MAYFIELD 32

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213886District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$582 k
Jun 2005 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13165163
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition54 bbl$3,814
GasProduction87,706 Mcf$578,509
Total$582,323

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5498, -100.8238. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54979, -100.82381 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,770 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,770 ft.

Completions filed
Jun 2005
1 of 1 wells

1 well

42-43537373208,770 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 2026073106.413.05$222
Apr 202606598.932.87$187
Mar 202606889.753.15$214
Feb 202606363.503.75$236
Jan 202606259.138.00$496
Dec 202506956.664.41$305
Nov 202506858.593.93$267
Oct 202507259.383.30$238
Sep 202507262.743.08$222
Aug 202507663.933.01$229
Jul 202507366.743.32$242
Jun 202507266.483.13$225
May 202507360.553.23$236
Apr 202507362.363.54$259
Mar 202507667.704.27$324
Feb 202506870.884.34$295
Jan 202507574.324.28$321
Dec 202407668.993.12$237
Nov 202407569.052.20$165
Oct 202407771.372.28$176
Sep 202407569.612.36$177
Aug 202408075.632.06$165
Jul 202408079.932.15$172
Jun 202407878.082.63$205
May 202408078.812.20$176
Apr 202407784.451.66$128
Mar 202407980.301.55$122
Feb 202407776.091.78$137
Jan 202408273.023.30$270
Dec 202308071.262.61$209
Nov 202307877.892.81$219
Oct 202308285.443.09$253
Sep 202308189.042.74$222
Aug 202308580.522.67$227
Jul 202308574.852.64$225
Jun 202308268.962.26$185
May 202308770.622.23$194
Apr 202308478.122.24$188
Mar 202308872.852.39$211
Feb 202308075.112.47$197
Jan 202308976.533.39$302
Dec 202208476.415.73$481
Nov 202208585.005.65$480
Oct 202208787.185.86$510
Sep 202208784.888.16$710
Aug 202209094.529.13$821
Jul 2022090101.587.54$679
Jun 2022089115.097.98$710
May 2022092109.378.43$776
Apr 2022090104.226.84$615
Mar 2022092108.885.08$467
Feb 202208491.054.86$408
Jan 202209381.844.54$422
Dec 202109271.323.90$359
Nov 202109077.435.24$471
Oct 202109079.795.71$514
Sep 202108869.865.35$471
Aug 202108766.024.22$367
Jul 202109570.783.98$378
Jun 20210769.493.38$24
May 20210563.483.02$15
Apr 202106860.362.76$188
Mar 202108661.302.72$234
Feb 202107957.805.55$438
Jan 202107950.412.81$222
Dec 202007744.642.68$206
Nov 202007838.772.71$211
Oct 202008136.972.48$201
Sep 202007937.091.99$157
Aug 202008539.982.39$203
Jul 202008738.371.83$159
Jun 202008534.901.69$144
May 202008716.921.81$158
Apr 202008614.751.80$155
Mar 202009330.341.86$173
Feb 202008549.881.98$168
Jan 202009157.252.09$191
Dec 201909159.012.30$210
Nov 201909155.302.75$250
Oct 2019010453.472.42$252
Sep 2019014555.052.66$385
Aug 2019010453.112.30$240
Jul 2019010756.272.46$263
Jun 2019010452.782.49$259
May 2019010658.482.74$290
Apr 2019010962.632.75$300
Mar 2019011656.803.06$355
Feb 2019010550.852.79$293
Jan 2019011546.033.23$371
Dec 2018011746.594.19$490
Nov 2018011652.934.24$492
Oct 2018011961.443.40$404
Sep 2018011859.543.11$367
Aug 2018012459.403.07$380
Jul 2018012965.142.93$378
Jun 2018012560.183.08$385
May 2018013365.382.90$386
Apr 2018013163.842.90$380
Mar 2018013661.222.79$379
Feb 2018012361.782.77$340
Jan 2018013562.874.01$541
Dec 2017014057.272.92$409
Nov 2017013555.423.12$421
Oct 2017013949.292.98$415
Sep 2017013947.523.09$429
Aug 2017014445.373.00$433
Jul 2017014843.873.09$457
Jun 2017014242.493.09$438
May 2017014945.373.26$486
Apr 2017014647.933.21$469
Mar 2017015246.772.98$454
Feb 2017013950.452.95$410
Jan 2017015549.413.42$530
Dec 2016015448.763.72$573
Nov 2016015242.492.64$402
Oct 2016016046.193.09$494
Sep 2016015841.553.10$490
Aug 2016016041.442.92$468
Jul 2016016441.622.92$480
Jun 2016015745.352.69$422
May 2016014942.521.99$297
Apr 2016014636.561.99$291
Mar 2016015133.011.79$271
Feb 2016014426.472.06$297
