SAWYER-JONES

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215976District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$824 k
Oct 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31166423
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6 bbl$397
GasProduction144,920 Mcf$823,454
Total$823,851

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4647, -100.7870. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46475, -100.78695 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,306 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,306 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-4353757320038,306 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 202602106.413.05$6
Apr 202605498.932.87$155
Mar 2026012989.753.15$406
Feb 2026012763.503.75$476
Jan 2026014059.138.00$1,120
Dec 2025013656.664.41$600
Nov 2025012458.593.93$487
Oct 2025013659.383.30$449
Sep 2025013662.743.08$418
Aug 2025013963.933.01$419
Jul 2025014766.743.32$487
Jun 2025014566.483.13$454
May 2025015960.553.23$514
Apr 2025016062.363.54$567
Mar 2025016567.704.27$704
Feb 2025015170.884.34$655
Jan 2025016874.324.28$719
Dec 2024016868.993.12$524
Nov 2024015669.052.20$343
Oct 2024014871.372.28$338
Sep 2024012569.612.36$296
Aug 2024012775.632.06$262
Jul 2024012579.932.15$268
Jun 2024013278.082.63$348
May 2024016778.812.20$367
Apr 2024017584.451.66$290
Mar 2024018580.301.55$286
Feb 2024017076.091.78$303
Jan 2024018373.023.30$603
Dec 2023018471.262.61$480
Nov 2023017777.892.81$497
Oct 2023014985.443.09$460
Sep 2023013489.042.74$367
Aug 2023013780.522.67$366
Jul 2023011074.852.64$291
Jun 202309968.962.26$224
May 202309870.622.23$218
Apr 202309478.122.24$210
Mar 202309772.852.39$232
Feb 202309275.112.47$227
Jan 2023056576.533.39$1,914
Dec 202201,40776.415.73$8,061
Nov 2022088585.005.65$4,997
Oct 2022095187.185.86$5,576
Sep 2022084384.888.16$6,882
Aug 2022099194.529.13$9,045
Jul 20220934101.587.54$7,044
Jun 20220986115.097.98$7,866
May 20220977109.378.43$8,239
Apr 20220818104.226.84$5,593
Mar 20220268108.885.08$1,360
Feb 2022017991.054.86$870
Jan 2022016381.844.54$740
Dec 2021013971.323.90$542
Nov 2021015677.435.24$817
Oct 2021019779.795.71$1,126
Sep 2021018269.865.35$974
Aug 2021017266.024.22$726
Jul 2021019670.783.98$780
Jun 2021020869.493.38$703
May 2021021963.483.02$661
Apr 2021020260.362.76$557
Mar 2021021461.302.72$581
Feb 2021019157.805.55$1,060
Jan 2021025250.412.81$708
Dec 2020020144.642.68$538
Nov 2020021238.772.71$574
Oct 2020023336.972.48$577
Sep 2020023337.091.99$464
Aug 2020024039.982.39$572
Jul 2020024438.371.83$445
Jun 2020023734.901.69$401
May 2020025416.921.81$461
Apr 2020024514.751.80$442
Mar 2020025930.341.86$481
Feb 2020024949.881.98$493
Jan 2020029657.252.09$620
Dec 2019028459.012.30$654
Nov 2019033955.302.75$932
Oct 2019026753.472.42$646
Sep 2019026655.052.66$707
Aug 2019017153.112.30$394
Jul 2019017356.272.46$426
Jun 2019017252.782.49$428
May 2019018458.482.74$504
Apr 2019018962.632.75$520
Mar 2019022356.803.06$683
Feb 2019021650.852.79$603
Jan 2019025146.033.23$810
Dec 2018025646.594.19$1,071
Nov 2018025252.934.24$1,068
Oct 2018025361.443.40$860
Sep 2018025159.543.11$780
Aug 2018026359.403.07$807
Jul 2018028765.142.93$841
Jun 2018026460.183.08$812
May 2018013965.382.90$403
Apr 2018018963.842.90$548
Mar 2018036561.222.79$1,017
Feb 2018020761.782.77$573
Jan 2018027862.874.01$1,115
Dec 2017028657.272.92$836
Nov 2017028955.423.12$901
Oct 2017030749.292.98$916
Sep 2017030447.523.09$939
Aug 2017032545.373.00$976
Jul 2017032843.873.09$1,013
Jun 2017031842.493.09$982
May 2017033845.373.26$1,103
Apr 2017032747.933.21$1,050
Mar 2017035846.772.98$1,068
Feb 2017034150.452.95$1,007
Jan 2017040849.413.42$1,395
Dec 2016043448.763.72$1,616
Nov 2016037942.492.64$1,002
Oct 2016032346.193.09$998
Sep 2016030241.553.10$936
Aug 2016033641.442.92$983
Jul 2016036141.622.92$1,056
Jun 2016035945.352.69$964
