DAVIS "F"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218911District 7CField 846465002 tax incentive programmesGasSaveExport
Value, all time
$580 k
Mar 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
243
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22168930
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction92,731 Mcf$579,954
Total$579,954

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6045, -100.6299. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60449, -100.62985 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,900 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-43537619185,900 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202639106.413.05$119
Apr 20263798.932.87$106
Mar 20263989.753.15$123
Feb 20263863.503.75$143
Jan 20263359.138.00$264
Dec 20253556.664.41$154
Nov 20253458.593.93$134
Oct 20253659.383.30$119
Sep 20253562.743.08$108
Aug 20253863.933.01$115
Jul 20253766.743.32$123
Jun 20253566.483.13$110
May 20253860.553.23$123
Apr 20253662.363.54$128
Mar 20254067.704.27$171
Feb 20253570.884.34$152
Jan 20253874.324.28$163
Dec 20243468.993.12$106
Nov 20243369.052.20$73
Oct 20243671.372.28$82
Sep 20243569.612.36$83
Aug 20243775.632.06$76
Jul 20243879.932.15$82
Jun 20243678.082.63$95
May 20243878.812.20$84
Apr 20243784.451.66$61
Mar 20243880.301.55$59
Feb 20243676.091.78$64
Jan 20244373.023.30$142
Dec 20233771.262.61$97
Nov 20233977.892.81$109
Oct 20234085.443.09$123
Sep 20234089.042.74$109
Aug 20234080.522.67$107
Jul 20234174.852.64$108
Jun 20234068.962.26$90
May 20234170.622.23$91
Apr 20234178.122.24$92
Mar 20234272.852.39$101
Feb 20233875.112.47$94
Jan 20234276.533.39$142
Dec 20224276.415.73$241
Nov 20224185.005.65$231
Oct 20224387.185.86$252
Sep 20224284.888.16$343
Aug 20224394.529.13$392
Jul 202243101.587.54$324
Jun 202243115.097.98$343
May 202244109.378.43$371
Apr 202243104.226.84$294
Mar 202244108.885.08$223
Feb 20221691.054.86$78
Jan 20221881.844.54$82
Dec 20211771.323.90$66
Nov 20211777.435.24$89
Oct 2021379.795.71$17
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021163.483.02$3
Apr 2021860.362.76$22
Mar 2021961.302.72$24
Feb 20213557.805.55$194
Jan 20213150.412.81$87
Dec 20204244.642.68$112
Nov 20204538.772.71$122
Oct 20201536.972.48$37
Sep 20201337.091.99$26
Aug 2020539.982.39$12
Jul 2020238.371.83$4
Jun 2020134.901.69$2
May 2020716.921.81$13
Apr 20201814.751.80$32
Mar 20202030.341.86$37
Feb 20202149.881.98$42
Jan 20202357.252.09$48
Dec 20192459.012.30$55
Nov 20192355.302.75$63
Oct 20192753.472.42$65
Sep 20192355.052.66$61
Aug 20192453.112.30$55
Jul 20192556.272.46$62
Jun 20192452.782.49$60
May 20192858.482.74$77
Apr 20192862.632.75$77
Mar 20192556.803.06$77
Feb 20192250.852.79$61
Jan 20192546.033.23$81
Dec 20182546.594.19$105
Nov 20182752.934.24$114
Oct 20182961.443.40$99
Sep 20182759.543.11$84
Aug 20182759.403.07$83
Jul 20183265.142.93$94
Jun 20183060.183.08$92
May 20183465.382.90$99
Apr 20183863.842.90$110
Mar 20183061.222.79$84
Feb 20183561.782.77$97
Jan 20186862.874.01$273
Dec 20176757.272.92$196
Nov 20176655.423.12$206
Oct 20176949.292.98$206
Sep 20176947.523.09$213
Aug 20177045.373.00$210
Jul 20177143.873.09$219
Jun 20177042.493.09$216
May 20177345.373.26$238
Apr 20177347.933.21$234
Mar 20177546.772.98$224
Feb 20176850.452.95$201
Jan 20177649.413.42$260
Dec 20167748.763.72$287
Nov 20167642.492.64$201
Oct 20168046.193.09$247
Sep 20167941.553.10$245
Aug 20168241.442.92$240
Jul 20165641.622.92$164
Jun 20163545.352.69$94
May 20163842.521.99$76
Apr 20164336.561.99$86
Mar 20163633.011.79$65