Jan 2016015427.352.36$364
Dec 2015015632.362.00$312
Nov 2015015538.792.17$336
Oct 2015016243.552.43$393
Sep 2015015142.992.76$417
Aug 2015015240.162.87$437
Jul 2015015448.152.95$454
Jun 2015015556.152.88$447
May 2015015855.212.96$467
Apr 2015115749.822.71$475
Mar 2015015942.892.93$467
Feb 2015014444.662.98$429
Jan 2015116943.433.10$567
Dec 2014017454.693.59$625
Nov 2014116470.464.25$768
Oct 2014017278.303.90$671
Sep 2014016686.164.05$672
Aug 2014017789.394.04$714
Jul 2014118096.564.18$849
Jun 2014017498.164.74$824
May 2014018494.734.73$870
Apr 2014018495.944.81$885
Mar 2014119795.895.06$1,092
Feb 2014017997.406.19$1,108
Jan 2014019390.404.86$938
Dec 2013119591.824.35$941
Nov 2013019788.853.74$736
Oct 2013120897.423.78$884
Sep 20130202104.113.72$751
Aug 20130211104.253.52$743
Jul 20130203102.523.72$755
Jun 2013020394.403.93$798
May 2013021694.834.15$896
Apr 2013121293.964.28$1,002
Mar 2013022093.623.91$861
Feb 2013020191.233.42$687
Jan 2013122191.603.42$847
Dec 2012022186.773.42$756
Nov 2012021986.953.62$794
Oct 2012122989.383.40$868
Sep 2012022694.672.92$660
Aug 2012019892.662.91$576
Jul 2012019785.133.02$595
Jun 2012019379.822.52$486
May 2012027591.612.49$684
Apr 20120323101.652.00$645
Mar 20121264105.052.22$692
Feb 20121247101.102.57$736
Jan 2012027298.092.73$744
Dec 2011024696.873.24$797
Nov 2011119795.723.31$748
Oct 2011021984.983.65$799
Sep 2011027583.623.99$1,096
Aug 2011027583.404.15$1,141
Jul 2011030594.144.52$1,378
Jun 2011030192.904.64$1,397
May 2011031298.134.40$1,374
Apr 20110364105.964.33$1,577
Mar 201103596.364.06$142
Feb 2011129485.644.18$1,315
Jan 2011040386.504.59$1,849
Dec 2010042285.734.35$1,835
Nov 2010036880.843.80$1,397
Oct 2010141778.103.51$1,541
Sep 2010036472.633.98$1,449
Aug 2010026173.684.42$1,153
Jul 2010124572.554.74$1,233
Jun 2010035170.364.91$1,724
May 2010029971.124.24$1,266
Apr 2010041581.694.12$1,711
Mar 2010143878.394.39$2,001
Feb 2010140573.585.44$2,278
Jan 2010145674.365.96$2,794
Dec 2009145271.445.48$2,550
Nov 2009144074.593.75$1,725
Oct 2009040472.544.11$1,661
Sep 2009047965.543.06$1,468
Aug 2009041267.423.22$1,326
Jul 2009045761.133.46$1,583
Jun 2009037066.163.90$1,441
May 2009046254.743.93$1,814
Apr 2009147746.773.59$1,758
Mar 2009148842.144.06$2,023
Feb 2009142132.814.63$1,983
Jan 2009152535.865.37$2,856
Dec 2008153937.105.98$3,259
Nov 2008152555.496.86$3,657
Oct 2008058275.246.92$4,029
Sep 20080567101.767.88$4,466
Aug 20080597114.228.48$5,064
Jul 20081602131.0811.39$6,988
Jun 20080560131.3313.03$7,298
May 20080595123.1711.57$6,887
Apr 20081620110.3110.45$6,592
Mar 20080625101.909.66$6,040
Feb 2008163992.538.77$5,697
Jan 2008168590.388.21$5,711
Dec 2007169788.337.30$5,178
Nov 2007071691.677.29$5,221
Oct 2007172982.856.92$5,129
Sep 2007072875.846.24$4,546
Aug 2007069569.066.39$4,440
Jul 2007171470.906.39$4,632
Jun 2007076662.007.55$5,782
May 2007183658.747.85$6,618
Apr 2007082059.617.81$6,400
Mar 2007188756.927.30$6,534
Feb 2007180855.108.22$6,694
Jan 2007192750.306.73$6,286
Dec 2006190756.656.92$6,332
Nov 2006198954.207.62$7,588
Oct 200601,09154.906.01$6,561
Sep 200601,10260.085.04$5,551
Aug 200601,15268.717.34$8,456
Jul 200611,20269.376.34$7,693
Jun 200611,15266.286.38$7,421
May 200611,30866.016.42$8,470
Apr 200611,39564.397.36$10,332
Mar 200621,48856.707.08$10,653
Feb 200621,43057.597.75$11,199
Jan 200621,71660.598.93$15,451
Dec 200521,94154.9413.42$26,149
Nov 200522,05754.6910.59$21,890
Oct 200502,35258.3413.80$32,448
Sep 200502,44861.4512.08$29,569
Aug 200503,17361.519.80$31,085
Jul 200504,74255.697.84$37,195
Jun 200504,72152.337.38$34,846

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   73 Mcf  × $  3.05 =       $222

────────────────────────────────────────────────────
Month total                                     $222

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213886 is the state's own key, not one this site invented.