CANYON RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213973District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$797 k
Jul 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
251
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13165309
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2 bbl$163
GasProduction120,914 Mcf$796,857
Total$797,021

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3051, -100.5027. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.30509, -100.50266 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,904 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,904 ft.

Completions filed
Jul 2005
1 of 1 wells

1 well

42-435374629212S6,904 ftJul 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (251)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

251 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240176.091.78$2
Jan 20240073.023.30$0
Dec 20230171.262.61$3
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210666.024.22$25
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210363.483.02$9
Apr 20210660.362.76$17
Mar 202101161.302.72$30
Feb 20210457.805.55$22
Jan 202101150.412.81$31
Dec 20200844.642.68$21
Nov 20200038.772.71$0
Oct 202001136.972.48$27
Sep 202002237.091.99$44
Aug 202002439.982.39$57
Jul 202002438.371.83$44
Jun 202001334.901.69$22
May 20200916.921.81$16
Apr 20200714.751.80$13
Mar 202001130.341.86$20
Feb 202001249.881.98$24
Jan 202002957.252.09$61
Dec 201901159.012.30$25
Nov 201903355.302.75$91
Oct 201901253.472.42$29
Sep 201901755.052.66$45
Aug 201901753.112.30$39
Jul 201901456.272.46$34
Jun 201901652.782.49$40
May 201901458.482.74$38
Apr 201901462.632.75$39
Mar 201901656.803.06$49
Feb 20190850.852.79$22
Jan 201902546.033.23$81
Dec 201802546.594.19$105
Nov 201801352.934.24$55
Oct 201801661.443.40$54
Sep 201801659.543.11$50
Aug 201801459.403.07$43
Jul 201801665.142.93$47
Jun 201802560.183.08$77
May 201801765.382.90$49
Apr 201801463.842.90$41
Mar 201802761.222.79$75
Feb 201801361.782.77$36
Jan 201801662.874.01$64
Dec 201702157.272.92$61
Nov 20170455.423.12$12
Oct 2017027949.292.98$832
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170347.933.21$10
Mar 20170246.772.98$6
Feb 201701050.452.95$30
Jan 20170249.413.42$7
Dec 201604448.763.72$164
Nov 201606542.492.64$172
Oct 20160046.193.09$0
Sep 20160141.553.10$3
Aug 2016012941.442.92$377
Jul 2016042341.622.92$1,237
Jun 2016042645.352.69$1,144
May 2016045642.521.99$908
Apr 2016045136.561.99$898
Mar 2016048433.011.79$868
Feb 2016045526.472.06$939
Jan 2016051827.352.36$1,225
Dec 2015054032.362.00$1,081
Nov 2015054438.792.17$1,179
Oct 2015059443.552.43$1,441
Sep 2015061742.992.76$1,702
Aug 2015077340.162.87$2,220
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 2015041755.212.96$1,232
Apr 20150049.822.71$0
Mar 2015031942.892.93$936
Feb 2015060044.662.98$1,786
Jan 20150143.433.10$3
Dec 2014030054.693.59$1,077
Nov 20140070.464.25$0
Oct 20140278.303.90$8
Sep 20140386.164.05$12
Aug 20140689.394.04$24
Jul 20140996.564.18$38
Jun 2014018598.164.74$876
May 20140294.734.73$9
Apr 201401095.944.81$48
Mar 20140395.895.06$15
Feb 20140397.406.19$19
Jan 2014022790.404.86$1,103
Dec 2013036891.824.35$1,602
