WILSON, DUKE

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213077District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
May 2005 – May 2026
Value, last 12 filed months
$48 k
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13164613
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition117 bbl$7,782
GasProduction539,104 Mcf$3,058,133
Total$3,065,915

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4081, -100.7690. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40812, -100.76901 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,103 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,103 ft.

Completions filed
May 2005
1 of 1 wells

1 well

42-4353727540179,103 ftMay 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

May 202611,173106.413.05$3,679
Apr 202631,05398.932.87$3,319
Mar 2026396489.753.15$3,305
Feb 2026398063.503.75$3,866
Jan 2026088259.138.00$7,054
Dec 202551,10956.664.41$5,178
Nov 202511,10258.593.93$4,386
Oct 202531,12259.383.30$3,886
Sep 202501,05262.743.08$3,237
Aug 202531,14363.933.01$3,638
Jul 202511,00566.743.32$3,399
Jun 202501,02166.483.13$3,194
May 2025199660.553.23$3,280
Apr 202551,09662.363.54$4,195
Mar 202531,14767.704.27$5,099
Feb 202521,05370.884.34$4,713
Jan 202521,19774.324.28$5,270
Dec 202421,21868.993.12$3,940
Nov 202421,22569.052.20$2,831
Oct 202421,24271.372.28$2,976
Sep 202441,24569.612.36$3,222
Aug 202421,26475.632.06$2,760
Jul 202441,30579.932.15$3,121
Jun 202421,27978.082.63$3,525
May 202421,31478.812.20$3,046
Apr 202471,42684.451.66$2,957
Mar 202421,53980.301.55$2,539
Feb 202451,44176.091.78$2,951
Jan 202461,64073.023.30$5,846
Dec 202361,72471.262.61$4,928
Nov 202331,68777.892.81$4,970
Oct 202321,85885.443.09$5,907
Sep 202301,77889.042.74$4,863
Aug 202301,75180.522.67$4,680
Jul 2023053774.852.64$1,419
Jun 2023012768.962.26$287
May 20230170.622.23$2
Apr 20230078.122.24$0
Mar 202301172.852.39$26
Feb 20230375.112.47$7
Jan 202306876.533.39$230
Dec 202205576.415.73$315
Nov 202202885.005.65$158
Oct 2022014087.185.86$821
Sep 20220884.888.16$65
Aug 2022048294.529.13$4,399
Jul 20220961101.587.54$7,248
Jun 20220944115.097.98$7,530
May 20220992109.378.43$8,366
Apr 20220923104.226.84$6,311
Mar 20220958108.885.08$4,863
Feb 2022086891.054.86$4,217
Jan 2022097481.844.54$4,420
Dec 2021095971.323.90$3,739
Nov 2021093077.435.24$4,870
Oct 2021097579.795.71$5,571
Sep 2021094969.865.35$5,078
Aug 2021098466.024.22$4,153
Jul 2021098870.783.98$3,934
Jun 2021098969.493.38$3,343
May 202101,00863.483.02$3,042
Apr 2021098160.362.76$2,706
Mar 202101,08461.302.72$2,945
Feb 2021086357.805.55$4,788
Jan 202101,01550.412.81$2,852
Dec 202001,00144.642.68$2,678
Nov 2020096938.772.71$2,623
Oct 202001,01236.972.48$2,508
Sep 2020098337.091.99$1,957
Aug 202001,03339.982.39$2,464
Jul 202001,03938.371.83$1,896
Jun 202001,00434.901.69$1,697
May 202001,03616.921.81$1,880
Apr 2020099814.751.80$1,801
