Operated by HILCORP ENERGY COMPANY (P-5 386310) in the POULTER (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212126District 7CField 727363752 tax incentive programmesCondensateGasSaveExport
Value, all time
$849 k
Aug 2005 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
250
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 17 leases and 17 wells, and the rule below applies to all of them.

Discovered
2004-05-29
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2005.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-05-22168624
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition643 bbl$44,061
GasProduction110,184 Mcf$804,880
Total$848,941

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4293, -101.9657. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42934, -101.96569 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,970 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,970 ft.

Completions filed
Aug 2005
1 of 1 wells

1 well

42-44331110410,970 ftAug 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (250)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

250 months

May 202600106.413.05$0
Apr 202605598.932.87$158
Mar 20260089.753.15$0
Feb 202619363.503.75$412
Jan 202606559.138.00$520
Dec 202508256.664.41$362
Nov 2025010458.593.93$408
Oct 202503259.383.30$106
Sep 202507162.743.08$218
Aug 202506663.933.01$199
Jul 2025010966.743.32$361
Jun 2025210266.483.13$452
May 202504860.553.23$155
Apr 202506662.363.54$234
Mar 202503567.704.27$149
Feb 202504270.884.34$182
Jan 20250674.324.28$26
Dec 202409668.993.12$300
Nov 2024016969.052.20$372
Oct 2024012671.372.28$287
Sep 20240069.612.36$0
Aug 202409575.632.06$196
Jul 2024020079.932.15$429
Jun 2024015778.082.63$414
May 20240078.812.20$0
Apr 202403584.451.66$58
Mar 202408780.301.55$134
Feb 202407776.091.78$137
Jan 202408073.023.30$264
Dec 202305171.262.61$133
Nov 202309177.892.81$255
Oct 202309485.443.09$290
Sep 202307289.042.74$197
Aug 2023011880.522.67$315
Jul 2023011174.852.64$293
Jun 202309668.962.26$217
May 2023011970.622.23$265
Apr 202308378.122.24$186
Mar 202306272.852.39$148
Feb 202304275.112.47$104
Jan 2023012776.533.39$430
Dec 202205576.415.73$315
Nov 202206985.005.65$390
Oct 202204087.185.86$235
Sep 202205084.888.16$408
Aug 202208194.529.13$739
Jul 2022086101.587.54$649
Jun 20220113115.097.98$901
May 20220105109.378.43$885
Apr 2022099104.226.84$677
Mar 20220130108.885.08$660
Feb 202204891.054.86$233
Jan 202206181.844.54$277
Dec 2021011271.323.90$437
Nov 2021018177.435.24$948
Oct 2021017079.795.71$971
Sep 202108969.865.35$476
Aug 202109566.024.22$401
Jul 202104570.783.98$179
Jun 202106869.493.38$230
May 202103563.483.02$106
Apr 202109360.362.76$257
Mar 202107361.302.72$198
Feb 202107057.805.55$388
Jan 202108050.412.81$225
Dec 202009044.642.68$241
Nov 202008838.772.71$238
Oct 2020011136.972.48$275
Sep 2020010137.091.99$201
Aug 2020014839.982.39$353
Jul 2020011738.371.83$214
Jun 202009,55634.901.69$16,153
May 2020011916.921.81$216
Apr 2020023514.751.80$424
Mar 202007730.341.86$143
Feb 20200049.881.98$0
Jan 202013957.252.09$139
Dec 201918559.012.30$255
Nov 201909555.302.75$261
Oct 2019019053.472.42$460
Sep 2019036755.052.66$975
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201915756.803.06$231
Feb 201928250.852.79$331
Jan 201902746.033.23$87
Dec 201823946.594.19$256
Nov 201803552.934.24$148
Oct 201846361.443.40$460
Sep 201805859.543.11$180
Aug 201865959.403.07$537
Jul 201804765.142.93$138
Jun 2018010060.183.08$308
May 201888565.382.90$770
Apr 2018010463.842.90$302
Mar 2018021861.222.79$608
Feb 201807061.782.77$194
Jan 2018127562.874.01$1,055
Dec 201705857.272.92$169
Nov 2017613655.423.12$757
Oct 2017312449.292.98$518
Sep 201701,11747.523.09$3,448
Aug 2017011345.373.00$340
Jul 201756143.873.09$408
Jun 201706542.493.09$201
May 201706445.373.26$209
Apr 201707247.933.21$231
Mar 2017010346.772.98$307
Feb 2017116050.452.95$732
Jan 201707949.413.42$270
