VALLIANT, L. R.

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213802District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.9 M
Jun 2005 – May 2026
Value, last 12 filed months
$33 k
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13165062
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition59 bbl$3,590
GasProduction477,832 Mcf$2,875,689
Total$2,879,279

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5020, -100.8507. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50204, -100.85073 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,571 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,571 ft.

Completions filed
Jun 2005
1 of 1 wells

1 well

42-43537421218,571 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 20260404106.413.05$1,231
Apr 2026041298.932.87$1,182
Mar 2026058389.753.15$1,836
Feb 2026062563.503.75$2,344
Jan 202601,37759.138.00$11,013
Dec 2025074456.664.41$3,284
Nov 2025061458.593.93$2,411
Oct 2025054559.383.30$1,801
Sep 2025066362.743.08$2,040
Aug 2025075563.933.01$2,276
Jul 2025054266.743.32$1,797
Jun 2025069166.483.13$2,162
May 2025063460.553.23$2,049
Apr 2025068062.363.54$2,409
Mar 2025078567.704.27$3,351
Feb 2025057770.884.34$2,505
Jan 2025077074.324.28$3,295
Dec 2024075268.993.12$2,347
Nov 2024076069.052.20$1,671
Oct 2024078271.372.28$1,784
Sep 2024077869.612.36$1,839
Aug 2024080475.632.06$1,659
Jul 2024081679.932.15$1,752
Jun 2024075578.082.63$1,989
May 2024084178.812.20$1,849
Apr 2024080984.451.66$1,342
Mar 2024085280.301.55$1,316
Feb 2024072276.091.78$1,288
Jan 2024080773.023.30$2,661
Dec 2023072871.262.61$1,901
Nov 2023072577.892.81$2,035
Oct 2023084385.443.09$2,603
Sep 2023084389.042.74$2,306
Aug 2023079780.522.67$2,130
Jul 2023088374.852.64$2,333
Jun 2023085368.962.26$1,926
May 2023089570.622.23$1,994
Apr 2023092378.122.24$2,065
Mar 2023091272.852.39$2,183
Feb 2023178175.112.47$2,001
Jan 2023086476.533.39$2,927
Dec 2022072476.415.73$4,148
Nov 2022082285.005.65$4,641
Oct 2022085387.185.86$5,002
Sep 2022083884.888.16$6,841
Aug 2022187294.529.13$8,053
Jul 20220878101.587.54$6,622
Jun 20220824115.097.98$6,573
May 20220950109.378.43$8,011
Apr 20220775104.226.84$5,299
Mar 20220907108.885.08$4,604
Feb 2022079491.054.86$3,858
Jan 2022091881.844.54$4,166
Dec 2021093171.323.90$3,630
Nov 2021089377.435.24$4,677
Oct 2021094479.795.71$5,394
Sep 2021094469.865.35$5,051
Aug 202101,02466.024.22$4,322
Jul 202101,10170.783.98$4,384
Jun 202101,11169.493.38$3,756
May 202101,28063.483.02$3,863
Apr 202101,97160.362.76$5,437
Mar 2021689661.302.72$2,802
Feb 202103757.805.55$205
Jan 202104250.412.81$118
Dec 202003044.642.68$80
Nov 202009838.772.71$265
Oct 202002736.972.48$67
Sep 202005237.091.99$104
Aug 2020073439.982.39$1,751
Jul 2020098438.371.83$1,796
Jun 2020093734.901.69$1,584
May 2020097516.921.81$1,769
Apr 2020094214.751.80$1,700
