MECKEL "A"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210931District 7CField 846465002 tax incentive programmesGasSaveExport
Value, all time
$86 k
Jan 2005 – May 2026
Value, last 12 filed months
$281
at the published price for each month
Months reported
257
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-12-27160963
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction15,258 Mcf$85,610
Total$85,610

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6690, -100.6876. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66900, -100.68759 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,326 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,326 ft.

Completions filed
Jan 2005
1 of 1 wells

1 well

42-43537152716,326 ftJan 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (257)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

257 months

May 20267106.413.05$21
Apr 20261098.932.87$29
Mar 20261089.753.15$31
Feb 2026863.503.75$30
Jan 20261059.138.00$80
Dec 20251456.664.41$62
Nov 2025758.593.93$27
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025460.553.23$13
Apr 2025962.363.54$32
Mar 20251067.704.27$43
Feb 2025970.884.34$39
Jan 20251174.324.28$47
Dec 20241268.993.12$37
Nov 20241169.052.20$24
Oct 20241171.372.28$25
Sep 20241369.612.36$31
Aug 20241575.632.06$31
Jul 20241479.932.15$30
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024380.301.55$5
Feb 20241176.091.78$20
Jan 20241373.023.30$43
Dec 20231271.262.61$31
Nov 20231077.892.81$28
Oct 20231085.443.09$31
Sep 2023889.042.74$22
Aug 2023880.522.67$21
Jul 2023974.852.64$24
Jun 2023868.962.26$18
May 2023870.622.23$18
Apr 2023978.122.24$20
Mar 2023972.852.39$22
Feb 2023975.112.47$22
Jan 20231076.533.39$34
Dec 2022976.415.73$52
Nov 2022885.005.65$45
Oct 2022887.185.86$47
Sep 2022784.888.16$57
Aug 2022794.529.13$64
Jul 20227101.587.54$53
Jun 20227115.097.98$56
May 20228109.378.43$67
Apr 20229104.226.84$62
Mar 202212108.885.08$61
Feb 20221391.054.86$63
Jan 20221281.844.54$54
Dec 20211271.323.90$47
Nov 2021877.435.24$42
Oct 20211379.795.71$74
Sep 20211369.865.35$70
Aug 20211366.024.22$55
Jul 20211370.783.98$52
Jun 20211469.493.38$47
May 20211163.483.02$33
Apr 2021860.362.76$22
Mar 20211161.302.72$30
Feb 20211157.805.55$61
Jan 20211050.412.81$28
Dec 20201144.642.68$29
Nov 20201138.772.71$30
Oct 2020836.972.48$20
Sep 2020637.091.99$12
Aug 20201039.982.39$24
Jul 2020738.371.83$13
Jun 2020734.901.69$12
May 2020716.921.81$13
Apr 20201414.751.80$25
Mar 20201430.341.86$26
Feb 20201349.881.98$26
Jan 20201357.252.09$27
Dec 20191359.012.30$30
Nov 20191155.302.75$30
Oct 20191753.472.42$41
Sep 20192055.052.66$53
Aug 20191753.112.30$39
Jul 20192056.272.46$49
Jun 20191952.782.49$47
May 20192158.482.74$58
Apr 20192262.632.75$61
Mar 20192356.803.06$70
Feb 20192350.852.79$64
Jan 20192746.033.23$87
Dec 20182846.594.19$117
Nov 20182152.934.24$89
Oct 20182261.443.40$75
Sep 20182059.543.11$62
Aug 20181859.403.07$55
Jul 20182165.142.93$62
Jun 20182260.183.08$68
May 20182365.382.90$67
Apr 20182363.842.90$67
Mar 20182861.222.79$78
Feb 20182461.782.77$66
Jan 20182962.874.01$116
Dec 20173257.272.92$93
Nov 20171955.423.12$59
Oct 20171549.292.98$45
Sep 20171447.523.09$43
Aug 20171545.373.00$45
Jul 20171643.873.09$49
Jun 20171842.493.09$56
May 20171945.373.26$62
Apr 20173047.933.21$96
Mar 20173246.772.98$95
Feb 20172750.452.95$80
Jan 20173149.413.42$106
