BAILEY, J. R. "A"

Operated by ZARVONA ENERGY LLC (P-5 950523) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218963District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Mar 2006 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-25168950
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition961 bbl$70,339
GasProduction203,126 Mcf$1,172,394
Total$1,242,733

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7728, -100.9821. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.77281, -100.98207 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,510 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,510 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-105396527108,510 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202605106.413.05$15
Apr 20260498.932.87$11
Mar 202603589.753.15$110
Feb 2026016163.503.75$604
Jan 2026023159.138.00$1,848
Dec 2025012856.664.41$565
Nov 20250058.593.93$0
Oct 2025015859.383.30$522
Sep 2025015862.743.08$486
Aug 2025016663.933.01$500
Jul 2025017266.743.32$570
Jun 2025016766.483.13$523
May 2025018660.553.23$601
Apr 2025019362.363.54$684
Mar 2025022567.704.27$960
Feb 2025021970.884.34$951
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 202402875.632.06$58
Jul 2024015479.932.15$331
Jun 2024013678.082.63$358
May 2024013278.812.20$290
Apr 2024014484.451.66$239
Mar 2024015480.301.55$238
Feb 2024014576.091.78$259
Jan 2024014673.023.30$481
Dec 2023016271.262.61$423
Nov 2023015377.892.81$430
Oct 2023016585.443.09$509
Sep 2023016589.042.74$451
Aug 2023014880.522.67$396
Jul 2023016474.852.64$433
Jun 2023016268.962.26$366
May 2023015970.622.23$354
Apr 2023021278.122.24$474
Mar 2023013372.852.39$318
Feb 2023017475.112.47$429
Jan 2023018976.533.39$640
Dec 2022018776.415.73$1,071
Nov 2022018885.005.65$1,061
Oct 2022019487.185.86$1,138
Sep 2022018984.888.16$1,543
Aug 2022019594.529.13$1,780
Jul 20220200101.587.54$1,508
Jun 20220165115.097.98$1,316
May 20220205109.378.43$1,729
Apr 20220199104.226.84$1,361
Mar 20220202108.885.08$1,025
Feb 2022018791.054.86$909
Jan 2022022181.844.54$1,003
Dec 2021021071.323.90$819
Nov 2021020377.435.24$1,063
Oct 2021022579.795.71$1,286
Sep 2021017369.865.35$926
Aug 2021021266.024.22$895
Jul 2021021670.783.98$860
Jun 2021022869.493.38$771
May 2021020863.483.02$628
Apr 2021021760.362.76$599
Mar 2021022561.302.72$611
Feb 2021017257.805.55$954
Jan 2021022250.412.81$624
Dec 2020021844.642.68$583
Nov 2020022138.772.71$598
Oct 2020023136.972.48$573
Sep 2020022637.091.99$450
Aug 2020023739.982.39$565
Jul 2020024438.371.83$445
Jun 2020024034.901.69$406
May 2020025216.921.81$457
Apr 2020023714.751.80$428
Mar 2020023930.341.86$444
Feb 2020023849.881.98$471
Jan 2020023257.252.09$486
Dec 2019025059.012.30$576
Nov 2019026555.302.75$729
Oct 2019021453.472.42$518
Sep 2019023955.052.66$635
Aug 2019026253.112.30$604
Jul 2019025556.272.46$627
Jun 2019026052.782.49$648
May 2019026058.482.74$712
Apr 2019026162.632.75$718
Mar 2019026656.803.06$815
Feb 2019024650.852.79$687
Jan 2019026946.033.23$868
Dec 2018026246.594.19$1,097
Nov 2018028052.934.24$1,186
Oct 2018023761.443.40$805
Sep 2018028859.543.11$895
Aug 2018033459.403.07$1,024
Jul 2018023965.142.93$701
Jun 2018027160.183.08$834
May 2018025165.382.90$728
Apr 2018027463.842.90$795
Mar 2018026861.222.79$747
Feb 2018026361.782.77$727
Jan 2018026862.874.01$1,075
Dec 20176527157.272.92$4,514
Nov 2017026855.423.12$836
Oct 2017026749.292.98$797
Sep 2017028647.523.09$883
Aug 2017028145.373.00$844
Jul 2017029943.873.09$923
Jun 2017025842.493.09$797
May 2017026545.373.26$865
Apr 2017028947.933.21$928
Mar 2017030746.772.98$916
Feb 2017026850.452.95$791
Jan 2017030449.413.42$1,039
Dec 2016030048.763.72$1,117
Nov 2016030842.492.64$814
Oct 2016032646.193.09$1,007
Sep 2016031741.553.10$983
Aug 2016036741.442.92$1,073
Jul 2016032841.622.92$959
Jun 2016029845.352.69$800
