SAWYER 145

Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218641District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
May 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07171565
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition385 bbl$24,505
GasProduction207,875 Mcf$1,138,861
Total$1,163,366

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4961, -100.7268. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.49614, -100.72682 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-43537839177,000 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 202600106.413.05$0
Apr 202603398.932.87$95
Mar 202603889.753.15$120
Feb 202603363.503.75$124
Jan 202603259.138.00$256
Dec 202503656.664.41$159
Nov 202503958.593.93$153
Oct 202502759.383.30$89
Sep 202502962.743.08$89
Aug 202503963.933.01$118
Jul 202503466.743.32$113
Jun 202503666.483.13$113
May 202503960.553.23$126
Apr 202503562.363.54$124
Mar 202503767.704.27$158
Feb 202503470.884.34$148
Jan 202504074.324.28$171
Dec 202404168.993.12$128
Nov 202403869.052.20$84
Oct 202403871.372.28$87
Sep 202403369.612.36$78
Aug 202403475.632.06$70
Jul 202403979.932.15$84
Jun 202403778.082.63$97
May 202403678.812.20$79
Apr 202403684.451.66$60
Mar 202402880.301.55$43
Feb 20240176.091.78$2
Jan 202403973.023.30$129
Dec 202303971.262.61$102
Nov 202302177.892.81$59
Oct 202302185.443.09$65
Sep 202303489.042.74$93
Aug 202302080.522.67$53
Jul 202301874.852.64$48
Jun 202301968.962.26$43
May 202301970.622.23$42
Apr 202301478.122.24$31
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 202204076.415.73$229
Nov 202204185.005.65$231
Oct 202204287.185.86$246
Sep 202204284.888.16$343
Aug 202206694.529.13$602
Jul 2022052101.587.54$392
Jun 2022047115.097.98$375
May 2022252109.378.43$657
Apr 20220291104.226.84$1,990
Mar 2022054108.885.08$274
Feb 202205591.054.86$267
Jan 202207181.844.54$322
Dec 20210071.323.90$0
Nov 202115977.435.24$386
Oct 202107679.795.71$434
Sep 202107669.865.35$407
Aug 2021110266.024.22$497
Jul 2021014770.783.98$585
Jun 202106669.493.38$223
May 202105763.483.02$172
Apr 202103060.362.76$83
Mar 20212061.302.72$123
Feb 20210057.805.55$0
Jan 2021011550.412.81$323
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020452614.751.80$1,008
Mar 2020457030.341.86$1,179
Feb 2020350749.881.98$1,154
Jan 2020454557.252.09$1,371
Dec 2019357459.012.30$1,500
Nov 2019349155.302.75$1,516
Oct 2019452553.472.42$1,484
Sep 2019261755.052.66$1,750
Aug 2019268153.112.30$1,675
Jul 2019270556.272.46$1,847
Jun 2019255252.782.49$1,481
May 2019258058.482.74$1,706
Apr 2019157762.632.75$1,650
Mar 2019053056.803.06$1,623
Feb 2019044150.852.79$1,231
Jan 2019143446.033.23$1,447
Dec 2018068746.594.19$2,875
Nov 2018260652.934.24$2,674
Oct 2018050361.443.40$1,709
Sep 2018155559.543.11$1,784
Aug 2018066659.403.07$2,042
Jul 2018063365.142.93$1,856
Jun 2018056760.183.08$1,745
May 2018068165.382.90$1,975
Apr 2018069863.842.90$2,025
Mar 2018067361.222.79$1,876
Feb 2018047661.782.77$1,317
Jan 2018035762.874.01$1,431
Dec 2017065757.272.92$1,919
Nov 2017048555.423.12$1,512
Oct 2017048749.292.98$1,453
Sep 2017158547.523.09$1,854
Aug 2017870045.373.00$2,466
Jul 20172461743.873.09$2,958
Jun 20171555442.493.09$2,348
May 2017059845.373.26$1,952
Apr 2017058347.933.21$1,872
Mar 2017039446.772.98$1,176
Feb 2017043650.452.95$1,287
Jan 2017054749.413.42$1,870
Dec 2016083348.763.72$3,101
Nov 2016052042.492.64$1,375
Oct 2016060746.193.09$1,876
Sep 2016067741.553.10$2,099
Aug 2016082341.442.92$2,407
Jul 2016045241.622.92$1,322
Jun 2016068945.352.69$1,851
May 2016060842.521.99$1,211
Apr 2016071236.561.99$1,418
Mar 2016070033.011.79$1,256
Feb 2016052026.472.06$1,073
Jan 2016058527.352.36$1,383
Dec 2015055832.362.00$1,117