May 2016040442.521.99$804
Apr 2016018036.561.99$358
Mar 2016025233.011.79$452
Feb 2016024826.472.06$512
Jan 2016030627.352.36$723
Dec 2015032632.362.00$652
Nov 2015040138.792.17$869
Oct 2015037843.552.43$917
Sep 2015039242.992.76$1,081
Aug 2015038040.162.87$1,092
Jul 2015048248.152.95$1,420
Jun 2015035956.152.88$1,035
May 2015039055.212.96$1,153
Apr 2015085549.822.71$2,314
Mar 2015243942.892.93$1,374
Feb 2015039844.662.98$1,185
Jan 2015044443.433.10$1,377
Dec 2014048054.693.59$1,724
Nov 2014048570.464.25$2,062
Oct 2014051678.303.90$2,013
Sep 2014052586.164.05$2,124
Aug 2014054989.394.04$2,215
Jul 2014054796.564.18$2,286
Jun 2014056998.164.74$2,695
May 2014052594.734.73$2,481
Apr 2014039795.944.81$1,909
Mar 2014035895.895.06$1,810
Feb 2014037097.406.19$2,291
Jan 2014042490.404.86$2,061
Dec 2013144291.824.35$2,017
Nov 2013042688.853.74$1,593
Oct 2013045597.423.78$1,720
Sep 20130344104.113.72$1,279
Aug 20130433104.253.52$1,525
Jul 20130453102.523.72$1,684
Jun 2013043994.403.93$1,727
May 2013044294.834.15$1,834
Apr 2013044193.964.28$1,889
Mar 2013047993.623.91$1,874
Feb 2013043691.233.42$1,491
Jan 2013049891.603.42$1,703
Dec 2012051486.773.42$1,758
Nov 2012040886.953.62$1,479
Oct 2012048389.383.40$1,642
Sep 2012051794.672.92$1,509
Aug 2012053492.662.91$1,553
Jul 2012052485.133.02$1,583
Jun 2012049679.822.52$1,249
May 2012058091.612.49$1,443
Apr 20120575101.652.00$1,148
Mar 20120551105.052.22$1,224
Feb 20120540101.102.57$1,388
Jan 2012061898.092.73$1,690
Dec 2011061196.873.24$1,979
Nov 2011055495.723.31$1,834
Oct 2011058784.983.65$2,142
Sep 2011062483.623.99$2,487
Aug 2011081283.404.15$3,369
Jul 2011085294.144.52$3,849
Jun 2011087692.904.64$4,065
May 2011091298.134.40$4,017
Apr 20110877105.964.33$3,800
Mar 2011085696.364.06$3,473
Feb 2011083885.644.18$3,503
Jan 2011086586.504.59$3,969
Dec 2010089185.734.35$3,874
Nov 2010086080.843.80$3,264
Oct 2010086278.103.51$3,025
Sep 2010086272.633.98$3,430
Aug 2010092773.684.42$4,097
Jul 2010089572.554.74$4,239
Jun 2010085970.364.91$4,218
May 2010091571.124.24$3,875
Apr 2010076081.694.12$3,133
Mar 2010084278.394.39$3,695
Feb 2010045873.585.44$2,493
Jan 2010155174.365.96$3,361
Dec 2009056471.445.48$3,093
Nov 2009062374.593.75$2,337
Oct 2009280872.544.11$3,466
Sep 2009093665.543.06$2,869
Aug 2009097067.423.22$3,122
Jul 2009098961.133.46$3,426
Jun 2009095866.163.90$3,731
May 200901,00754.743.93$3,953
Apr 2009092446.773.59$3,315
Mar 2009091642.144.06$3,718
Feb 2009084332.814.63$3,906
Jan 2009094835.865.37$5,092
Dec 2008096937.105.98$5,792
Nov 2008093355.496.86$6,401
Oct 2008089275.246.92$6,174
Sep 20080887101.767.88$6,987
Aug 20080922114.228.48$7,821
Jul 20080932131.0811.39$10,615
Jun 20080906131.3313.03$11,808
May 20080951123.1711.57$11,007
Apr 20080985110.3110.45$10,298
Mar 200801,214101.909.66$11,732
Feb 2008095692.538.77$8,385
Jan 200801,01290.388.21$8,304
Dec 200701,02388.337.30$7,470
Nov 200701,06091.677.29$7,729
Oct 200701,20782.856.92$8,355
Sep 200701,12375.846.24$7,012
Aug 200701,30969.066.39$8,362
Jul 200701,33170.906.39$8,502
Jun 200701,32562.007.55$10,002
May 200701,46858.747.85$11,518
Apr 200701,50759.617.81$11,762
Mar 200701,57656.927.30$11,508
Feb 200701,41555.108.22$11,626
Jan 200701,61150.306.73$10,837
Dec 200601,64556.656.92$11,381
Nov 200601,63854.207.62$12,477
Oct 200601,75254.906.01$10,536
Sep 200601,75260.085.04$8,825
Aug 200601,84268.717.34$13,520
Jul 200601,88769.376.34$11,969
Jun 200601,89766.286.38$12,110
May 200602,04866.016.42$13,158
Apr 200602,02264.397.36$14,883
Mar 200602,21756.707.08$15,703
Feb 200602,09457.597.75$16,231
Jan 200602,44360.598.93$21,824
Dec 200502,54254.9413.42$34,102
Nov 200502,54254.6910.59$26,916
Oct 200502,83658.3413.80$39,125

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    2 Mcf  × $  3.05 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215976 is the state's own key, not one this site invented.