HILL-MAYER, EDWIN S. JR, 'LL'

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214473District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$189 k
Sep 2005 – May 2026
Value, last 12 filed months
$3
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-03-21166039
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition25 bbl$1,670
GasProduction27,725 Mcf$187,238
Total$188,908

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6922, -100.8215. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.69218, -100.82152 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,133 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,133 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-4353747458,133 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250166.743.32$3
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240869.612.36$19
Aug 202402875.632.06$58
Jul 202402679.932.15$56
Jun 202402978.082.63$76
May 202403178.812.20$68
Apr 202402484.451.66$40
Mar 202403780.301.55$57
Feb 202401776.091.78$30
Jan 202402673.023.30$86
Dec 202303171.262.61$81
Nov 202302677.892.81$73
Oct 202302585.443.09$77
Sep 202301889.042.74$49
Aug 202303280.522.67$86
Jul 202301474.852.64$37
Jun 20230068.962.26$0
May 202302470.622.23$53
Apr 202302078.122.24$45
Mar 202302472.852.39$57
Feb 202302475.112.47$59
Jan 202312676.533.39$165
Dec 202213176.415.73$254
Nov 202214585.005.65$339
Oct 20220087.185.86$0
Sep 20220484.888.16$33
Aug 202202894.529.13$256
Jul 2022032101.587.54$241
Jun 2022227115.097.98$446
May 2022124109.378.43$312
Apr 2022134104.226.84$337
Mar 2022025108.885.08$127
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20212063.483.02$127
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 202002416.921.81$44
Apr 202002214.751.80$40
Mar 202002230.341.86$41
Feb 202002149.881.98$42
Jan 202002257.252.09$46
Dec 201902459.012.30$55
Nov 201902655.302.75$72
Oct 201912453.472.42$112
Sep 201903155.052.66$82
Aug 201902853.112.30$65
Jul 201912556.272.46$118
Jun 201901952.782.49$47
May 201903858.482.74$104
Apr 20191162.632.75$65
Mar 201921856.803.06$169
Feb 201903250.852.79$89
Jan 201923646.033.23$208
Dec 201821046.594.19$135
Nov 201844752.934.24$411
Oct 201806061.443.40$204
Sep 201832959.543.11$269
Aug 201803159.403.07$95
Jul 201803265.142.93$94
Jun 201803160.183.08$95
May 201803265.382.90$93
Apr 201803063.842.90$87
Mar 201803061.222.79$84
Feb 201802761.782.77$75
Jan 201802962.874.01$116
Dec 201702857.272.92$82
Nov 201703155.423.12$97
Oct 201703249.292.98$95
Sep 201703247.523.09$99
Aug 201703445.373.00$102
Jul 201702843.873.09$86
Jun 201703342.493.09$102
May 201703445.373.26$111
Apr 201703247.933.21$103
Mar 201703446.772.98$101
Feb 201703050.452.95$89
Jan 201702749.413.42$92
Dec 201604048.763.72$149
Nov 201603142.492.64$82
Oct 201603946.193.09$121
Sep 201602441.553.10$74
Aug 201603741.442.92$108
Jul 201603941.622.92$114
Jun 201603845.352.69$102
May 201604142.521.99$82
Apr 201603336.561.99$66
Mar 201604033.011.79$72
Feb 201603926.472.06$80
Jan 201604227.352.36$99
Dec 201504232.362.00$84
Nov 201504138.792.17$89
Oct 201504243.552.43$102
Sep 201504242.992.76$116
Aug 201504640.162.87$132
Jul 201504548.152.95$133
Jun 201504456.152.88$127
May 201504855.212.96$142
Apr 201504549.822.71$122
Mar 201505142.892.93$150
