
Aug 201001773.684.42$75
Jul 201001972.554.74$90
Jun 201001970.364.91$93
May 201003771.124.24$157
Apr 201004981.694.12$202
Mar 201005078.394.39$219
Feb 201004573.585.44$245
Jan 201005074.365.96$298
Dec 200904871.445.48$263
Nov 200904074.593.75$150
Oct 200902072.544.11$82
Sep 200901665.543.06$49
Aug 200902067.423.22$64
Jul 200902761.133.46$94
Jun 200903266.163.90$125
May 200904754.743.93$185
Apr 200906746.773.59$240
Mar 200907342.144.06$296
Feb 200907232.814.63$334
Jan 200908335.865.37$446
Dec 200807637.105.98$454
Nov 200806655.496.86$453
Oct 200805575.246.92$381
Sep 2008046101.767.88$362
Aug 2008040114.228.48$339
Jul 2008057131.0811.39$649
Jun 2008084131.3313.03$1,095
May 20080117123.1711.57$1,354
Apr 20080111110.3110.45$1,160
Mar 20080128101.909.66$1,237
Feb 2008014092.538.77$1,228
Jan 2008021390.388.21$1,748
Dec 2007022988.337.30$1,672
Nov 2007024491.677.29$1,779
Oct 2007028882.856.92$1,994
Sep 2007019375.846.24$1,205
Aug 2007028669.066.39$1,827
Jul 2007018570.906.39$1,182
Jun 2007020562.007.55$1,547
May 2007026158.747.85$2,048
Apr 2007025759.617.81$2,006
Mar 2007033756.927.30$2,461
Feb 2007031655.108.22$2,596
Jan 2007035950.306.73$2,415
Dec 2006042256.656.92$2,920
Nov 2006032054.207.62$2,438
Oct 2006028854.906.01$1,732
Sep 2006022560.085.04$1,133
Aug 2006023768.717.34$1,740
Jul 2006024669.376.34$1,560
Jun 2006021866.286.38$1,392
May 2006033066.016.42$2,120
Apr 2006036464.397.36$2,679
Mar 2006036856.707.08$2,607
Feb 2006036557.597.75$2,829
Jan 2006039860.598.93$3,555
Dec 2005041654.9413.42$5,581
Nov 2005051554.6910.59$5,453
Oct 2005045658.3413.80$6,291
Sep 2005050161.4512.08$6,052
Aug 2005059061.519.80$5,780
Jul 2005066155.697.84$5,185
Jun 2005071852.337.38$5,300
May 2005081645.226.65$5,427
Apr 200501,03849.207.36$7,640
Mar 200501,30650.377.15$9,344
Feb 200501,36145.226.31$8,591
Jan 200502,05043.166.32$12,961
Dec 2004081039.866.75$5,468
Nov 20040045.286.33$0
Oct 200405849.706.52$378

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 69.61 =         $0
Gas                    3 Mcf  × $  2.36 =         $7

────────────────────────────────────────────────────
Month total                                       $7

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210842 is the state's own key, not one this site invented.