SAWYER A 144

Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218673District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$888 k
Apr 2006 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07171568
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition127 bbl$9,266
GasProduction167,757 Mcf$878,899
Total$888,165

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4882, -100.7115. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.48816, -100.71153 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,118 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,118 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-43537906197,118 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202600106.413.05$0
Apr 2026124698.932.87$805
Mar 2026128789.753.15$994
Feb 2026124663.503.75$986
Jan 2026124459.138.00$2,011
Dec 2025127156.664.41$1,253
Nov 2025129558.593.93$1,217
Oct 2025120659.383.30$740
Sep 2025121962.743.08$737
Aug 2025129163.933.01$941
Jul 2025125866.743.32$922
Jun 2025127266.483.13$917
May 2025129060.553.23$998
Apr 2025126262.363.54$991
Mar 2025127967.704.27$1,259
Feb 2025125970.884.34$1,195
Jan 2025130174.324.28$1,362
Dec 2024130868.993.12$1,030
Nov 2024128769.052.20$700
Oct 2024128671.372.28$724
Sep 2024125069.612.36$661
Aug 2024125775.632.06$606
Jul 2024129279.932.15$707
Jun 2024127878.082.63$810
May 2024127078.812.20$672
Apr 2024126884.451.66$529
Mar 2024113980.301.55$295
Feb 2024126076.091.78$540
Jan 2024328873.023.30$1,169
Dec 2023329471.262.61$981
Nov 2023232177.892.81$1,057
Oct 2023230585.443.09$1,113
Sep 2023234189.042.74$1,111
Aug 2023229780.522.67$955
Jul 2023231374.852.64$977
Jun 2023230168.962.26$818
May 2023034670.622.23$771
Apr 2023229978.122.24$825
Mar 2023331072.852.39$960
Feb 2023231975.112.47$937
Jan 2023334876.533.39$1,409
Dec 2022229576.415.73$1,843
Nov 2022230585.005.65$1,892
Oct 2022140687.185.86$2,468
Sep 2022228084.888.16$2,456
Aug 2022141394.529.13$3,864
Jul 20222307101.587.54$2,519
Jun 20222400115.097.98$3,421
May 20224442109.378.43$4,165
Apr 20222465104.226.84$3,388
Mar 20224530108.885.08$3,126
Feb 2022248991.054.86$2,558
Jan 2022047881.844.54$2,169
Dec 2021245871.323.90$1,928
Nov 2021441977.435.24$2,504
Oct 2021243879.795.71$2,662
Sep 2021242969.865.35$2,435
Aug 2021449966.024.22$2,370
Jul 2021250170.783.98$2,137
Jun 2021249269.493.38$1,802
May 2021258763.483.02$1,898
Apr 2021453260.362.76$1,709
Mar 2021481261.302.72$2,451
Feb 2021041657.805.55$2,308
Jan 202105450.412.81$152
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020322914.751.80$457
Mar 2020237430.341.86$755
Feb 2020225849.881.98$611
Jan 2020235257.252.09$852
Dec 2019227559.012.30$752
Nov 2019233255.302.75$1,024
Oct 2019228353.472.42$791
Sep 2019136555.052.66$1,025
Aug 2019132553.112.30$802
Jul 2019133956.272.46$890
Jun 2019131752.782.49$842
May 2019132258.482.74$941
Apr 2019039562.632.75$1,087
Mar 2019027456.803.06$839
Feb 2019022950.852.79$639
Jan 2019030346.033.23$978
Dec 2018033746.594.19$1,410
Nov 2018024252.934.24$1,025
Oct 2018028561.443.40$968
Sep 2018029459.543.11$914
Aug 2018042759.403.07$1,309
Jul 2018033265.142.93$973
Jun 2018034760.183.08$1,068
May 2018080165.382.90$2,324
Apr 2018046863.842.90$1,358
Mar 2018070761.222.79$1,970
Feb 2018036861.782.77$1,018
Jan 2018033162.874.01$1,327
Dec 2017025657.272.92$748
Nov 2017038055.423.12$1,185
Oct 2017043749.292.98$1,304
Sep 2017033347.523.09$1,028
Aug 2017046645.373.00$1,400
Jul 2017048043.873.09$1,482
Jun 2017041442.493.09$1,278
May 2017052045.373.26$1,697
Apr 2017038447.933.21$1,233
Mar 2017029546.772.98$880
Feb 2017027750.452.95$818
Jan 2017057349.413.42$1,959
Dec 2016044948.763.72$1,672
Nov 2016049342.492.64$1,304
Oct 2016060746.193.09$1,876
Sep 2016048141.553.10$1,491
Aug 2016061441.442.92$1,796
Jul 2016061441.622.92$1,796
Jun 2016052445.352.69$1,407
May 2016028842.521.99$573
Apr 2016031536.561.99$627
