WILSON, DUKE

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215876District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$195 k
Sep 2005 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31166078
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition25 bbl$1,111
GasProduction30,042 Mcf$193,423
Total$194,534

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3649, -100.7829. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.36489, -100.78292 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,950 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-4353733518358,950 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 2026044106.413.05$134
Apr 202604698.932.87$132
Mar 202606289.753.15$195
Feb 202602363.503.75$86
Jan 202602359.138.00$184
Dec 202504456.664.41$194
Nov 202504358.593.93$169
Oct 202504459.383.30$145
Sep 202504362.743.08$132
Aug 202504463.933.01$133
Jul 202504466.743.32$146
Jun 202504366.483.13$135
May 202504660.553.23$149
Apr 202504362.363.54$152
Mar 202504467.704.27$188
Feb 202503970.884.34$169
Jan 202504474.324.28$188
Dec 202404268.993.12$131
Nov 202404069.052.20$88
Oct 202404271.372.28$96
Sep 202404169.612.36$97
Aug 202404375.632.06$89
Jul 202404379.932.15$92
Jun 202404278.082.63$111
May 202404478.812.20$97
Apr 202404384.451.66$71
Mar 202404480.301.55$68
Feb 202404176.091.78$73
Jan 202404373.023.30$142
Dec 202304471.262.61$115
Nov 202304477.892.81$124
Oct 202304485.443.09$136
Sep 202304589.042.74$123
Aug 202304680.522.67$123
Jul 202304774.852.64$124
Jun 202304668.962.26$104
May 202304770.622.23$105
Apr 202304678.122.24$103
Mar 202304872.852.39$115
Feb 202304275.112.47$104
Jan 202304576.533.39$152
Dec 202204776.415.73$269
Nov 202204585.005.65$254
Oct 202204887.185.86$281
Sep 202204784.888.16$384
Aug 202204994.529.13$447
Jul 2022047101.587.54$354
Jun 2022046115.097.98$367
May 2022048109.378.43$405
Apr 2022047104.226.84$321
Mar 2022050108.885.08$254
Feb 202204391.054.86$209
Jan 202204881.844.54$218
Dec 202104771.323.90$183
Nov 202104777.435.24$246
Oct 202104979.795.71$280
Sep 202104869.865.35$257
Aug 202105066.024.22$211
Jul 202104970.783.98$195
Jun 202105069.493.38$169
May 202105063.483.02$151
Apr 202104860.362.76$132
Mar 202105261.302.72$141
Feb 202104357.805.55$239
Jan 202104950.412.81$138
Dec 202004944.642.68$131
Nov 202004738.772.71$127
Oct 202004936.972.48$121
Sep 202004837.091.99$96
Aug 202005039.982.39$119
Jul 202005038.371.83$91
Jun 202004834.901.69$81
May 202005016.921.81$91
Apr 202004814.751.80$87
Mar 202004930.341.86$91
Feb 202004649.881.98$91
Jan 202004957.252.09$103
Dec 201904959.012.30$113
Nov 201904855.302.75$132
Oct 201904853.472.42$116
Sep 201904855.052.66$128
Aug 201905253.112.30$120
Jul 201905356.272.46$130
Jun 201904852.782.49$120
May 201905058.482.74$137
Apr 201904762.632.75$129
Mar 201904956.803.06$150
Feb 201904550.852.79$126
Jan 201904946.033.23$158
Dec 201804846.594.19$201
Nov 201804752.934.24$199
Oct 201804761.443.40$160
Sep 201804659.543.11$143
Aug 201804759.403.07$144
Jul 201804765.142.93$138
Jun 201804560.183.08$138
May 201804665.382.90$133
Apr 201804363.842.90$125
Mar 201804461.222.79$123
Feb 201803861.782.77$105
Jan 201804062.874.01$160
Dec 201705357.272.92$155
Nov 201711355.423.12$96
Oct 201713149.292.98$142
Sep 201712847.523.09$134
Aug 201722045.373.00$151
Jul 201701143.873.09$34
Jun 20171042.493.09$42
May 20171145.373.26$49
Apr 20170147.933.21$3
Mar 20172146.772.98$97
Feb 201723050.452.95$189
Jan 201715649.413.42$241
Dec 201615848.763.72$265
Nov 201615742.492.64$193
Oct 201615746.193.09$222
Sep 201605641.553.10$174
Aug 201615941.442.92$214
Jul 201606041.622.92$175
Jun 201616245.352.69$212