Mar 2020096630.341.86$1,793
Feb 2020090249.881.98$1,787
Jan 2020098057.252.09$2,053
Dec 2019098459.012.30$2,267
Nov 2019694355.302.75$2,926
Oct 201901,02553.472.42$2,479
Sep 201901,00655.052.66$2,673
Aug 201901,01753.112.30$2,344
Jul 201901,04356.272.46$2,566
Jun 201901,01452.782.49$2,526
May 201901,04458.482.74$2,861
Apr 2019099062.632.75$2,723
Mar 201901,03756.803.06$3,175
Feb 2019093950.852.79$2,622
Jan 201901,03846.033.23$3,351
Dec 201801,03646.594.19$4,336
Nov 201801,01652.934.24$4,305
Oct 201801,10361.443.40$3,748
Sep 201801,05559.543.11$3,279
Aug 201801,08059.403.07$3,312
Jul 201801,11465.142.93$3,266
Jun 2018093360.183.08$2,871
May 201801,12465.382.90$3,261
Apr 201801,09263.842.90$3,168
Mar 201801,19561.222.79$3,330
Feb 2018095361.782.77$2,636
Jan 201801,02662.874.01$4,114
Dec 201701,03557.272.92$3,024
Nov 2017097955.423.12$3,053
Oct 2017096249.292.98$2,870
Sep 2017092047.523.09$2,840
Aug 201711,07245.373.00$3,266
Jul 201701,12843.873.09$3,482
Jun 201701,18342.493.09$3,652
May 201701,24245.373.26$4,053
Apr 201701,25447.933.21$4,027
Mar 201701,07046.772.98$3,193
Feb 201701,16450.452.95$3,437
Jan 201701,18449.413.42$4,048
Dec 201601,23148.763.72$4,583
Nov 201601,22642.492.64$3,242
Oct 201601,28246.193.09$3,962
Sep 2016094941.553.10$2,943
Aug 201601,10041.442.92$3,217
Jul 201601,13941.622.92$3,331
Jun 201601,16145.352.69$3,118
May 201601,17342.521.99$2,335
Apr 201601,18836.561.99$2,365
Mar 2016088633.011.79$1,589
Feb 201601,16826.472.06$2,410
Jan 201601,19827.352.36$2,833
Dec 201501,18332.362.00$2,368
Nov 201501,22338.792.17$2,651
Oct 201501,28843.552.43$3,125
Sep 201501,22142.992.76$3,368
Aug 201501,26640.162.87$3,637
Jul 201551,18548.152.95$3,731
Jun 2015084456.152.88$2,433
May 2015067955.212.96$2,007
Apr 2015064449.822.71$1,743
Mar 2015069642.892.93$2,043
Feb 201501,18144.662.98$3,515
Jan 201501,31543.433.10$4,077
Dec 201421,26354.693.59$4,645
Nov 201401,23170.464.25$5,234
Oct 201401,37078.303.90$5,344
Sep 201401,34786.164.05$5,449
Aug 201401,42589.394.04$5,750
Jul 201401,41996.564.18$5,931
Jun 201401,42098.164.74$6,726
May 201401,34494.734.73$6,353
Apr 201401,37195.944.81$6,593
Mar 201401,44795.895.06$7,317
Feb 201401,30197.406.19$8,056
Jan 201401,23590.404.86$6,003
Dec 201301,21191.824.35$5,273
Nov 201301,40988.853.74$5,267
Oct 201301,37697.423.78$5,200
Sep 201301,214104.113.72$4,513
Aug 201301,466104.253.52$5,164
Jul 201301,514102.523.72$5,629
Jun 201301,50694.403.93$5,924
May 201301,55594.834.15$6,452
Apr 201301,56493.964.28$6,698
Mar 201321,95693.623.91$7,841
Feb 2013040591.233.42$1,385
Jan 201301,52691.603.42$5,219
Dec 201201,50186.773.42$5,134
Nov 201201,44686.953.62$5,242
Oct 201201,36289.383.40$4,630
Sep 201201,33494.672.92$3,893
Aug 201201,55992.662.91$4,534
Jul 201201,60985.133.02$4,860
Jun 201221,52579.822.52$4,001
May 201201,51591.612.49$3,770
Apr 201201,490101.652.00$2,975