Mar 2016037633.011.79$675
Feb 2016047926.472.06$988
Jan 2016089427.352.36$2,114
Dec 2015094432.362.00$1,889
Nov 2015092938.792.17$2,013
Oct 2015088743.552.43$2,152
Sep 2015044442.992.76$1,225
Aug 2015045740.162.87$1,313
Jul 2015042448.152.95$1,249
Jun 2015069456.152.88$2,001
May 2015086155.212.96$2,545
Apr 2015079749.822.71$2,157
Mar 2015084242.892.93$2,471
Feb 2015048444.662.98$1,440
Jan 2015045643.433.10$1,414
Dec 2014052454.693.59$1,882
Nov 2014053670.464.25$2,279
Oct 2014055478.303.90$2,161
Sep 2014066286.164.05$2,678
Aug 2014064789.394.04$2,611
Jul 2014064196.564.18$2,679
Jun 2014052898.164.74$2,501
May 2014053794.734.73$2,538
Apr 2014053495.944.81$2,568
Mar 2014048095.895.06$2,427
Feb 2014054097.406.19$3,344
Jan 2014061390.404.86$2,980
Dec 2013058791.824.35$2,556
Nov 2013078388.853.74$2,927
Oct 2013059597.423.78$2,249
Sep 20130368104.113.72$1,368
Aug 20130614104.253.52$2,163
Jul 20130668102.523.72$2,483
Jun 2013062494.403.93$2,454
May 2013077194.834.15$3,199
Apr 2013042093.964.28$1,799
Mar 2013068893.623.91$2,692
Feb 2013063291.233.42$2,161
Jan 2013073591.603.42$2,514
Dec 2012058786.773.42$2,008
Nov 2012070686.953.62$2,559
Oct 2012069389.383.40$2,356
Sep 2012054894.672.92$1,599
Aug 2012057992.662.91$1,684
Jul 2012064685.133.02$1,951
Jun 2012053079.822.52$1,335
May 201205091.612.49$124
Apr 20120641101.652.00$1,280
Mar 20120577105.052.22$1,282
Feb 20120586101.102.57$1,506
Jan 2012064698.092.73$1,766
Dec 2011052496.873.24$1,698
Nov 2011047095.723.31$1,556
Oct 2011048784.983.65$1,777
Sep 2011055883.623.99$2,224
Aug 2011071183.404.15$2,950
Jul 2011060094.144.52$2,710
Jun 2011061792.904.64$2,863
May 2011057998.134.40$2,550
Apr 20110674105.964.33$2,921
Mar 2011067496.364.06$2,735
Feb 2011061285.644.18$2,558
Jan 2011081586.504.59$3,740
Dec 2010073685.734.35$3,200
Nov 2010066480.843.80$2,520
Oct 2010066578.103.51$2,333
Sep 2010067372.633.98$2,678
Aug 2010074873.684.42$3,306
Jul 2010050672.554.74$2,397
Jun 2010087770.364.91$4,306
May 2010091171.124.24$3,858
Apr 2010082881.694.12$3,414
Mar 2010062278.394.39$2,730
Feb 2010064173.585.44$3,489
Jan 201001,19174.365.96$7,103
Dec 200901,16271.445.48$6,372
Nov 200901,09374.593.75$4,100
Oct 2009074372.544.11$3,054
Sep 2009066365.543.06$2,032
Aug 200901,03567.423.22$3,331
Jul 200901,03161.133.46$3,572
Jun 200901,35366.163.90$5,270
May 200901,04554.743.93$4,102
Apr 2009088746.773.59$3,182
Mar 200901,07342.144.06$4,355
Feb 2009083632.814.63$3,873
Jan 200901,47435.865.37$7,917
Dec 200801,37037.105.98$8,189
Nov 200802,78655.496.86$19,113
Oct 200802,73975.246.92$18,959
Sep 200801,766101.767.88$13,911
Aug 200801,448114.228.48$12,283
Jul 200801,376131.0811.39$15,672
Jun 200801,925131.3313.03$25,088
May 200802,065123.1711.57$23,901
Apr 200801,511110.3110.45$15,797
Mar 200802,138101.909.66$20,662
Feb 200801,98092.538.77$17,366
Jan 200801,69490.388.21$13,901
Dec 200701,38288.337.30$10,091
Nov 200702,33591.677.29$17,026
Oct 200702,19382.856.92$15,180
Sep 200701,32675.846.24$8,280
Aug 200701,68569.066.39$10,764
Jul 200702,22970.906.39$14,239
Jun 200702,22062.007.55$16,758
May 200702,52058.747.85$19,773
Apr 200701,57659.617.81$12,301
Mar 200701,75456.927.30$12,808
Feb 200701,52555.108.22$12,529
Jan 200701,59050.306.73$10,696
Dec 200601,62856.656.92$11,263
Nov 200602,79254.207.62$21,268
Oct 200602,68254.906.01$16,129
Sep 200602,81260.085.04$14,165
Aug 200602,94768.717.34$21,631
Jul 200602,99269.376.34$18,978
Jun 200602,71266.286.38$17,313
May 200603,20166.016.42$20,566
Apr 2006028164.397.36$2,068

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $ 98.93 =        $99
Gas                  246 Mcf  × $  2.87 =       $706

────────────────────────────────────────────────────
Month total                                     $805

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218673 is the state's own key, not one this site invented.