Nov 2015049638.792.17$1,075
Oct 2015044943.552.43$1,090
Sep 2015066742.992.76$1,840
Aug 2015063040.162.87$1,810
Jul 2015067448.152.95$1,985
Jun 2015098356.152.88$2,834
May 2015091055.212.96$2,689
Apr 2015062649.822.71$1,694
Mar 2015066842.892.93$1,960
Feb 2015056044.662.98$1,667
Jan 2015053143.433.10$1,646
Dec 2014035354.693.59$1,268
Nov 2014049670.464.25$2,109
Oct 2014047178.303.90$1,837
Sep 2014048986.164.05$1,978
Aug 2014067689.394.04$2,728
Jul 2014079296.564.18$3,310
Jun 2014080298.164.74$3,799
May 2014087894.734.73$4,150
Apr 2014077195.944.81$3,708
Mar 2014092295.895.06$4,662
Feb 2014085697.406.19$5,300
Jan 2014059990.404.86$2,912
Dec 2013057091.824.35$2,482
Nov 2013075288.853.74$2,811
Oct 2013075497.423.78$2,850
Sep 20130409104.113.72$1,521
Aug 20130875104.253.52$3,082
Jul 20130775102.523.72$2,881
Jun 2013089094.403.93$3,501
May 2013084194.834.15$3,489
Apr 2013092393.964.28$3,953
Mar 2013078093.623.91$3,052
Feb 2013024091.233.42$821
Jan 2013034591.603.42$1,180
Dec 2012024686.773.42$841
Nov 2012018486.953.62$667
Oct 2012018789.383.40$636
Sep 2012033194.672.92$966
Aug 2012059192.662.91$1,719
Jul 2012049185.133.02$1,483
Jun 2012054879.822.52$1,380
May 2012088291.612.49$2,195
Apr 20120581101.652.00$1,160
Mar 20120753105.052.22$1,673
Feb 20120611101.102.57$1,570
Jan 2012066998.092.73$1,829
Dec 2011067796.873.24$2,193
Nov 2011071495.723.31$2,364
Oct 2011091884.983.65$3,349
Sep 201101,10783.623.99$4,412
Aug 2011071083.404.15$2,946
Jul 2011065394.144.52$2,950
Jun 2011061792.904.64$2,863
May 2011075198.134.40$3,308
Apr 20110812105.964.33$3,519
Mar 201101,04896.364.06$4,252
Feb 2011563985.644.18$3,099
Jan 2011373486.504.59$3,628
Dec 2010069885.734.35$3,035
Nov 2010082880.843.80$3,143
Oct 2010096878.103.51$3,397
Sep 2010083472.633.98$3,319
Aug 2010074473.684.42$3,288
Jul 2010068172.554.74$3,226
Jun 2010072370.364.91$3,550
May 2010093271.124.24$3,947
Apr 2010151,20581.694.12$6,193
Mar 2010121,28078.394.39$6,558
Feb 2010967473.585.44$4,330
Jan 201001,70774.365.96$10,181
Dec 2009099871.445.48$5,473
Nov 200991,35874.593.75$5,766
Oct 2009101,62072.544.11$7,384
Sep 200901,83365.543.06$5,618
Aug 200902,01167.423.22$6,472
Jul 200931,68661.133.46$6,025
Jun 200901,61066.163.90$6,271
May 200971,88454.743.93$7,779
Apr 200931,99446.773.59$7,294
Mar 200931,79442.144.06$7,408
Feb 200941,81232.814.63$8,526
Jan 2009102,09035.865.37$11,584
Dec 200801,57037.105.98$9,384
Nov 200851,56555.496.86$11,014
Oct 200831,90875.246.92$13,433
Sep 200862,028101.767.88$16,585
Aug 200832,211114.228.48$19,099
Jul 200842,363131.0811.39$27,438
Jun 200801,951131.3313.03$25,427
May 200842,398123.1711.57$28,248
Apr 2008102,532110.3110.45$27,575
Mar 200801,956101.909.66$18,903
Feb 200801,91092.538.77$16,752
Jan 2008142,60490.388.21$22,633
Dec 200702,57088.337.30$18,766
Nov 200702,30391.677.29$16,793
Oct 200742,58282.856.92$18,204
Sep 200702,34875.846.24$14,661
Aug 200702,62169.066.39$16,743
Jul 200704,06370.906.39$25,954
Jun 200702,07262.007.55$15,640
May 200702,47858.747.85$19,443
Apr 2007172,70259.617.81$22,103
Mar 200754,50456.927.30$33,173
Feb 2007112,89155.108.22$24,359
Jan 2007113,72350.306.73$25,597
Dec 2006183,84556.656.92$27,621
Nov 2006153,90454.207.62$30,552
Oct 2006165,93554.906.01$36,570
Sep 2006165,41760.085.04$28,248
Aug 2006226,23868.717.34$47,298
Jul 200606,62169.376.34$41,995
Jun 2006148,90966.286.38$57,802
May 200602,65166.016.42$17,033

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   33 Mcf  × $  2.87 =        $95

────────────────────────────────────────────────────
Month total                                      $95

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218641 is the state's own key, not one this site invented.