Mar 201201,615105.052.22$3,589
Feb 201201,565101.102.57$4,022
Jan 201201,80298.092.73$4,927
Dec 201102,01596.873.24$6,528
Nov 201101,71495.723.31$5,676
Oct 201101,44684.983.65$5,276
Sep 201101,49483.623.99$5,955
Aug 201101,53983.404.15$6,386
Jul 201101,64094.144.52$7,408
Jun 201101,71092.904.64$7,934
May 201101,81298.134.40$7,982
Apr 201101,745105.964.33$7,562
Mar 201101,83296.364.06$7,433
Feb 201101,27085.644.18$5,309
Jan 201101,48586.504.59$6,814
Dec 201001,72285.734.35$7,487
Nov 201002,12880.843.80$8,076
Oct 2010096778.103.51$3,393
Sep 201001,72572.633.98$6,865
Aug 201001,96573.684.42$8,684
Jul 201002,05572.554.74$9,733
Jun 201002,00170.364.91$9,826
May 201002,12571.124.24$9,000
Apr 201032,05081.694.12$8,697
Mar 201002,12178.394.39$9,308
Feb 201001,92173.585.44$10,455
Jan 201002,12474.365.96$12,668
Dec 200902,21671.445.48$12,152
Nov 200902,20274.593.75$8,261
Oct 200902,31372.544.11$9,507
Sep 200902,23265.543.06$6,841
Aug 200902,36767.423.22$7,618
Jul 200902,38061.133.46$8,246
Jun 200902,35566.163.90$9,173
May 200902,40554.743.93$9,441
Apr 200902,39146.773.59$8,578
Mar 200902,50742.144.06$10,176
Feb 200902,28532.814.63$10,586
Jan 200902,52335.865.37$13,551
Dec 200802,60537.105.98$15,570
Nov 200802,60555.496.86$17,871
Oct 200802,75675.246.92$19,077
Sep 200802,745101.767.88$21,623
Aug 200802,887114.228.48$24,490
Jul 200802,954131.0811.39$33,644
Jun 200802,907131.3313.03$37,886
May 200803,032123.1711.57$35,093
Apr 200802,996110.3110.45$31,323
Mar 200803,177101.909.66$30,703
Feb 200802,99792.538.77$26,285
Jan 200803,06390.388.21$25,134
Dec 200703,14788.337.30$22,979
Nov 200703,18991.677.29$23,253
Oct 200703,45682.856.92$23,922
Sep 200703,38875.846.24$21,155
Aug 200743,67469.066.39$23,746
Jul 200703,94070.906.39$25,168
Jun 200703,83362.007.55$28,933
May 200704,10758.747.85$32,225
Apr 200703,92959.617.81$30,667
Mar 200764,33356.927.30$31,981
Feb 200784,05955.108.22$33,790
Jan 200704,20350.306.73$28,273
Dec 200604,54456.656.92$31,437
Nov 200604,59754.207.62$35,018
Oct 200664,63554.906.01$28,203
Sep 200604,67060.085.04$23,524
Aug 200604,93868.717.34$36,245
Jul 200605,23769.376.34$33,217
Jun 200605,34966.286.38$34,147
May 200605,75266.016.42$36,957
Apr 200605,85564.397.36$43,096
Mar 200606,52656.707.08$46,223
Feb 200666,17857.597.75$48,232
Jan 200607,45360.598.93$66,580
Dec 200507,99754.9413.42$107,283
Nov 200508,73854.6910.59$92,521
Oct 2005010,25558.3413.80$141,476
Sep 2005011,75861.4512.08$142,025
Aug 2005014,91561.519.80$146,120
Jul 2005021,28555.697.84$166,952
Jun 2005010,88052.337.38$80,306

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  404 Mcf  × $  3.05 =     $1,231

────────────────────────────────────────────────────
Month total                                   $1,231

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213802 is the state's own key, not one this site invented.