Dec 201668448.763.72$605
Nov 201617542.492.64$241
Oct 20161710446.193.09$1,107
Sep 2016021141.553.10$654
Aug 201608141.442.92$237
Jul 201658941.622.92$468
Jun 201608245.352.69$220
May 2016210542.521.99$294
Apr 201639036.561.99$289
Mar 201626933.011.79$190
Feb 2016311326.472.06$313
Jan 201607627.352.36$180
Dec 201559532.362.00$352
Nov 2015015238.792.17$329
Oct 201529943.552.43$327
Sep 201508642.992.76$237
Aug 2015410340.162.87$457
Jul 201506548.152.95$191
Jun 201507656.152.88$219
May 201535655.212.96$331
Apr 2015010349.822.71$279
Mar 201552542.892.93$288
Feb 2015210744.662.98$408
Jan 201534843.433.10$279
Dec 201437554.693.59$433
Nov 201435170.464.25$428
Oct 201404278.303.90$164
Sep 201409486.164.05$380
Aug 201422789.394.04$288
Jul 201408996.564.18$372
Jun 2014310698.164.74$797
May 2014119294.734.73$1,002
Apr 2014010195.944.81$486
Mar 2014121095.895.06$1,158
Feb 201406997.406.19$427
Jan 201405290.404.86$253
Dec 201307491.824.35$322
Nov 2013010988.853.74$407
Oct 2013012297.423.78$461
Sep 20130172104.113.72$639
Aug 20130219104.253.52$771
Jul 2013097102.523.72$361
Jun 2013019794.403.93$775
May 2013013294.834.15$548
Apr 201309993.964.28$424
Mar 201309193.623.91$356
Feb 201307891.233.42$267
Jan 201308391.603.42$284
Dec 201208786.773.42$298
Nov 201209386.953.62$337
Oct 201209289.383.40$313
Sep 201209894.672.92$286
Aug 2012011992.662.91$346
Jul 2012011785.133.02$353
Jun 201209079.822.52$227
May 2012019691.612.49$488
Apr 20120393101.652.00$785
Mar 20121350105.052.22$14,182
Feb 201200101.102.57$0
Jan 20121098.092.73$98
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20111092.904.64$93
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 2011010896.364.06$438
Feb 2011423685.644.18$1,329
Jan 2011316286.504.59$1,003
Dec 2010218085.734.35$954
Nov 2010027180.843.80$1,029
Oct 2010026778.103.51$937
Sep 2010129772.633.98$1,255
Aug 2010059873.684.42$2,643
Jul 2010036172.554.74$1,710
Jun 2010041870.364.91$2,053
May 2010025171.124.24$1,063
Apr 2010010081.694.12$412
Mar 2010023578.394.39$1,031
Feb 2010020573.585.44$1,116
Jan 2010015674.365.96$930
Dec 2009016371.445.48$894
Nov 2009017274.593.75$645
Oct 2009011772.544.11$481
Sep 2009026765.543.06$818
Aug 2009021567.423.22$692
Jul 2009015561.133.46$537
Jun 2009017266.163.90$670
May 2009021654.743.93$848
Apr 2009026846.773.59$961
Mar 2009020042.144.06$812
Feb 2009022732.814.63$1,052
Jan 2009041035.865.37$2,202
Dec 2008029637.105.98$1,769
Nov 2008027055.496.86$1,852
Oct 2008018575.246.92$1,281
Sep 20080161101.767.88$1,268
Aug 200801,303114.228.48$11,053
Jul 20080897131.0811.39$10,216
Jun 200801,851131.3313.03$24,123
May 200801,286123.1711.57$14,885
Apr 20080577110.3110.45$6,032
Mar 200801,737101.909.66$16,786
Feb 200801,31292.538.77$11,507
Jan 2008069290.388.21$5,678
Dec 2007048588.337.30$3,541
Nov 200701,95191.677.29$14,226
Oct 200703,32482.856.92$23,009
Sep 200702,06075.846.24$12,863
Aug 200701,03869.066.39$6,631
Jul 200701,78870.906.39$11,422
Jun 200717678162.007.55$16,807
May 20071792,02958.747.85$26,435
Apr 200701,89259.617.81$14,767
Mar 200701,26156.927.30$9,208
Feb 200701,03855.108.22$8,528
Jan 200702,12550.306.73$14,295
Dec 200601,70156.656.92$11,768
Nov 200605,41654.207.62$41,256
Oct 200604,46954.906.01$26,876
Sep 200601,27660.085.04$6,427
Aug 200601,09768.717.34$8,052
Jul 2006042469.376.34$2,689
Jun 2006041266.286.38$2,630
May 2006050266.016.42$3,225
Apr 2006070364.397.36$5,174
Mar 200602,03256.707.08$14,392
Feb 200602,72157.597.75$21,091
Jan 200603,99760.598.93$35,706
Dec 200506,39954.9413.42$85,845
Nov 200504,41454.6910.59$46,737
Oct 200501,80558.3413.80$24,901
Sep 2005010,18961.4512.08$123,073
Aug 20050061.519.80$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   55 Mcf  × $  2.87 =       $158

────────────────────────────────────────────────────
Month total                                     $158

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/212126 is the state's own key, not one this site invented.