VALLIANT, L. R.

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215871District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Sep 2005 – May 2026
Value, last 12 filed months
$19 k
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31166085
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16 bbl$909
GasProduction166,604 Mcf$1,061,056
Total$1,061,965

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5090, -100.8596. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50902, -100.85958 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,810 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,810 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-43537517287,810 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 20260344106.413.05$1,048
Apr 2026033198.932.87$950
Mar 2026034889.753.15$1,096
Feb 2026031763.503.75$1,189
Jan 2026052659.138.00$4,207
Dec 2025036256.664.41$1,598
Nov 2025037058.593.93$1,453
Oct 2025040059.383.30$1,322
Sep 2025040362.743.08$1,240
Aug 2025044963.933.01$1,354
Jul 2025048266.743.32$1,598
Jun 2025050166.483.13$1,567
May 2025063160.553.23$2,040
Apr 2025089462.363.54$3,168
Mar 2025024167.704.27$1,029
Feb 2025020470.884.34$886
Jan 2025020174.324.28$860
Dec 2024021068.993.12$655
Nov 2024022569.052.20$495
Oct 2024018471.372.28$420
Sep 2024018669.612.36$440
Aug 2024020475.632.06$421
Jul 2024021679.932.15$464
Jun 2024025078.082.63$659
May 2024021978.812.20$481
Apr 2024020084.451.66$332
Mar 2024019080.301.55$294
Feb 2024018276.091.78$325
Jan 2024018973.023.30$623
Dec 2023019271.262.61$501
Nov 2023019777.892.81$553
Oct 2023021085.443.09$648
Sep 2023019889.042.74$542
Aug 2023020180.522.67$537
Jul 2023020074.852.64$528
Jun 2023019868.962.26$447
May 2023019770.622.23$439
Apr 2023018878.122.24$421
Mar 2023019572.852.39$467
Feb 2023017375.112.47$427
Jan 2023019576.533.39$661
Dec 2022019576.415.73$1,117
Nov 2022019185.005.65$1,078
Oct 2022019987.185.86$1,167
Sep 2022019984.888.16$1,625
Aug 2022021794.529.13$1,981
Jul 20220218101.587.54$1,644
Jun 20220211115.097.98$1,683
May 20220220109.378.43$1,855
Apr 20220194104.226.84$1,326
Mar 20220205108.885.08$1,041
Feb 2022018091.054.86$875
Jan 2022019481.844.54$880
Dec 2021020571.323.90$799
Nov 2021022277.435.24$1,163
Oct 2021025879.795.71$1,474
Sep 2021020869.865.35$1,113
Aug 2021021266.024.22$895
Jul 2021021070.783.98$836
Jun 2021020569.493.38$693
May 2021021963.483.02$661
Apr 2021020860.362.76$574
Mar 2021022761.302.72$617
Feb 2021020257.805.55$1,121
Jan 2021022950.412.81$644
Dec 2020029844.642.68$797
Nov 2020025838.772.71$698
Oct 2020022536.972.48$558
Sep 2020021937.091.99$436
Aug 2020024239.982.39$577
Jul 2020023638.371.83$431
Jun 2020023134.901.69$390
May 2020024016.921.81$436
Apr 2020023314.751.80$420
Mar 2020024330.341.86$451
Feb 2020021949.881.98$434
Jan 2020024057.252.09$503
Dec 2019024359.012.30$560
Nov 2019024355.302.75$668
Oct 2019027053.472.42$653
Sep 2019029255.052.66$776
Aug 2019026053.112.30$599
Jul 2019025456.272.46$625
Jun 2019024052.782.49$598
May 2019025058.482.74$685
Apr 2019024562.632.75$674
Mar 2019024856.803.06$759
Feb 2019022450.852.79$625
Jan 2019029246.033.23$943
Dec 2018023646.594.19$988
Nov 2018027052.934.24$1,144
Oct 2018030261.443.40$1,026
Sep 2018028659.543.11$889
Aug 2018031559.403.07$966
Jul 2018032665.142.93$956
Jun 2018026660.183.08$818
May 2018027765.382.90$804
Apr 2018026463.842.90$766
Mar 2018028061.222.79$780
Feb 2018023961.782.77$661
Jan 2018027462.874.01$1,099
Dec 2017028357.272.92$827
Nov 2017027755.423.12$864
Oct 2017031549.292.98$940
Sep 2017029247.523.09$901
Aug 2017031045.373.00$931
Jul 2017031143.873.09$960
Jun 2017031942.493.09$985
May 2017031945.373.26$1,041
Apr 2017032447.933.21$1,041
Mar 2017033146.772.98$988
Feb 2017030050.452.95$886
Jan 2017032949.413.42$1,125
Dec 2016034848.763.72$1,296
Nov 2016032142.492.64$849
Oct 2016033846.193.09$1,045
Sep 2016032441.553.10$1,005
Aug 2016034441.442.92$1,006
Jul 2016035441.622.92$1,035
Jun 2016035445.352.69$951