Dec 20163348.763.72$123
Nov 20163342.492.64$87
Oct 20163446.193.09$105
Sep 20163141.553.10$96
Aug 20163341.442.92$97
Jul 20163241.622.92$94
Jun 20163245.352.69$86
May 20163242.521.99$64
Apr 20163036.561.99$60
Mar 20163233.011.79$57
Feb 20163026.472.06$62
Jan 20163127.352.36$73
Dec 20152832.362.00$56
Nov 20152438.792.17$52
Oct 20152943.552.43$70
Sep 20152742.992.76$74
Aug 20152440.162.87$69
Jul 20152748.152.95$80
Jun 20152856.152.88$81
May 20152255.212.96$65
Apr 20152349.822.71$62
Mar 20152742.892.93$79
Feb 20152844.662.98$83
Jan 20153343.433.10$102
Dec 20144754.693.59$169
Nov 20149870.464.25$417
Oct 20144678.303.90$179
Sep 20144586.164.05$182
Aug 20144889.394.04$194
Jul 20144896.564.18$201
Jun 20144798.164.74$223
May 20145294.734.73$246
Apr 20145395.944.81$255
Mar 20145095.895.06$253
Feb 20145197.406.19$316
Jan 20149090.404.86$437
Dec 20131691.824.35$70
Nov 20137188.853.74$265
Oct 20134997.423.78$185
Sep 201347104.113.72$175
Aug 201351104.253.52$180
Jul 201350102.523.72$186
Jun 20134994.403.93$193
May 20135294.834.15$216
Apr 20135393.964.28$227
Mar 20135193.623.91$200
Feb 20135691.233.42$192
Jan 20138091.603.42$274
Dec 20123786.773.42$127
Nov 20123686.953.62$131
Oct 20124789.383.40$160
Sep 2012994.672.92$26
Aug 20122792.662.91$79
Jul 20127085.133.02$211
Jun 20126679.822.52$166
May 20128991.612.49$221
Apr 2012103101.652.00$206
Mar 2012135105.052.22$300
Feb 2012111101.102.57$285
Jan 201219298.092.73$525
Dec 20119496.873.24$305
Nov 201112395.723.31$407
Oct 201119084.983.65$693
Sep 201120783.623.99$825
Aug 201151583.404.15$2,137
Jul 201112494.144.52$560
Jun 2011992.904.64$42
May 20113298.134.40$141
Apr 201129105.964.33$126
Mar 20113396.364.06$134
Feb 20113085.644.18$125
Jan 20113086.504.59$138
Dec 20103485.734.35$148
Nov 20103380.843.80$125
Oct 20103878.103.51$133
Sep 20103472.633.98$135
Aug 20103673.684.42$159
Jul 20104272.554.74$199
Jun 20104170.364.91$201
May 20104671.124.24$195
Apr 20104581.694.12$186
Mar 20104878.394.39$211
Feb 20104173.585.44$223
Jan 20104674.365.96$274
Dec 20094571.445.48$247
Nov 20095274.593.75$195
Oct 20095572.544.11$226
Sep 20095865.543.06$178
Aug 20095867.423.22$187
Jul 20095761.133.46$197
Jun 20096366.163.90$245
May 20096654.743.93$259
Apr 20096946.773.59$248
Mar 20096942.144.06$280
Feb 20096632.814.63$306
Jan 20097335.865.37$392
Dec 20087637.105.98$454
Nov 20087755.496.86$528
Oct 20087975.246.92$547
Sep 200885101.767.88$670
Aug 200893114.228.48$789
Jul 200897131.0811.39$1,105
Jun 2008101131.3313.03$1,316
May 2008111123.1711.57$1,285
Apr 2008113110.3110.45$1,181
Mar 2008118101.909.66$1,140
Feb 200813692.538.77$1,193
Jan 200817190.388.21$1,403
Dec 200712488.337.30$905
Nov 200712091.677.29$875
Oct 200716282.856.92$1,121
Sep 200720175.846.24$1,255
Aug 200728969.066.39$1,846
Jul 200740670.906.39$2,594
Jun 200758262.007.55$4,393
May 200747858.747.85$3,751
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005154.6910.59$11
Oct 20054258.3413.80$579
Sep 20054661.4512.08$556
Aug 20056961.519.80$676
Jul 200511855.697.84$926
Jun 200520452.337.38$1,506
May 200542945.226.65$2,853
Apr 200569149.207.36$5,086
Mar 200573150.377.15$5,230
Feb 200583445.226.31$5,264
Jan 20051,45143.166.32$9,174

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                    7 Mcf  × $  3.05 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210931 is the state's own key, not one this site invented.