VALLIANT

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211246District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Feb 2005 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
256
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18161600
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition193 bbl$11,102
GasProduction214,806 Mcf$1,271,412
Total$1,282,514

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5156, -100.8509. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51557, -100.85090 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,600 ft.

Completions filed
Feb 2005
1 of 1 wells

1 well

42-43537136118,600 ftFeb 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (256)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

256 months

May 20260364106.413.05$1,109
Apr 2026034498.932.87$987
Mar 2026020189.753.15$633
Feb 202602163.503.75$79
Jan 202608959.138.00$712
Dec 2025020256.664.41$892
Nov 2025032458.593.93$1,272
Oct 2025037359.383.30$1,233
Sep 2025038762.743.08$1,191
Aug 2025042863.933.01$1,290
Jul 2025044566.743.32$1,475
Jun 2025042066.483.13$1,314
May 2025048060.553.23$1,552
Apr 2025054962.363.54$1,945
Mar 2025035867.704.27$1,528
Feb 2025031270.884.34$1,354
Jan 2025033274.324.28$1,421
Dec 2024030968.993.12$965
Nov 2024030769.052.20$675
Oct 2024036971.372.28$842
Sep 2024027569.612.36$650
Aug 2024028775.632.06$592
Jul 2024026179.932.15$560
Jun 2024033478.082.63$880
May 2024026978.812.20$591
Apr 2024032584.451.66$539
Mar 2024034380.301.55$530
Feb 2024027576.091.78$491
Jan 2024032273.023.30$1,062
Dec 2023030471.262.61$794
Nov 2023030377.892.81$851
Oct 2023029385.443.09$905
Sep 2023027189.042.74$741
Aug 2023029980.522.67$799
Jul 2023034474.852.64$909
Jun 2023029568.962.26$666
May 2023034170.622.23$760
Apr 2023025178.122.24$562
Mar 2023039772.852.39$950
Feb 2023026875.112.47$661
Jan 2023031876.533.39$1,077
Dec 2022029176.415.73$1,667
Nov 2022035185.005.65$1,982
Oct 2022037687.185.86$2,205
Sep 2022032684.888.16$2,661
Aug 2022041594.529.13$3,788
Jul 20220363101.587.54$2,738
Jun 20220419115.097.98$3,342
May 20220457109.378.43$3,854
Apr 20220394104.226.84$2,694
Mar 20220404108.885.08$2,051
Feb 2022035091.054.86$1,701
Jan 2022037681.844.54$1,706
Dec 2021039171.323.90$1,525
Nov 2021038077.435.24$1,990
Oct 2021039179.795.71$2,234
Sep 2021041369.865.35$2,210
Aug 2021043966.024.22$1,853
Jul 2021039370.783.98$1,565
Jun 2021042769.493.38$1,444
May 2021043963.483.02$1,325
Apr 2021044660.362.76$1,230
Mar 2021047461.302.72$1,288
Feb 2021036757.805.55$2,036
Jan 2021042850.412.81$1,203
Dec 2020065644.642.68$1,755
Nov 2020046638.772.71$1,261
Oct 2020048036.972.48$1,190
Sep 2020047337.091.99$942
Aug 2020044139.982.39$1,052
Jul 2020044538.371.83$812
Jun 2020047834.901.69$808
May 2020045816.921.81$831
Apr 2020046114.751.80$832
Mar 2020049530.341.86$919
Feb 2020043049.881.98$852
Jan 2020048357.252.09$1,012
Dec 2019048559.012.30$1,118
Nov 2019046455.302.75$1,276
Oct 2019049753.472.42$1,202
Sep 2019053955.052.66$1,432
Aug 2019047053.112.30$1,083
Jul 2019051156.272.46$1,257
Jun 2019042752.782.49$1,064
May 2019049858.482.74$1,365
Apr 2019048162.632.75$1,323
Mar 2019053956.803.06$1,650
Feb 2019051250.852.79$1,430
Jan 2019054346.033.23$1,753
Dec 2018052446.594.19$2,193
Nov 2018054052.934.24$2,288
Oct 2018056461.443.40$1,917
Sep 2018055959.543.11$1,737
Aug 2018057459.403.07$1,760
Jul 2018053665.142.93$1,571
Jun 2018047560.183.08$1,462
May 2018055165.382.90$1,598
Apr 2018051863.842.90$1,503
Mar 2018044861.222.79$1,249
Feb 2018044161.782.77$1,220
Jan 2018029362.874.01$1,175
Dec 2017036857.272.92$1,075
Nov 2017034955.423.12$1,088
Oct 2017037049.292.98$1,104
Sep 2017042447.523.09$1,309
Aug 2017045645.373.00$1,370
Jul 2017045543.873.09$1,405
Jun 2017049042.493.09$1,513
May 2017057945.373.26$1,890
Apr 2017046447.933.21$1,490
Mar 2017051546.772.98$1,537
Feb 2017032050.452.95$945
Jan 2017034549.413.42$1,179
Dec 2016030348.763.72$1,128
Nov 2016030842.492.64$814
Oct 2016036246.193.09$1,119
Sep 2016035741.553.10$1,107
Aug 2016040741.442.92$1,190
Jul 2016038541.622.92$1,126
Jun 2016039945.352.69$1,072
May 2016043042.521.99$856
Apr 2016049236.561.99$980
Mar 2016052833.011.79$947
Feb 2016023926.472.06$493
