WARD 114

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211092District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.4 M
Feb 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
256
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-02-08196872
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition715 bbl$46,032
GasProduction324,295 Mcf$2,356,563
Total$2,402,595

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5251, -100.7164. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52514, -100.71640 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,811 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,811 ft.

Completions filed
Feb 2005
1 of 1 wells

1 well

42-43537131197,811 ftFeb 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (256)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

256 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240176.091.78$2
Jan 20240273.023.30$7
Dec 20230171.262.61$3
Nov 20230277.892.81$6
Oct 20230485.443.09$12
Sep 20230189.042.74$3
Aug 20230280.522.67$5
Jul 20230374.852.64$8
Jun 20230368.962.26$7
May 20230270.622.23$4
Apr 20230278.122.24$4
Mar 20230172.852.39$2
Feb 20230275.112.47$5
Jan 20230476.533.39$14
Dec 20220776.415.73$40
Nov 20220385.005.65$17
Oct 20220187.185.86$6
Sep 20220284.888.16$16
Aug 20220494.529.13$37
Jul 202206101.587.54$45
Jun 202215115.097.98$155
May 202205109.378.43$42
Apr 202208104.226.84$55
Mar 2022010108.885.08$51
Feb 20220691.054.86$29
Jan 202201281.844.54$54
Dec 20216071.323.90$428
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20216066.024.22$396
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210160.362.76$3
Mar 202111161.302.72$91
Feb 20210957.805.55$50
Jan 202101150.412.81$31
Dec 202001244.642.68$32
Nov 202001138.772.71$30
Oct 202021236.972.48$104
Sep 202001037.091.99$20
Aug 202001139.982.39$26
Jul 202001438.371.83$26
Jun 20200334.901.69$5
May 202001016.921.81$18
Apr 202071514.751.80$130
Mar 202001530.341.86$28
Feb 20200449.881.98$8
Jan 20209857.252.09$532
Dec 20190959.012.30$21
Nov 20190655.302.75$17
Oct 20190853.472.42$19
Sep 20197855.052.66$407
Aug 20190953.112.30$21
Jul 201901056.272.46$25
Jun 20190952.782.49$22
May 20196758.482.74$370
Apr 20190862.632.75$22
Mar 20190956.803.06$28
Feb 20190350.852.79$8
Jan 201912846.033.23$578
Dec 20180346.594.19$13
Nov 201831352.934.24$214
Oct 201801461.443.40$48
Sep 20180159.543.11$3
Aug 20184759.403.07$259
Jul 201801265.142.93$35
Jun 201801260.183.08$37
May 201811265.382.90$100
Apr 201801363.842.90$38
Mar 201801661.222.79$45
Feb 20180161.782.77$3
Jan 20180962.874.01$36
Dec 201701357.272.92$38
Nov 201701155.423.12$34
Oct 201701149.292.98$33
Sep 201701147.523.09$34
Aug 201701145.373.00$33
Jul 201701143.873.09$34
Jun 20170842.493.09$25
May 201701545.373.26$49
Apr 201701747.933.21$55
Mar 201732046.772.98$200
Feb 201701550.452.95$44
Jan 201703449.413.42$116
Dec 20160748.763.72$26
Nov 20160642.492.64$16
Oct 201601546.193.09$46
Sep 20160741.553.10$22
Aug 20160941.442.92$26
Jul 20160641.622.92$18
Jun 201602545.352.69$67
May 20160142.521.99$2
Apr 20160336.561.99$6
Mar 201604033.011.79$72
Feb 201602426.472.06$50
Jan 201603827.352.36$90
Dec 201507832.362.00$156
Nov 201501138.792.17$24
Oct 201511443.552.43$78
Sep 20150542.992.76$14
Aug 201561240.162.87$275
Jul 201502648.152.95$77
Jun 201502456.152.88$69
May 201501655.212.96$47
Apr 201545149.822.71$337
Mar 201505442.892.93$158
Feb 201503844.662.98$113
Jan 201509643.433.10$298
Dec 201406254.693.59$223
Nov 201409170.464.25$387
Oct 2014016478.303.90$640
Sep 2014015486.164.05$623
Aug 2014022989.394.04$924
Jul 2014018496.564.18$769