Nov 2013047388.853.74$1,768
Oct 2013039097.423.78$1,474
Sep 20130469104.113.72$1,744
Aug 20130596104.253.52$2,099
Jul 20130587102.523.72$2,182
Jun 2013059194.403.93$2,325
May 2013060594.834.15$2,510
Apr 2013062293.964.28$2,664
Mar 2013067693.623.91$2,645
Feb 2013061791.233.42$2,110
Jan 2013061291.603.42$2,093
Dec 2012064586.773.42$2,206
Nov 2012059186.953.62$2,142
Oct 2012065389.383.40$2,220
Sep 2012068794.672.92$2,005
Aug 2012071492.662.91$2,076
Jul 2012071685.133.02$2,163
Jun 2012068079.822.52$1,713
May 2012074791.612.49$1,859
Apr 20120726101.652.00$1,450
Mar 20120679105.052.22$1,509
Feb 20120732101.102.57$1,881
Jan 2012033098.092.73$902
Dec 2011079496.873.24$2,572
Nov 2011077795.723.31$2,573
Oct 2011078084.983.65$2,846
Sep 2011073783.623.99$2,938
Aug 2011078183.404.15$3,241
Jul 2011081194.144.52$3,663
Jun 2011082192.904.64$3,809
May 2011084598.134.40$3,722
Apr 20110726105.964.33$3,146
Mar 2011078196.364.06$3,169
Feb 2011063385.644.18$2,646
Jan 2011076686.504.59$3,515
Dec 2010080685.734.35$3,504
Nov 2010080980.843.80$3,070
Oct 2010062878.103.51$2,204
Sep 2010012172.633.98$482
Aug 2010014473.684.42$636
Jul 201008772.554.74$412
Jun 2010029970.364.91$1,468
May 2010045671.124.24$1,931
Apr 2010275981.694.12$3,293
Mar 2010090478.394.39$3,967
Feb 2010083873.585.44$4,561
Jan 2010093974.365.96$5,600
Dec 2009079271.445.48$4,343
Nov 2009094274.593.75$3,534
Oct 2009096372.544.11$3,958
Sep 2009095065.543.06$2,912
Aug 2009099967.423.22$3,215
Jul 2009096661.133.46$3,347
Jun 2009096166.163.90$3,743
May 200901,16754.743.93$4,581
Apr 2009082046.773.59$2,942
Mar 2009095142.144.06$3,860
Feb 2009088132.814.63$4,082
Jan 2009084035.865.37$4,512
Dec 2008093837.105.98$5,607
Nov 2008095155.496.86$6,524
Oct 2008099175.246.92$6,860
Sep 20080959101.767.88$7,554
Aug 20080906114.228.48$7,686
Jul 200801,163131.0811.39$13,246
Jun 200801,075131.3313.03$14,010
May 20080986123.1711.57$11,412
Apr 200801,001110.3110.45$10,465
Mar 20080926101.909.66$8,949
Feb 200801,21192.538.77$10,621
Jan 2008078090.388.21$6,400
Dec 200701,05288.337.30$7,682
Nov 200701,03091.677.29$7,510
Oct 200701,05382.856.92$7,289
Sep 2007095475.846.24$5,957
Aug 2007042469.066.39$2,708
Jul 200701,15270.906.39$7,359
Jun 200701,11262.007.55$8,394
May 200701,16158.747.85$9,110
Apr 200701,39059.617.81$10,849
Mar 200701,36556.927.30$9,967
Feb 200701,33855.108.22$10,993
Jan 200701,55550.306.73$10,460
Dec 200601,61156.656.92$11,146
Nov 200601,63354.207.62$12,439
Oct 200601,75854.906.01$10,572
Sep 200601,64660.085.04$8,291
Aug 200601,83468.717.34$13,461
Jul 200601,76669.376.34$11,201
Jun 200601,87366.286.38$11,957
May 200602,01166.016.42$12,921
Apr 200602,00564.397.36$14,758
Mar 200602,17156.707.08$15,377
Feb 200602,25957.597.75$17,510
Jan 200602,63960.598.93$23,575
Dec 200502,88154.9413.42$38,650
Nov 200502,83254.6910.59$29,986
Oct 200503,64758.3413.80$50,313
Sep 200504,36061.4512.08$52,664
Aug 200505,88261.519.80$57,625
Jul 200501,29955.697.84$10,189

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 76.09 =         $0
Gas                    1 Mcf  × $  1.78 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213973 is the state's own key, not one this site invented.