Jan 2016019727.352.36$466
Dec 2015024832.362.00$496
Nov 2015040438.792.17$876
Oct 2015044543.552.43$1,080
Sep 2015037742.992.76$1,040
Aug 2015066640.162.87$1,913
Jul 2015123348.152.95$734
Jun 2015042456.152.88$1,222
May 2015044255.212.96$1,306
Apr 2015038349.822.71$1,037
Mar 2015031742.892.93$930
Feb 2015032244.662.98$958
Jan 2015046643.433.10$1,445
Dec 2014053454.693.59$1,918
Nov 2014039270.464.25$1,667
Oct 2014039978.303.90$1,556
Sep 2014043986.164.05$1,776
Aug 2014043289.394.04$1,743
Jul 2014061096.564.18$2,550
Jun 2014019098.164.74$900
May 2014045994.734.73$2,169
Apr 2014038695.944.81$1,856
Mar 2014040095.895.06$2,023
Feb 2014033897.406.19$2,093
Jan 2014038790.404.86$1,881
Dec 2013040691.824.35$1,768
Nov 2013040188.853.74$1,499
Oct 2013049597.423.78$1,871
Sep 20130408104.113.72$1,517
Aug 20130428104.253.52$1,508
Jul 20130506102.523.72$1,881
Jun 2013052694.403.93$2,069
May 2013050894.834.15$2,108
Apr 2013048193.964.28$2,060
Mar 2013057093.623.91$2,230
Feb 2013063191.233.42$2,158
Jan 2013071991.603.42$2,459
Dec 2012071086.773.42$2,428
Nov 2012070686.953.62$2,559
Oct 2012073289.383.40$2,489
Sep 2012071294.672.92$2,078
Aug 2012077192.662.91$2,242
Jul 2012078285.133.02$2,362
Jun 2012078279.822.52$1,970
May 2012081391.612.49$2,023
Apr 20120815101.652.00$1,627
Mar 20120827105.052.22$1,838
Feb 20120766101.102.57$1,969
Jan 2012088698.092.73$2,422
Dec 2011075496.873.24$2,443
Nov 2011054995.723.31$1,818
Oct 2011051284.983.65$1,868
Sep 2011062283.623.99$2,479
Aug 2011078683.404.15$3,261
Jul 2011083494.144.52$3,767
Jun 2011083592.904.64$3,874
May 2011084598.134.40$3,722
Apr 20110820105.964.33$3,553
Mar 2011083496.364.06$3,384
Feb 2011076685.644.18$3,202
Jan 2011081286.504.59$3,726
Dec 2010079285.734.35$3,443
Nov 2010081480.843.80$3,089
Oct 2010084978.103.51$2,979
Sep 2010085872.633.98$3,414
Aug 2010091873.684.42$4,057
Jul 2010095172.554.74$4,504
Jun 2010077270.364.91$3,791
May 2010058771.124.24$2,486
Apr 2010053981.694.12$2,222
Mar 2010055378.394.39$2,427
Feb 2010046073.585.44$2,503
Jan 2010063974.365.96$3,811
Dec 2009069071.445.48$3,784
Nov 2009060374.593.75$2,262
Oct 2009084372.544.11$3,465
Sep 2009099065.543.06$3,034
Aug 200901,05667.423.22$3,399
Jul 200901,08361.133.46$3,752
Jun 200901,04966.163.90$4,086
May 200901,09854.743.93$4,310
Apr 2009098546.773.59$3,534
Mar 200901,06942.144.06$4,339
Feb 200921,00632.814.63$4,726
Jan 200901,13735.865.37$6,107
Dec 200801,19637.105.98$7,149
Nov 200801,22155.496.86$8,377
Oct 200801,26775.246.92$8,770
Sep 200801,091101.767.88$8,594
Aug 200801,123114.228.48$9,526
Jul 200801,204131.0811.39$13,713
Jun 200801,105131.3313.03$14,401
May 200801,232123.1711.57$14,260
Apr 200801,279110.3110.45$13,372
Mar 200801,328101.909.66$12,834
Feb 200801,44992.538.77$12,709
Jan 200801,52490.388.21$12,506
Dec 200701,37888.337.30$10,062
Nov 200702,09991.677.29$15,305
Oct 200702,26582.856.92$15,678
Sep 2007033375.846.24$2,079
Aug 200721,59269.066.39$10,308
Jul 200701,71470.906.39$10,949
Jun 200701,68262.007.55$12,696
May 200701,80458.747.85$14,155
Apr 200701,71759.617.81$13,402
Mar 200721,87556.927.30$13,805
Feb 200731,76255.108.22$14,642
Jan 200701,96150.306.73$13,191
Dec 200601,83056.656.92$12,661
Nov 2006231,95754.207.62$16,154
Oct 2006202,11054.906.01$13,787
Sep 200602,12560.085.04$10,704
Aug 200602,33668.717.34$17,146
Jul 200602,46569.376.34$15,635
Jun 2006272,45066.286.38$17,430
May 200602,59766.016.42$16,686
Apr 200602,62364.397.36$19,307
Mar 200602,83756.707.08$20,094
Feb 200632,61057.597.75$20,403
Jan 2006393,09260.598.93$29,985
Dec 2005713,28354.9413.42$47,944
Nov 200503,34754.6910.59$35,439
Oct 200503,67758.3413.80$50,727
Sep 200503,66061.4512.08$44,209
Aug 200503,99961.519.80$39,178
Jul 200504,25155.697.84$33,343
Jun 200504,64352.337.38$34,270
May 200505,00345.226.65$33,276
Apr 200504,78349.207.36$35,205
Mar 200505,43250.377.15$38,865
Feb 200504,31545.226.31$27,236

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  364 Mcf  × $  3.05 =     $1,109

────────────────────────────────────────────────────
Month total                                   $1,109

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/211246 is the state's own key, not one this site invented.