May 2016032142.521.99$639
Apr 2016032636.561.99$649
Mar 2016033033.011.79$592
Feb 2016031426.472.06$648
Jan 2016034227.352.36$809
Dec 2015037132.362.00$743
Nov 2015035438.792.17$767
Oct 2015037943.552.43$920
Sep 2015033342.992.76$919
Aug 2015029240.162.87$839
Jul 2015036148.152.95$1,063
Jun 2015039356.152.88$1,133
May 2015033755.212.96$996
Apr 2015036649.822.71$991
Mar 2015038742.892.93$1,136
Feb 2015037644.662.98$1,119
Jan 2015041443.433.10$1,284
Dec 2014039854.693.59$1,429
Nov 2014046370.464.25$1,969
Oct 2014043078.303.90$1,677
Sep 2014048986.164.05$1,978
Aug 2014051289.394.04$2,066
Jul 2014049196.564.18$2,052
Jun 2014047398.164.74$2,241
May 2014053894.734.73$2,543
Apr 2014057995.944.81$2,784
Mar 2014046495.895.06$2,346
Feb 2014051797.406.19$3,201
Jan 2014058490.404.86$2,839
Dec 2013056891.824.35$2,473
Nov 2013056288.853.74$2,101
Oct 20134163997.423.78$6,409
Sep 20130602104.113.72$2,238
Aug 20130622104.253.52$2,191
Jul 20130662102.523.72$2,461
Jun 2013065894.403.93$2,588
May 2013060294.834.15$2,498
Apr 2013079693.964.28$3,409
Mar 2013033293.623.91$1,299
Feb 2013064191.233.42$2,192
Jan 2013076891.603.42$2,626
Dec 2012074786.773.42$2,555
Nov 2012478186.953.62$3,179
Oct 2012589689.383.40$3,493
Sep 2012092494.672.92$2,697
Aug 2012053292.662.91$1,547
Jul 2012545885.133.02$1,809
Jun 2012073079.822.52$1,839
May 2012582691.612.49$2,513
Apr 20120798101.652.00$1,593
Mar 20120653105.052.22$1,451
Feb 20120742101.102.57$1,907
Jan 2012075598.092.73$2,064
Dec 2011060396.873.24$1,954
Nov 2011057395.723.31$1,897
Oct 2011043384.983.65$1,580
Sep 2011055083.623.99$2,192
Aug 2011060483.404.15$2,506
Jul 2011060394.144.52$2,724
Jun 2011061792.904.64$2,863
May 2011065598.134.40$2,885
Apr 20110592105.964.33$2,565
Mar 2011066296.364.06$2,686
Feb 2011060185.644.18$2,512
Jan 2011064786.504.59$2,969
Dec 20104265685.734.35$6,453
Nov 2010069080.843.80$2,619
Oct 2010076078.103.51$2,667
Sep 2010076472.633.98$3,040
Aug 2010085873.684.42$3,792
Jul 2010077772.554.74$3,680
Jun 2010086570.364.91$4,248
May 2010067971.124.24$2,876
Apr 2010069381.694.12$2,857
Mar 2010079078.394.39$3,467
Feb 2010080973.585.44$4,403
Jan 2010095574.365.96$5,696
Dec 2009095771.445.48$5,248
Nov 20092594274.593.75$5,399
Oct 2009098272.544.11$4,036
Sep 200901,11265.543.06$3,408
Aug 200901,17867.423.22$3,791
Jul 200901,19361.133.46$4,133
Jun 20091081,17366.163.90$11,714
May 2009092754.743.93$3,639
Apr 200901,09346.773.59$3,921
Mar 200901,25042.144.06$5,074
Feb 200901,15032.814.63$5,328
Jan 200901,36035.865.37$7,305
Dec 200801,22037.105.98$7,292
Nov 200801,33055.496.86$9,124
Oct 200801,21275.246.92$8,389
Sep 20080813101.767.88$6,404
Aug 200801,376114.228.48$11,673
Jul 200801,573131.0811.39$17,916
Jun 200801,496131.3313.03$19,497
May 200801,551123.1711.57$17,952
Apr 20081681,523110.3110.45$34,455
Mar 200801,619101.909.66$15,646
Feb 200801,58092.538.77$13,858
Jan 200801,81390.388.21$14,877
Dec 200702,09788.337.30$15,312
Nov 200702,04091.677.29$14,875
Oct 200702,29782.856.92$15,900
Sep 200702,28275.846.24$14,249
Aug 200702,51669.066.39$16,072
Jul 200702,58070.906.39$16,481
Jun 200702,71162.007.55$20,464
May 200703,00058.747.85$23,539
Apr 200703,01259.617.81$23,509
Mar 200703,12856.927.30$22,841
Feb 20071663,31355.108.22$36,366
Jan 200703,99150.306.73$26,847
Dec 200604,90356.656.92$33,921
Nov 200604,09854.207.62$31,216
Oct 200605,19954.906.01$31,266
Sep 20061575,53860.085.04$37,329
Aug 200606,16168.717.34$45,221
Jul 200606,19169.376.34$39,268
Jun 200608,20066.286.38$52,348
May 200617011,23166.016.42$83,381
Apr 2006018,77164.397.36$138,164
Mar 20060056.707.08$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    5 Mcf  × $  3.05 =        $15

────────────────────────────────────────────────────
Month total                                      $15

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218963 is the state's own key, not one this site invented.