SHURLEY RR 1F

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215925District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Oct 2005 – May 2026
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31166958
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition277 bbl$17,019
GasProduction166,757 Mcf$1,000,279
Total$1,017,298

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4338, -100.7457. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.43384, -100.74571 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,259 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,259 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-4353757157,259 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 2026021106.413.05$64
Apr 202601598.932.87$43
Mar 202611389.753.15$131
Feb 202651263.503.75$363
Jan 2026074959.138.00$5,990
Dec 2025797556.664.41$4,700
Nov 2025244658.593.93$1,868
Oct 2025059959.383.30$1,980
Sep 2025025962.743.08$797
Aug 202505163.933.01$154
Jul 20250066.743.32$0
Jun 20250166.483.13$3
May 202501860.553.23$58
Apr 202502262.363.54$78
Mar 202502467.704.27$102
Feb 202502670.884.34$113
Jan 202503074.324.28$128
Dec 202402868.993.12$87
Nov 202402869.052.20$62
Oct 202402971.372.28$66
Sep 202402869.612.36$66
Aug 202402775.632.06$56
Jul 202402379.932.15$49
Jun 202402178.082.63$55
May 202402878.812.20$62
Apr 202403284.451.66$53
Mar 202403580.301.55$54
Feb 202403476.091.78$61
Jan 202403873.023.30$125
Dec 202303971.262.61$102
Nov 202303877.892.81$107
Oct 202304185.443.09$127
Sep 202303889.042.74$104
Aug 202303780.522.67$99
Jul 202303774.852.64$98
Jun 202303868.962.26$86
May 202303670.622.23$80
Apr 202304478.122.24$98
Mar 202304872.852.39$115
Feb 202304175.112.47$101
Jan 202304676.533.39$156
Dec 202205176.415.73$292
Nov 202205385.005.65$299
Oct 202205387.185.86$311
Sep 202205384.888.16$433
Aug 202204994.529.13$447
Jul 2022058101.587.54$437
Jun 2022054115.097.98$431
May 2022060109.378.43$506
Apr 2022063104.226.84$431
Mar 2022068108.885.08$345
Feb 202206191.054.86$296
Jan 202207981.844.54$358
Dec 202107571.323.90$292
Nov 202107777.435.24$403
Oct 202108579.795.71$486
Sep 2021012969.865.35$690
Aug 2021012066.024.22$506
Jul 2021010570.783.98$418
Jun 2021012569.493.38$423
May 2021012163.483.02$365
Apr 2021013260.362.76$364
Mar 2021015261.302.72$413
Feb 2021013157.805.55$727
Jan 2021017750.412.81$497
Dec 2020019044.642.68$508
Nov 2020019738.772.71$533
Oct 202003336.972.48$82
Sep 20200237.091.99$4
Aug 202001639.982.39$38
Jul 202001538.371.83$27
Jun 202002234.901.69$37
May 2020013716.921.81$249
Apr 202001814.751.80$32
Mar 202001630.341.86$30
Feb 202001449.881.98$28
Jan 202001257.252.09$25
Dec 201902259.012.30$51
Nov 201904555.302.75$124
Oct 2019023153.472.42$559
Sep 2019028655.052.66$760
Aug 2019027153.112.30$624
Jul 2019014956.272.46$367
Jun 2019040152.782.49$999
May 2019043458.482.74$1,189
Apr 2019033062.632.75$908
Mar 2019043556.803.06$1,332
Feb 2019038050.852.79$1,061
Jan 2019043746.033.23$1,411
Dec 2018044446.594.19$1,858
Nov 2018041252.934.24$1,746
Oct 2018043961.443.40$1,492
Sep 2018041859.543.11$1,299
Aug 2018044559.403.07$1,365
Jul 2018043165.142.93$1,264
Jun 2018046660.183.08$1,434
May 2018034265.382.90$992
Apr 2018033663.842.90$975
Mar 2018038061.222.79$1,059
Feb 2018141461.782.77$1,207
Jan 2018243562.874.01$1,870
Dec 2017245157.272.92$1,432
Nov 2017044255.423.12$1,378
Oct 2017347149.292.98$1,553
Sep 2017148247.523.09$1,536
Aug 2017036745.373.00$1,103
Jul 2017141143.873.09$1,313
Jun 2017136142.493.09$1,157
May 2017141045.373.26$1,383
Apr 2017145147.933.21$1,496
Mar 2017345346.772.98$1,492
Feb 2017140850.452.95$1,255
Jan 2017047049.413.42$1,607
Dec 2016344948.763.72$1,818
Nov 2016144242.492.64$1,211
Oct 2016343946.193.09$1,495
Sep 2016153441.553.10$1,697
Aug 2016146241.442.92$1,392
Jul 2016153541.622.92$1,606
Jun 2016039845.352.69$1,069
May 2016242242.521.99$925
Apr 2016139436.561.99$821
Mar 2016141133.011.79$770
Feb 2016140326.472.06$858