Mar 202001,03130.341.86$1,914
Feb 2020097349.881.98$1,927
Jan 202001,04057.252.09$2,179
Dec 201901,05259.012.30$2,424
Nov 201901,01155.302.75$2,781
Oct 201901,01953.472.42$2,464
Sep 201901,03855.052.66$2,758
Aug 201901,08553.112.30$2,500
Jul 201901,08956.272.46$2,679
Jun 201901,06752.782.49$2,658
May 201901,09958.482.74$3,012
Apr 201901,06262.632.75$2,921
Mar 201901,10556.803.06$3,384
Feb 201901,00250.852.79$2,798
Jan 201901,11646.033.23$3,603
Dec 201801,11946.594.19$4,684
Nov 201801,08952.934.24$4,614
Oct 201811,12461.443.40$3,881
Sep 201801,09859.543.11$3,413
Aug 201801,14559.403.07$3,511
Jul 201801,15665.142.93$3,389
Jun 201801,12760.183.08$3,468
May 201801,17165.382.90$3,397
Apr 201801,12963.842.90$3,275
Mar 201801,18261.222.79$3,294
Feb 201801,06761.782.77$2,951
Jan 201801,26662.874.01$5,076
Dec 201701,20357.272.92$3,515
Nov 201711,20255.423.12$3,804
Oct 201711,29249.292.98$3,904
Sep 201711,26147.523.09$3,941
Aug 201721,36245.373.00$4,183
Jul 201701,52643.873.09$4,711
Jun 201731,36842.493.09$4,351
May 201711,17745.373.26$3,886
Apr 201711,15647.933.21$3,761
Mar 201721,22646.772.98$3,752
Feb 201721,17050.452.95$3,555
Jan 201711,01849.413.42$3,530
Dec 2016181548.763.72$3,083
Nov 2016178942.492.64$2,129
Oct 2016180346.193.09$2,528
Sep 2016076741.553.10$2,378
Aug 2016178941.442.92$2,349
Jul 2016078641.622.92$2,299
Jun 2016175245.352.69$2,065
May 2016077042.521.99$1,533
Apr 2016072536.561.99$1,444
Mar 2016262033.011.79$1,178
Feb 201601,45226.472.06$2,996
Jan 201611,92927.352.36$4,588
Dec 201511,64132.362.00$3,317
Nov 201501,36938.792.17$2,967
Oct 2015114143.552.43$386
Sep 201511,00942.992.76$2,826
Aug 201511,71840.162.87$4,975
Jul 201511,54148.152.95$4,587
Jun 201501,66156.152.88$4,788
May 201501,70255.212.96$5,030
Apr 201501,67949.822.71$4,544
Mar 201501,66442.892.93$4,883
Feb 201501,55744.662.98$4,634
Jan 201501,71243.433.10$5,308
Dec 201401,69254.693.59$6,077
Nov 201401,69070.464.25$7,186
Oct 201401,80078.303.90$7,022
Sep 201401,77486.164.05$7,177
Aug 201401,72389.394.04$6,953
Jul 201411,84296.564.18$7,795
Jun 201401,80498.164.74$8,545
May 201401,70994.734.73$8,078
Apr 201401,60595.944.81$7,719
Mar 201401,94395.895.06$9,825
Feb 201401,66697.406.19$10,316
Jan 201401,93890.404.86$9,420
Dec 201301,88291.824.35$8,195
Nov 201301,86488.853.74$6,968
Oct 201301,91697.423.78$7,241
Sep 201301,889104.113.72$7,023
Aug 201301,995104.253.52$7,028
Jul 201302,011102.523.72$7,476
Jun 201301,94294.403.93$7,639
May 201302,03494.834.15$8,439
Apr 201302,00693.964.28$8,591
Mar 201302,04393.623.91$7,994
Feb 201301,82891.233.42$6,252
Jan 201302,07991.603.42$7,110
Dec 201201,83386.773.42$6,269
Nov 201202,01686.953.62$7,308
Oct 201201,90889.383.40$6,487
Sep 201202,04594.672.92$5,968
Aug 201202,09892.662.91$6,101
Jul 201202,00085.133.02$6,042
Jun 201202,01079.822.52$5,063
May 201202,16491.612.49$5,385
Apr 201202,160101.652.00$4,313
Mar 201202,164105.052.22$4,809