Feb 20167526.472.06$155
Jan 20168527.352.36$201
Dec 20154432.362.00$88
Nov 20157338.792.17$158
Oct 20157743.552.43$187
Sep 20157742.992.76$212
Aug 20155740.162.87$164
Jul 20154448.152.95$130
Jun 20159956.152.88$285
May 201511055.212.96$325
Apr 201511549.822.71$311
Mar 201511042.892.93$323
Feb 201510544.662.98$313
Jan 201512143.433.10$375
Dec 201414454.693.59$517
Nov 201413470.464.25$570
Oct 201411378.303.90$441
Sep 201412486.164.05$502
Aug 201413089.394.04$525
Jul 201413396.564.18$556
Jun 201412798.164.74$602
May 201413394.734.73$629
Apr 201413895.944.81$664
Mar 201412495.895.06$627
Feb 201412397.406.19$762
Jan 201413890.404.86$671
Dec 201314491.824.35$627
Nov 201314388.853.74$535
Oct 201315197.423.78$571
Sep 2013150104.113.72$558
Aug 2013157104.253.52$553
Jul 2013158102.523.72$587
Jun 201315794.403.93$618
May 201316594.834.15$685
Apr 201316493.964.28$702
Mar 201317293.623.91$673
Feb 201315891.233.42$540
Jan 201317091.603.42$581
Dec 201217586.773.42$599
Nov 201216986.953.62$613
Oct 201218089.383.40$612
Sep 201214594.672.92$423
Aug 201214292.662.91$413
Jul 201215185.133.02$456
Jun 201217079.822.52$428
May 201222691.612.49$562
Apr 2012215101.652.00$429
Mar 2012236105.052.22$524
Feb 2012235101.102.57$604
Jan 201222598.092.73$615
Dec 201117696.873.24$570
Nov 201129895.723.31$987
Oct 201117184.983.65$624
Sep 20116183.623.99$243
Aug 201110483.404.15$432
Jul 201116194.144.52$727
Jun 201124592.904.64$1,137
May 201136998.134.40$1,625
Apr 2011360105.964.33$1,560
Mar 201137096.364.06$1,501
Feb 201125285.644.18$1,053
Jan 201143386.504.59$1,987
Dec 201046285.734.35$2,009
Nov 201043180.843.80$1,636
Oct 201046578.103.51$1,632
Sep 201032872.633.98$1,305
Aug 201040273.684.42$1,777
Jul 201050072.554.74$2,368
Jun 201042470.364.91$2,082
May 201053571.124.24$2,266
Apr 201056981.694.12$2,346
Mar 201061778.394.39$2,708
Feb 201058973.585.44$3,206
Jan 201062074.365.96$3,698
Dec 200968371.445.48$3,745
Nov 200965074.593.75$2,438
Oct 200969472.544.11$2,853
Sep 200968565.543.06$2,099
Aug 200973667.423.22$2,369
Jul 200976461.133.46$2,647
Jun 200977866.163.90$3,030
May 200982154.743.93$3,223
Apr 200982646.773.59$2,963
Mar 200987242.144.06$3,539
Feb 200979732.814.63$3,693
Jan 200989035.865.37$4,780
Dec 200887537.105.98$5,230
Nov 200893155.496.86$6,387
Oct 200895575.246.92$6,610
Sep 20081,037101.767.88$8,169
Aug 20081,101114.228.48$9,340
Jul 20081,106131.0811.39$12,597
Jun 2008883131.3313.03$11,508
May 20081,124123.1711.57$13,010
Apr 2008951110.3110.45$9,943
Mar 20081,207101.909.66$11,665
Feb 20081,15692.538.77$10,139
Jan 20081,26890.388.21$10,405
Dec 20071,33988.337.30$9,777
Nov 20071,31891.677.29$9,610
Oct 20071,42382.856.92$9,850
Sep 20071,24375.846.24$7,761
Aug 20071,39269.066.39$8,892
Jul 20071,51070.906.39$9,646
Jun 20071,51562.007.55$11,436
May 20071,62858.747.85$12,774
Apr 20071,65959.617.81$12,949
Mar 20071,82556.927.30$13,326
Feb 20071,74155.108.22$14,304
Jan 20072,05050.306.73$13,790
Dec 20062,17956.656.92$15,075
Nov 20062,22254.207.62$16,926
Oct 20062,48454.906.01$14,938
Sep 20062,17660.085.04$10,961
Aug 20062,61168.717.34$19,165
Jul 20062,98369.376.34$18,920
Jun 20063,25566.286.38$20,780
May 20063,92066.016.42$25,186
Apr 20064,57564.397.36$33,674
Mar 20065,55156.707.08$39,317

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   39 Mcf  × $  3.05 =       $119

────────────────────────────────────────────────────
Month total                                     $119

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218911 is the state's own key, not one this site invented.