Feb 201505744.662.98$170
Jan 201501543.433.10$47
Dec 201405954.693.59$212
Nov 201404870.464.25$204
Oct 2014010178.303.90$394
Sep 201401786.164.05$69
Aug 201403889.394.04$153
Jul 201406396.564.18$263
Jun 201407598.164.74$355
May 20140094.734.73$0
Apr 201401495.944.81$67
Mar 201406295.895.06$314
Feb 201404097.406.19$248
Jan 201403890.404.86$185
Dec 20130091.824.35$0
Nov 201304888.853.74$179
Oct 201308797.423.78$329
Sep 2013046104.113.72$171
Aug 2013033104.253.52$116
Jul 2013033102.523.72$123
Jun 201304694.403.93$181
May 201302094.834.15$83
Apr 201304493.964.28$188
Mar 201308293.623.91$321
Feb 201304191.233.42$140
Jan 201303191.603.42$106
Dec 201203586.773.42$120
Nov 201202486.953.62$87
Oct 201202889.383.40$95
Sep 2012010694.672.92$309
Aug 2012017192.662.91$497
Jul 201207385.133.02$221
Jun 201206779.822.52$169
May 2012010991.612.49$271
Apr 2012086101.652.00$172
Mar 20120169105.052.22$376
Feb 2012033101.102.57$85
Jan 201206998.092.73$189
Dec 201105996.873.24$191
Nov 201102795.723.31$89
Oct 201105784.983.65$208
Sep 201103783.623.99$147
Aug 2011012483.404.15$515
Jul 201106294.144.52$280
Jun 201108292.904.64$380
May 201109098.134.40$396
Apr 20110106105.964.33$459
Mar 201102596.364.06$101
Feb 2011011185.644.18$464
Jan 2011011386.504.59$519
Dec 201005785.734.35$248
Nov 201004680.843.80$175
Oct 201007278.103.51$253
Sep 2010014572.633.98$577
Aug 2010015173.684.42$667
Jul 2010015772.554.74$744
Jun 2010015770.364.91$771
May 2010017271.124.24$728
Apr 2010017381.694.12$713
Mar 2010018178.394.39$794
Feb 2010016973.585.44$920
Jan 2010018974.365.96$1,127
Dec 2009020371.445.48$1,113
Nov 2009021074.593.75$788
Oct 2009021972.544.11$900
Sep 2009021665.543.06$662
Aug 2009022467.423.22$721
Jul 2009024361.133.46$842
Jun 2009024466.163.90$950
May 2009026454.743.93$1,036
Apr 2009025946.773.59$929
Mar 2009027642.144.06$1,120
Feb 2009025832.814.63$1,195
Jan 2009029035.865.37$1,558
Dec 2008026637.105.98$1,590
Nov 2008027255.496.86$1,866
Oct 2008029775.246.92$2,056
Sep 20080298101.767.88$2,347
Aug 20080204114.228.48$1,731
Jul 20080239131.0811.39$2,722
Jun 20080277131.3313.03$3,610
May 20080335123.1711.57$3,877
Apr 20080375110.3110.45$3,921
Mar 20080391101.909.66$3,779
Feb 2008034292.538.77$3,000
Jan 2008038590.388.21$3,159
Dec 2007042688.337.30$3,111
Nov 2007046791.677.29$3,405
Oct 2007054382.856.92$3,759
Sep 2007057775.846.24$3,603
Aug 2007073169.066.39$4,670
Jul 2007095270.906.39$6,081
Jun 200701,06062.007.55$8,001
May 2007052858.747.85$4,143
Apr 2007050459.617.81$3,934
Mar 2007071156.927.30$5,192
Feb 2007012355.108.22$1,011
Jan 2007022850.306.73$1,534
Dec 2006027956.656.92$1,930
Nov 2006018854.207.62$1,432
Oct 2006022054.906.01$1,323
Sep 2006030560.085.04$1,536
Aug 2006031368.717.34$2,297
Jul 2006015569.376.34$983
Jun 2006027366.286.38$1,743
May 2006027766.016.42$1,780
Apr 2006023264.397.36$1,708
Mar 2006030156.707.08$2,132
Feb 2006032757.597.75$2,535
Jan 2006064960.598.93$5,798
Dec 2005014754.9413.42$1,972
Nov 2005032254.6910.59$3,409
Oct 2005071358.3413.80$9,836
Sep 200502,11161.4512.08$25,499

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 66.74 =         $0
Gas                    1 Mcf  × $  3.32 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/214473 is the state's own key, not one this site invented.