BROWN SW "220"

Operated by BRP ENERGY, LLC (P-5 41519) in the GEASLIN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217070District 7CField 34300700CondensateGasSaveExport
Value, all time
$3.8 M
Dec 2005 – May 2026
Value, last 12 filed months
$36 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 169 wells, and the rule below applies to all of them.

Discovered
1995-05-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-07-24.

The Commission's schedule remark for this field reads: 8000FT AS SHOWN ON THE LOG OF THE GEASLIN 198 LEASE, WELL NO. 1.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition89 bbl$6,760
GasProduction693,207 Mcf$3,777,957
Total$3,784,718

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3574, -101.8527. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.35741, -101.85266 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,267 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,267 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-44331124377,267 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202600106.413.05$0
Apr 202607398.932.87$209
Mar 20264089.753.15$359
Feb 2026010363.503.75$386
Jan 20260659.138.00$48
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 2025245659.383.30$1,626
Sep 202501,25062.743.08$3,846
Aug 202593,20163.933.01$10,226
Jul 202503,24966.743.32$10,771
Jun 202502,67366.483.13$8,363
May 202593,14360.553.23$10,704
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240169.052.20$2
Oct 202419171.372.28$279
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 202401179.932.15$24
Jun 202401,65278.082.63$4,351
May 202406,74778.812.20$14,833
Apr 2024643184.451.66$1,222
Mar 20240180.301.55$2
Feb 2024662076.091.78$1,562
Jan 202431,37073.023.30$4,737
Dec 2023099671.262.61$2,600
Nov 2023280277.892.81$2,407
Oct 2023164385.443.09$2,071
Sep 202301,44189.042.74$3,941
Aug 20230280.522.67$5
Jul 202331,19774.852.64$3,387
Jun 2023084968.962.26$1,917
May 202301,13270.622.23$2,521
Apr 202304178.122.24$92
Mar 202341,60872.852.39$4,140
Feb 2023085375.112.47$2,103
Jan 20230076.533.39$0
Dec 2022211876.415.73$829
Nov 20220885.005.65$45
Oct 2022087887.185.86$5,148
Sep 202221,05584.888.16$8,782
Aug 202221,05794.529.13$9,836
Jul 202201,085101.587.54$8,183
Jun 202221,114115.097.98$9,117
May 202221,176109.378.43$10,136
Apr 202221,148104.226.84$8,058
Mar 202231,681108.885.08$8,860
Feb 20223291.054.86$283
Jan 202205781.844.54$259
Dec 202131,31771.323.90$5,349
Nov 2021486077.435.24$4,813
Oct 202101,09679.795.71$6,262
Sep 202101,12469.865.35$6,014
Aug 202101,13666.024.22$4,795
Jul 202101,07170.783.98$4,265
Jun 202141,00469.493.38$3,672
May 202141,14763.483.02$3,715
Apr 202101,02360.362.76$2,822
Mar 202101,32061.302.72$3,586
Feb 2021075657.805.55$4,194
Jan 2021074650.412.81$2,096
Dec 2020082144.642.68$2,197
Nov 202001,20338.772.71$3,256
Oct 202001,14736.972.48$2,843
Sep 202001,28737.091.99$2,562
Aug 202001,43139.982.39$3,413
Jul 202001,31038.371.83$2,391
Jun 202001,34634.901.69$2,275
May 202001,31116.921.81$2,379
Apr 202001,20814.751.80$2,180
Mar 202001,34130.341.86$2,489
Feb 202004949.881.98$97
Jan 2020043157.252.09$903
Dec 201901,20359.012.30$2,772
Nov 2019050055.302.75$1,375
Oct 201901,26753.472.42$3,064
Sep 201901,03955.052.66$2,761
Aug 201901,19453.112.30$2,751
Jul 201901,15956.272.46$2,851
Jun 201901,07352.782.49$2,673
May 201901,16158.482.74$3,182
Apr 201901,07162.632.75$2,946
Mar 201901,24956.803.06$3,825
Feb 201901,15450.852.79$3,222
Jan 201901,19646.033.23$3,861
Dec 201801,30946.594.19$5,479
Nov 201801,29052.934.24$5,466
Oct 201801,32961.443.40$4,516
Sep 201801,25859.543.11$3,910
Aug 201801,31859.403.07$4,042
Jul 201801,34865.142.93$3,952
Jun 201801,20860.183.08$3,717
May 201801,34765.382.90$3,907
Apr 201831,31763.842.90$4,012
Mar 201801,44561.222.79$4,027
Feb 201801,23461.782.77$3,413
Jan 201801,33762.874.01$5,360
Dec 201701,38357.272.92$4,040
Nov 201701,47855.423.12$4,609
Oct 201701,14149.292.98$3,404
Sep 201701,32747.523.09$4,097
Aug 201701,32145.373.00$3,969
Jul 201701,39743.873.09$4,313
Jun 201701,36442.493.09$4,211
May 201701,43645.373.26$4,686
Apr 201701,41947.933.21$4,557
Mar 201701,48746.772.98$4,437
Feb 201701,41950.452.95$4,190
Jan 201701,24249.413.42$4,246
Dec 201601,54048.763.72$5,733
Nov 201601,55542.492.64$4,112
Oct 201601,55546.193.09$4,805