Jan 2016347427.352.36$1,203
Dec 2015146132.362.00$955
Nov 2015343638.792.17$1,061
Oct 2015145943.552.43$1,157
Sep 2015143842.992.76$1,251
Aug 2015147040.162.87$1,390
Jul 2015148048.152.95$1,462
Jun 2015046356.152.88$1,335
May 2015046555.212.96$1,374
Apr 2015048049.822.71$1,299
Mar 2015048542.892.93$1,423
Feb 2015048944.662.98$1,455
Jan 2015053143.433.10$1,646
Dec 2014055254.693.59$1,982
Nov 2014051370.464.25$2,181
Oct 2014054178.303.90$2,110
Sep 2014053586.164.05$2,164
Aug 2014055489.394.04$2,235
Jul 2014056196.564.18$2,345
Jun 2014055398.164.74$2,619
May 2014056894.734.73$2,685
Apr 2014056895.944.81$2,732
Mar 2014059595.895.06$3,009
Feb 2014054997.406.19$3,399
Jan 2014061890.404.86$3,004
Dec 2013059991.824.35$2,608
Nov 2013054488.853.74$2,034
Oct 2013060597.423.78$2,287
Sep 20130567104.113.72$2,108
Aug 20130620104.253.52$2,184
Jul 20130622102.523.72$2,312
Jun 2013060794.403.93$2,388
May 2013063094.834.15$2,614
Apr 2013062593.964.28$2,677
Mar 2013064793.623.91$2,532
Feb 2013058391.233.42$1,994
Jan 2013064091.603.42$2,189
Dec 2012066386.773.42$2,268
Nov 2012065386.953.62$2,367
Oct 2012067689.383.40$2,298
Sep 2012067594.672.92$1,970
Aug 2012070592.662.91$2,050
Jul 2012070785.133.02$2,136
Jun 2012069579.822.52$1,751
May 2012066491.612.49$1,652
Apr 20120489101.652.00$976
Mar 20120669105.052.22$1,487
Feb 20120680101.102.57$1,748
Jan 2012074698.092.73$2,040
Dec 2011074896.873.24$2,423
Nov 2011073095.723.31$2,417
Oct 2011076384.983.65$2,784
Sep 2011073983.623.99$2,946
Aug 2011077383.404.15$3,207
Jul 2011082794.144.52$3,736
Jun 2011075192.904.64$3,485
May 2011077598.134.40$3,414
Apr 20110795105.964.33$3,445
Mar 2011082496.364.06$3,343
Feb 2011086085.644.18$3,595
Jan 2011087386.504.59$4,006
Dec 2010084885.734.35$3,687
Nov 2010081980.843.80$3,108
Oct 2010085878.103.51$3,011
Sep 2010084472.633.98$3,359
Aug 2010085473.684.42$3,774
Jul 2010085672.554.74$4,054
Jun 2010088970.364.91$4,365
May 2010087671.124.24$3,710
Apr 2010086181.694.12$3,550
Mar 2010092178.394.39$4,042
Feb 2010086373.585.44$4,697
Jan 2010091174.365.96$5,433
Dec 2009098271.445.48$5,385
Nov 2009095574.593.75$3,583
Oct 2009094272.544.11$3,872
Sep 200901,00565.543.06$3,080
Aug 200911,05267.423.22$3,453
Jul 200911,06361.133.46$3,744
Jun 200921,05366.163.90$4,234
May 200921,09154.743.93$4,392
Apr 200931,06546.773.59$3,961
Mar 200951,08242.144.06$4,603
Feb 200941,02232.814.63$4,866
Jan 200931,13635.865.37$6,209
Dec 200841,17637.105.98$7,178
Nov 200831,12155.496.86$7,857
Oct 2008395975.246.92$6,864
Sep 200841,190101.767.88$9,781
Aug 200811,265114.228.48$10,845
Jul 200821,171131.0811.39$13,599
Jun 200811,019131.3313.03$13,412
May 20082804123.1711.57$9,552
Apr 20083875110.3110.45$9,479
Mar 20084906101.909.66$9,163
Feb 2008596692.538.77$8,935
Jan 200851,42290.388.21$12,120
Dec 200741,41288.337.30$10,664
Nov 2007581691.677.29$6,408
Oct 200721,31782.856.92$9,282
Sep 200721,04275.846.24$6,658
Aug 200731,52269.066.39$9,930
Jul 200761,94070.906.39$12,818
Jun 200731,67362.007.55$12,815
May 200761,91358.747.85$15,362
Apr 200761,66159.617.81$13,322
Mar 200772,01156.927.30$15,083
Feb 200751,96255.108.22$16,395
Jan 200772,22950.306.73$15,346
Dec 200682,50156.656.92$17,756
Nov 200661,89354.207.62$14,745
Oct 200662,36154.906.01$14,528
Sep 200662,35560.085.04$12,223
Aug 200632,46268.717.34$18,277
Jul 200652,61269.376.34$16,914
Jun 200632,53066.286.38$16,350
May 200672,62466.016.42$17,321
Apr 200653,05064.397.36$22,771
Mar 2006113,40656.707.08$24,748
Feb 200683,20357.597.75$25,288
Jan 200694,17960.598.93$37,878
Dec 200584,71854.9413.42$63,733
Nov 2005135,77554.6910.59$61,859
Oct 200574,91458.3413.80$68,201

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   21 Mcf  × $  3.05 =        $64

────────────────────────────────────────────────────
Month total                                      $64

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215925 is the state's own key, not one this site invented.