May 2016037042.521.99$737
Apr 2016036236.561.99$721
Mar 2016038233.011.79$685
Feb 2016035926.472.06$741
Jan 2016035127.352.36$830
Dec 2015034732.362.00$694
Nov 2015036938.792.17$800
Oct 2015037743.552.43$915
Sep 2015035942.992.76$990
Aug 2015038640.162.87$1,109
Jul 2015240648.152.95$1,292
Jun 2015061456.152.88$1,770
May 2015072255.212.96$2,134
Apr 2015055749.822.71$1,508
Mar 2015038942.892.93$1,142
Feb 2015036544.662.98$1,086
Jan 2015039943.433.10$1,237
Dec 2014039554.693.59$1,419
Nov 2014038570.464.25$1,637
Oct 2014041278.303.90$1,607
Sep 2014037986.164.05$1,533
Aug 2014037189.394.04$1,497
Jul 2014037996.564.18$1,584
Jun 2014038998.164.74$1,843
May 2014040694.734.73$1,919
Apr 2014041095.944.81$1,972
Mar 2014042095.895.06$2,124
Feb 2014037797.406.19$2,334
Jan 2014042390.404.86$2,056
Dec 2013042591.824.35$1,851
Nov 2013041188.853.74$1,536
Oct 2013041297.423.78$1,557
Sep 20130393104.113.72$1,461
Aug 20130452104.253.52$1,592
Jul 20130454102.523.72$1,688
Jun 2013045094.403.93$1,770
May 2013047694.834.15$1,975
Apr 2013048193.964.28$2,060
Mar 2013049793.623.91$1,945
Feb 2013042391.233.42$1,447
Jan 2013047891.603.42$1,635
Dec 2012046886.773.42$1,601
Nov 2012047786.953.62$1,729
Oct 2012050889.383.40$1,727
Sep 2012049594.672.92$1,445
Aug 2012051792.662.91$1,504
Jul 2012053685.133.02$1,619
Jun 2012052279.822.52$1,315
May 2012055191.612.49$1,371
Apr 20120522101.652.00$1,042
Mar 20120550105.052.22$1,222
Feb 20120510101.102.57$1,311
Jan 2012055298.092.73$1,509
Dec 2011057296.873.24$1,853
Nov 2011057795.723.31$1,911
Oct 2011050284.983.65$1,832
Sep 2011038783.623.99$1,543
Aug 2011045383.404.15$1,880
Jul 2011051594.144.52$2,326
Jun 2011050692.904.64$2,348
May 2011052298.134.40$2,299
Apr 20110484105.964.33$2,097
Mar 2011049596.364.06$2,008
Feb 2011042485.644.18$1,772
Jan 2011051286.504.59$2,349
Dec 2010051585.734.35$2,239
Nov 2010063780.843.80$2,418
Oct 2010064678.103.51$2,267
Sep 2010061772.633.98$2,455
Aug 2010068173.684.42$3,010
Jul 2010072472.554.74$3,429
Jun 2010074770.364.91$3,668
May 2010078171.124.24$3,308
Apr 2010066281.694.12$2,729
Mar 2010068878.394.39$3,019
Feb 2010015973.585.44$865
Jan 2010025774.365.96$1,533
Dec 2009067271.445.48$3,685
Nov 2009078674.593.75$2,949
Oct 2009085572.544.11$3,514
Sep 2009084365.543.06$2,584
Aug 2009089667.423.22$2,884
Jul 2009090761.133.46$3,142
Jun 2009089066.163.90$3,467
May 2009094354.743.93$3,702
Apr 2009089446.773.59$3,207
Mar 2009091142.144.06$3,698
Feb 2009083632.814.63$3,873
Jan 2009090435.865.37$4,855
Dec 2008096737.105.98$5,780
Nov 2008096855.496.86$6,641
Oct 200801,04375.246.92$7,220
Sep 200801,039101.767.88$8,184
Aug 200801,111114.228.48$9,425
Jul 200801,147131.0811.39$13,064
Jun 200801,126131.3313.03$14,675
May 200801,179123.1711.57$13,646
Apr 200801,168110.3110.45$12,211
Mar 200801,236101.909.66$11,945
Feb 200801,15892.538.77$10,156
Jan 200801,15890.388.21$9,502
Dec 200701,16788.337.30$8,521
Nov 200701,17291.677.29$8,546
Oct 200701,28982.856.92$8,922
Sep 200701,27075.846.24$7,930
Aug 200721,37169.066.39$8,896
Jul 200701,48070.906.39$9,454
Jun 200701,44762.007.55$10,923
May 200701,65758.747.85$13,001
Apr 200701,50859.617.81$11,770
Mar 200721,74356.927.30$12,841
Feb 200731,61755.108.22$13,451
Jan 200701,80550.306.73$12,142
Dec 200601,93556.656.92$13,387
Nov 200601,95454.207.62$14,885
Oct 200632,09554.906.01$12,764
Sep 200602,17060.085.04$10,931
Aug 200602,32368.717.34$17,051
Jul 200602,53669.376.34$16,085
Jun 200602,62066.286.38$16,726
May 200602,93166.016.42$18,832
Apr 200603,10764.397.36$22,869
Mar 200603,58456.707.08$25,385
Feb 200643,60157.597.75$28,142
Jan 200604,58260.598.93$40,932
Dec 200505,20254.9413.42$69,787
Nov 200505,83054.6910.59$61,730
Oct 200506,74758.3413.80$93,080
Sep 200505,53761.4512.08$66,881

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  344 Mcf  × $  3.05 =     $1,048

────────────────────────────────────────────────────
Month total                                   $1,048

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well