Sep 201601,53641.553.10$4,763
Aug 201601,40441.442.92$4,106
Jul 201601,34841.622.92$3,942
Jun 201601,33545.352.69$3,586
May 201601,45042.521.99$2,887
Apr 201601,49636.561.99$2,979
Mar 201601,55133.011.79$2,783
Feb 201601,54626.472.06$3,190
Jan 201621,70527.352.36$4,086
Dec 201501,66332.362.00$3,328
Nov 201501,46038.792.17$3,164
Oct 201501,61443.552.43$3,917
Sep 201501,58042.992.76$4,358
Aug 201501,57140.162.87$4,513
Jul 201501,73248.152.95$5,101
Jun 201501,43856.152.88$4,146
May 201501,67855.212.96$4,959
Apr 201501,68949.822.71$4,571
Mar 201501,73042.892.93$5,077
Feb 201501,47444.662.98$4,387
Jan 201501,28343.433.10$3,978
Dec 201401,70954.693.59$6,138
Nov 201401,84970.464.25$7,862
Oct 201402,03478.303.90$7,935
Sep 201401,72486.164.05$6,974
Aug 201401,65389.394.04$6,670
Jul 201401,92096.564.18$8,025
Jun 201401,96298.164.74$9,294
May 201402,03994.734.73$9,637
Apr 201402,00495.944.81$9,637
Mar 201402,11695.895.06$10,700
Feb 201401,84097.406.19$11,393
Jan 201401,85690.404.86$9,022
Dec 201302,15391.824.35$9,375
Nov 201302,11788.853.74$7,914
Oct 201302,20597.423.78$8,333
Sep 201302,199104.113.72$8,175
Aug 201302,096104.253.52$7,383
Jul 201302,245102.523.72$8,346
Jun 201301,76494.403.93$6,939
May 201302,00894.834.15$8,331
Apr 201302,01293.964.28$8,617
Mar 201302,28893.623.91$8,953
Feb 201302,16891.233.42$7,414
Jan 201302,33791.603.42$7,992
Dec 201202,19086.773.42$7,490
Nov 201202,05586.953.62$7,449
Oct 201202,49389.383.40$8,475
Sep 201202,45294.672.92$7,156
Aug 201202,59792.662.91$7,552
Jul 201202,65585.133.02$8,020
Jun 201202,33879.822.52$5,890
May 201202,72691.612.49$6,783
Apr 201202,457101.652.00$4,906
Mar 201202,579105.052.22$5,731
Feb 201202,607101.102.57$6,701
Jan 201202,39898.092.73$6,556
Dec 201102,84596.873.24$9,217
Nov 201102,86495.723.31$9,484
Oct 201102,71184.983.65$9,891
Sep 201101,85783.623.99$7,402
Aug 201102,88283.404.15$11,958
Jul 201102,90394.144.52$13,114
Jun 201102,92392.904.64$13,562
May 201103,00898.134.40$13,250
Apr 201103,011105.964.33$13,048
Mar 201103,21596.364.06$13,044
Feb 201102,82885.644.18$11,821
Jan 201103,34586.504.59$15,349
Dec 201002,83385.734.35$12,317
Nov 201013,29680.843.80$12,590
Oct 201003,23978.103.51$11,365
Sep 201003,37572.633.98$13,431
Aug 201003,20873.684.42$14,177
Jul 201003,69472.554.74$17,497
Jun 201003,69270.364.91$18,129
May 201003,51271.124.24$14,874
Apr 201003,48381.694.12$14,359
Mar 201003,93178.394.39$17,252
Feb 201003,60373.585.44$19,609
Jan 201004,14774.365.96$24,733
Dec 200903,78571.445.48$20,756
Nov 200904,36974.593.75$16,390
Oct 200904,53772.544.11$18,648
Sep 200904,51165.543.06$13,825
Aug 200904,81267.423.22$15,487
Jul 200904,66661.133.46$16,165
Jun 200904,78066.163.90$18,618
May 200904,69054.743.93$18,412
Apr 200904,91946.773.59$17,647
Mar 200905,10742.144.06$20,729
Feb 200905,18332.814.63$24,013
Jan 200904,46735.865.37$23,992
Dec 200804,99737.105.98$29,868
Nov 200803,78455.496.86$25,960
Oct 200806,81375.246.92$47,159
Sep 200803,338101.767.88$26,294
Aug 200806,026114.228.48$51,119
Jul 200806,586131.0811.39$75,011
Jun 200805,432131.3313.03$70,793
May 200807,319123.1711.57$84,712
Apr 200806,931110.3110.45$72,463
Mar 200807,052101.909.66$68,151
Feb 200806,88292.538.77$60,359
Jan 200807,64690.388.21$62,741
Dec 200707,99588.337.30$58,379
Nov 200707,92591.677.29$57,787
Oct 200708,40382.856.92$58,165
Sep 200708,31275.846.24$51,901
Aug 200707,69269.066.39$49,136
Jul 200708,55770.906.39$54,662
Jun 200708,45462.007.55$63,815
May 200709,35758.747.85$73,418
Apr 200709,28959.617.81$72,503
Mar 200709,99156.927.30$72,954
Feb 200709,33855.108.22$76,721
Jan 2007010,64650.306.73$71,614
Dec 2006010,85056.656.92$75,065
Nov 2006011,18354.207.62$85,186
Oct 2006012,42254.906.01$74,703
Sep 2006012,59660.085.04$63,449
Aug 2006013,71768.717.34$100,682
Jul 2006014,72969.376.34$93,423
Jun 2006015,46366.286.38$98,714
May 2006017,78366.016.42$114,256
Apr 2006019,69264.397.36$144,943
Mar 2006021,25956.707.08$150,576
Feb 2006086857.597.75$6,728
Jan 200601,75560.598.93$15,678
Dec 2005019054.9413.42$2,549

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   73 Mcf  × $  2.87 =       $209

────────────────────────────────────────────────────
Month total                                     $209

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/217070 is the state's own key, not one this site invented.