May 201605642.521.99$112
Apr 201605136.561.99$102
Mar 201626033.011.79$174
Feb 201605526.472.06$114
Jan 201606127.352.36$144
Dec 201516232.362.00$156
Nov 201515938.792.17$167
Oct 201516243.552.43$194
Sep 201516042.992.76$209
Aug 201516240.162.87$218
Jul 201516348.152.95$234
Jun 201506156.152.88$176
May 201506355.212.96$186
Apr 201506249.822.71$168
Mar 201506242.892.93$182
Feb 201505644.662.98$167
Jan 201506243.433.10$192
Dec 201406254.693.59$223
Nov 201406270.464.25$264
Oct 201406478.303.90$250
Sep 201406386.164.05$255
Aug 201406589.394.04$262
Jul 201406696.564.18$276
Jun 201406498.164.74$303
May 201406694.734.73$312
Apr 201406495.944.81$308
Mar 201406595.895.06$329
Feb 201405997.406.19$365
Jan 201406590.404.86$316
Dec 201306691.824.35$287
Nov 201306588.853.74$243
Oct 201307097.423.78$265
Sep 2013065104.113.72$242
Aug 2013069104.253.52$243
Jul 2013069102.523.72$257
Jun 201306794.403.93$264
May 201306994.834.15$286
Apr 201306893.964.28$291
Mar 201307093.623.91$274
Feb 201306391.233.42$215
Jan 201307091.603.42$239
Dec 201207286.773.42$246
Nov 201207086.953.62$254
Oct 201207489.383.40$252
Sep 201207294.672.92$210
Aug 201207292.662.91$209
Jul 201207385.133.02$221
Jun 201207279.822.52$181
May 201207491.612.49$184
Apr 2012071101.652.00$142
Mar 2012073105.052.22$162
Feb 2012070101.102.57$180
Jan 201207698.092.73$208
Dec 201107696.873.24$246
Nov 201107595.723.31$248
Oct 201107984.983.65$288
Sep 201107683.623.99$303
Aug 201108283.404.15$340
Jul 201108594.144.52$384
Jun 201108892.904.64$408
May 2011010398.134.40$454
Apr 20110196105.964.33$849
Mar 201101196.364.06$45
Feb 20110185.644.18$4
Jan 20110786.504.59$32
Dec 201003685.734.35$157
Nov 201002780.843.80$102
Oct 20100678.103.51$21
Sep 201004272.633.98$167
Aug 201005873.684.42$256
Jul 201008372.554.74$393
Jun 201006270.364.91$304
May 201005871.124.24$246
Apr 201005881.694.12$239
Mar 201006878.394.39$298
Feb 201006873.585.44$370
Jan 201007774.365.96$459
Dec 200907971.445.48$433
Nov 200907274.593.75$270
Oct 200906972.544.11$284
Sep 200906865.543.06$208
Aug 200907967.423.22$254
Jul 2009010461.133.46$360
Jun 2009011266.163.90$436
May 2009010754.743.93$420
Apr 200906546.773.59$233
Mar 200908642.144.06$349
Feb 200909932.814.63$459
Jan 2009010535.865.37$564
Dec 2008011037.105.98$657
Nov 2008012655.496.86$864
Oct 2008011775.246.92$810
Sep 20080116101.767.88$914
Aug 20080110114.228.48$933
Jul 20080117131.0811.39$1,333
Jun 20080112131.3313.03$1,460
May 20080115123.1711.57$1,331
Apr 20080118110.3110.45$1,234
Mar 20080121101.909.66$1,169
Feb 2008011392.538.77$991
Jan 2008015590.388.21$1,272
Dec 2007013088.337.30$949
Nov 200709891.677.29$715
Oct 2007014182.856.92$976
Sep 2007017275.846.24$1,074
Aug 2007022069.066.39$1,405
Jul 2007024670.906.39$1,571
Jun 2007019062.007.55$1,434
May 2007040258.747.85$3,154
Apr 2007040659.617.81$3,169
Mar 2007047856.927.30$3,490
Feb 2007044755.108.22$3,673
Jan 2007076550.306.73$5,146
Dec 2006065456.656.92$4,525
Nov 2006073154.207.62$5,568
Oct 2006092354.906.01$5,551
Sep 2006080760.085.04$4,065
Aug 2006096868.717.34$7,105
Jul 200601,06669.376.34$6,761
Jun 200601,01066.286.38$6,448
May 2006077466.016.42$4,973
Apr 2006080564.397.36$5,925
Mar 2006087656.707.08$6,205
Feb 2006077857.597.75$6,030
Jan 2006087260.598.93$7,790
Dec 2005086854.9413.42$11,645
Nov 2005093254.6910.59$9,868
Oct 200501,29858.3413.80$17,907
Sep 2005024761.4512.08$2,984

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   44 Mcf  × $  3.05 =       $134

────────────────────────────────────────────────────
Month total                                     $134

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well