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 201431995.895.06$384
Feb 201406797.406.19$415
Jan 201401590.404.86$73
Dec 201308891.824.35$383
Nov 2013053288.853.74$1,989
Oct 2013051097.423.78$1,927
Sep 20130664104.113.72$2,469
Aug 20130656104.253.52$2,311
Jul 20130709102.523.72$2,636
Jun 2013069094.403.93$2,714
May 2013071194.834.15$2,950
Apr 2013073893.964.28$3,161
Mar 2013080693.623.91$3,154
Feb 2013073091.233.42$2,497
Jan 2013081191.603.42$2,774
Dec 2012083686.773.42$2,859
Nov 2012080786.953.62$2,925
Oct 2012088689.383.40$3,012
Sep 2012088294.672.92$2,574
Aug 2012092392.662.91$2,684
Jul 2012090885.133.02$2,743
Jun 2012091479.822.52$2,302
May 2012095591.612.49$2,376
Apr 20120927101.652.00$1,851
Mar 20120983105.052.22$2,184
Feb 20120931101.102.57$2,393
Jan 201201,09498.092.73$2,991
Dec 2011069996.873.24$2,265
Nov 2011087495.723.31$2,894
Oct 201101,10384.983.65$4,024
Sep 2011081783.623.99$3,256
Aug 201101,16983.404.15$4,851
Jul 201101,25194.144.52$5,651
Jun 201101,15692.904.64$5,364
May 201101,31798.134.40$5,801
Apr 20110884105.964.33$3,831
Mar 201101,27696.364.06$5,177
Feb 201101,15385.644.18$4,820
Jan 201101,35686.504.59$6,222
Dec 201001,37785.734.35$5,987
Nov 201001,33280.843.80$5,055
Oct 201001,37378.103.51$4,818
Sep 201001,45372.633.98$5,782
Aug 201001,51773.684.42$6,704
Jul 201001,64072.554.74$7,768
Jun 201001,66370.364.91$8,166
May 201001,71871.124.24$7,276
Apr 201001,71681.694.12$7,075
Mar 201001,77778.394.39$7,799
Feb 201001,67473.585.44$9,111
Jan 201001,86474.365.96$11,117
Dec 200901,88471.445.48$10,331
Nov 200901,84374.593.75$6,914
Oct 200901,88872.544.11$7,760
Sep 200901,83365.543.06$5,618
Aug 200901,87367.423.22$6,028
Jul 200901,86361.133.46$6,454
Jun 200901,76766.163.90$6,882
May 200901,15054.743.93$4,515
Apr 200904446.773.59$158
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090335.865.37$16
Dec 200801,59437.105.98$9,528
Nov 200802,57055.496.86$17,631
Oct 200802,69875.246.92$18,676
Sep 200802,651101.767.88$20,882
Aug 200802,866114.228.48$24,312
Jul 200802,767131.0811.39$31,515
Jun 200852,920131.3313.03$38,712
May 2008123,147123.1711.57$37,902
Apr 2008183,150110.3110.45$34,918
Mar 200803,344101.909.66$32,317
Feb 200803,23192.538.77$28,338
Jan 2008233,50590.388.21$30,840
Dec 200703,59088.337.30$26,214
Nov 2007223,68691.677.29$28,894
Oct 200703,66882.856.92$25,390
Sep 2007223,28575.846.24$22,181
Aug 200703,71269.066.39$23,712
Jul 2007223,79970.906.39$25,828
Jun 2007253,98762.007.55$31,646
May 200704,41658.747.85$34,649
Apr 2007274,38059.617.81$35,796
Mar 2007274,54756.927.30$34,739
Feb 200704,36955.108.22$35,896
Jan 200705,04150.306.73$33,910
Dec 2006295,11656.656.92$37,038
Nov 200604,95754.207.62$37,760
Oct 2006295,30854.906.01$33,513
Sep 200605,24160.085.04$26,400
Aug 2006245,40568.717.34$41,321
Jul 2006245,68769.376.34$37,736
Jun 2006225,18566.286.38$34,559
May 2006236,03566.016.42$40,293
Apr 2006206,26264.397.36$47,379
Mar 2006196,66356.707.08$48,271
Feb 200606,31157.597.75$48,917
Jan 2006237,06760.598.93$64,525
Dec 200507,35354.9413.42$98,643
Nov 200507,51854.6910.59$79,604
Oct 2005318,04258.3413.80$112,754
Sep 2005358,28161.4512.08$102,177
Aug 2005399,29561.519.80$93,461
Jul 2005379,86955.697.84$79,469
Jun 2005469,90252.337.38$75,494
May 2005011,20245.226.65$74,506
Apr 20052912,24249.207.36$91,534
Mar 2005013,60850.377.15$97,364
Feb 200507,59445.226.31$47,933

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 76.09 =         $0
Gas                    1 Mcf  × $  1.78 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/211092 is the state's own key, not one this site invented.