Feb 201201,921101.102.57$4,937
Jan 201202,24198.092.73$6,127
Dec 201102,27696.873.24$7,374
Nov 201102,34295.723.31$7,755
Oct 201101,83284.983.65$6,684
Sep 201102,24083.623.99$8,928
Aug 201102,32783.404.15$9,655
Jul 201102,39994.144.52$10,837
Jun 201102,29492.904.64$10,644
May 201102,42098.134.40$10,660
Apr 201102,363105.964.33$10,240
Mar 201102,54596.364.06$10,326
Feb 201102,25985.644.18$9,443
Jan 201102,04886.504.59$9,398
Dec 201002,09885.734.35$9,122
Nov 201002,45480.843.80$9,314
Oct 201002,55878.103.51$8,976
Sep 201002,48172.633.98$9,873
Aug 201002,61673.684.42$11,561
Jul 201002,48172.554.74$11,751
Jun 201002,53270.364.91$12,433
May 201002,68671.124.24$11,376
Apr 201002,60881.694.12$10,752
Mar 201002,72678.394.39$11,964
Feb 201002,48873.585.44$13,541
Jan 201002,78574.365.96$16,610
Dec 200902,81371.445.48$15,426
Nov 200902,78574.593.75$10,448
Oct 200902,85472.544.11$11,731
Sep 200902,76965.543.06$8,486
Aug 200902,75467.423.22$8,864
Jul 200902,69561.133.46$9,337
Jun 200902,61866.163.90$10,197
May 200902,85654.743.93$11,212
Apr 200902,76946.773.59$9,934
Mar 200903,00342.144.06$12,189
Feb 200902,87232.814.63$13,306
Jan 200903,24035.865.37$17,402
Dec 200803,29837.105.98$19,713
Nov 200803,24955.496.86$22,289
Oct 200803,32275.246.92$22,995
Sep 200803,269101.767.88$25,750
Aug 200803,430114.228.48$29,097
Jul 200803,543131.0811.39$40,353
Jun 200803,392131.3313.03$44,207
May 200803,641123.1711.57$42,142
Apr 200803,939110.3110.45$41,182
Mar 200802,507101.909.66$24,228
Feb 200803,55292.538.77$31,153
Jan 200803,77490.388.21$30,968
Dec 200704,01788.337.30$29,332
Nov 200703,71891.677.29$27,111
Oct 200704,03782.856.92$27,944
Sep 200703,94475.846.24$24,627
Aug 200704,28569.066.39$27,372
Jul 200704,19870.906.39$26,817
Jun 200704,24462.007.55$32,036
May 200704,31158.747.85$33,825
Apr 200704,29059.617.81$33,484
Mar 200704,59556.927.30$33,553
Feb 200704,27455.108.22$35,115
Jan 200704,90350.306.73$32,982
Dec 200604,94456.656.92$34,205
Nov 200604,76654.207.62$36,305
Oct 200605,10754.906.01$30,712
Sep 200604,96960.085.04$25,030
Aug 200605,32668.717.34$39,092
Jul 200605,50469.376.34$34,911
Jun 200605,64866.286.38$36,056
May 200606,03866.016.42$38,794
Apr 200606,11764.397.36$45,024
Mar 200606,74056.707.08$47,739
Feb 200606,40657.597.75$49,654
Jan 200607,57060.598.93$67,625
Dec 200507,75154.9413.42$103,983
Nov 200508,19354.6910.59$86,751
Oct 200509,15558.3413.80$126,300
Sep 200509,49461.4512.08$114,678
Aug 2005010,21861.519.80$100,104
Jul 2005011,47455.697.84$89,998
Jun 2005012,74552.337.38$94,071
May 200503,36145.226.65$22,355

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                1,173 Mcf  × $  3.05 =     $3,573

────────────────────────────────────────────────────
Month total                                   $3,679

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213077 is the state's own key, not one this site invented.