Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219343District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$307 k
Oct 2005 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-25169274
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition42 bbl$3,175
GasProduction49,465 Mcf$304,235
Total$307,410

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7403, -100.7321. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.74035, -100.73212 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,600 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-4133229577,600 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 202606106.413.05$18
Apr 2026024898.932.87$712
Mar 2026045289.753.15$1,424
Feb 2026025963.503.75$971
Jan 2026035159.138.00$2,807
Dec 2025035456.664.41$1,562
Nov 2025032658.593.93$1,280
Oct 2025035959.383.30$1,186
Sep 2025032062.743.08$985
Aug 2025028063.933.01$844
Jul 2025040366.743.32$1,336
Jun 2025038766.483.13$1,211
May 2025049460.553.23$1,597
Apr 2025064062.363.54$2,268
Mar 2025055967.704.27$2,386
Feb 2025025270.884.34$1,094
Jan 2025018874.324.28$804
Dec 2024034068.993.12$1,061
Nov 2024024869.052.20$545
Oct 2024022771.372.28$518
Sep 2024021069.612.36$497
Aug 2024018275.632.06$376
Jul 2024010979.932.15$234
Jun 202409378.082.63$245
May 2024030978.812.20$679
Apr 2024056284.451.66$932
Mar 2024059980.301.55$926
Feb 2024041976.091.78$747
Jan 202409973.023.30$326
Dec 202308171.262.61$211
Nov 202306477.892.81$180
Oct 202305885.443.09$179
Sep 202307889.042.74$213
Aug 202306480.522.67$171
Jul 202306174.852.64$161
Jun 2023013168.962.26$296
May 2023026470.622.23$588
Apr 2023041378.122.24$924
Mar 2023036572.852.39$874
Feb 2023014875.112.47$365
Jan 2023016776.533.39$566
Dec 202203976.415.73$223
Nov 202203485.005.65$192
Oct 2022014087.185.86$821
Sep 2022024384.888.16$1,984
Aug 2022011894.529.13$1,077
Jul 20220116101.587.54$875
Jun 20220130115.097.98$1,037
May 20220288109.378.43$2,429
Apr 20220328104.226.84$2,243
Mar 20220203108.885.08$1,031
Feb 202205391.054.86$258
Jan 202201681.844.54$73
Dec 202104371.323.90$168
Nov 202101677.435.24$84
Oct 202109579.795.71$543
Sep 2021012069.865.35$642
Aug 2021022166.024.22$933
Jul 2021021770.783.98$864
Jun 2021019569.493.38$659
May 2021022963.483.02$691
Apr 2021016560.362.76$455
Mar 202109461.302.72$255
Feb 202101457.805.55$78
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200236.972.48$5
Sep 20200437.091.99$8
Aug 20200839.982.39$19
Jul 202001438.371.83$26
Jun 202004034.901.69$68
May 202002516.921.81$45
Apr 202001014.751.80$18
Mar 202002330.341.86$43
Feb 20200149.881.98$2
Jan 20200057.252.09$0
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190255.052.66$5
Aug 20190353.112.30$7
Jul 20190356.272.46$7
Jun 20190252.782.49$5
May 20190258.482.74$5
Apr 20190462.632.75$11
Mar 20190556.803.06$15
Feb 20190450.852.79$11
Jan 20190446.033.23$13
Dec 20180446.594.19$17
Nov 20180452.934.24$17
Oct 20180361.443.40$10
Sep 20180459.543.11$12
Aug 20180159.403.07$3
Jul 20180165.142.93$3
Jun 20180260.183.08$6
May 20180165.382.90$3
Apr 20180063.842.90$0
Mar 20180161.222.79$3
Feb 201802461.782.77$66
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170155.423.12$3
Oct 20170049.292.98$0
Sep 20170147.523.09$3
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170147.933.21$3
Mar 20170446.772.98$12
Feb 20170450.452.95$12
Jan 20170549.413.42$17
Dec 20160548.763.72$19
Nov 20160542.492.64$13
Oct 20160546.193.09$15
Sep 20160541.553.10$16
Aug 20160541.442.92$15
Jul 20160541.622.92$15
Jun 20160645.352.69$16
May 20160642.521.99$12
Apr 20160636.561.99$12
Mar 20160633.011.79$11
Feb 20160626.472.06$12
Jan 20160927.352.36$21
Dec 201501132.362.00$22
Nov 201501138.792.17$24
Oct 201501343.552.43$32
Sep 201501442.992.76$39
Aug 201504340.162.87$124
Jul 201506648.152.95$194
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 201512242.892.93$107
Feb 201515344.662.98$202
Jan 2015014743.433.10$456
Dec 2014010154.693.59$363
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140489.394.04$16
Jul 20140296.564.18$8
Jun 201402198.164.74$99
May 201404394.734.73$203
Apr 20140595.944.81$24
Mar 201411795.895.06$182
Feb 201404497.406.19$272
Jan 201414990.404.86$329
Dec 201315291.824.35$318
Nov 201305188.853.74$191
Oct 201315597.423.78$305
Sep 2013151104.113.72$294
Aug 2013158104.253.52$309
Jul 2013167102.523.72$352
Jun 201318094.403.93$409
May 201318794.834.15$456
Apr 201318793.964.28$467
Mar 2013310093.623.91$672
Feb 2013116291.233.42$645
Jan 201301791.603.42$58
Dec 2012010986.773.42$373
Nov 2012016786.953.62$605
Oct 201204689.383.40$156
Sep 2012011494.672.92$333
Aug 2012011492.662.91$332
Jul 2012012585.133.02$378
Jun 2012012479.822.52$312
May 2012011391.612.49$281
Apr 20120122101.652.00$244
Mar 20120131105.052.22$291
Feb 20120122101.102.57$314
Jan 2012014198.092.73$386
Dec 2011013996.873.24$450
Nov 2011014795.723.31$487
Oct 2011014684.983.65$533
Sep 2011014183.623.99$562
Aug 2011015683.404.15$647
Jul 2011017394.144.52$781
Jun 2011014692.904.64$677
May 2011015498.134.40$678
Apr 20110166105.964.33$719
Mar 2011016396.364.06$661
Feb 2011015585.644.18$648
Jan 2011018186.504.59$831
Dec 2010017885.734.35$774
Nov 2010017880.843.80$676
Oct 2010018978.103.51$663
Sep 2010018672.633.98$740
Aug 2010019773.684.42$871
Jul 2010020472.554.74$966
Jun 2010020570.364.91$1,007
May 2010022871.124.24$966
Apr 2010021981.694.12$903
Mar 2010011978.394.39$522
Feb 2010022873.585.44$1,241
Jan 2010025474.365.96$1,515
Dec 2009025271.445.48$1,382
Nov 2009033674.593.75$1,261
Oct 2009620472.544.11$1,274
Sep 20092021165.543.06$1,957
Aug 2009023467.423.22$753
Jul 2009023061.133.46$797
Jun 2009031066.163.90$1,207
May 2009043154.743.93$1,692
Apr 2009028546.773.59$1,022
Mar 200901,05642.144.06$4,286
Feb 200905632.814.63$259
Jan 200907735.865.37$414
Dec 2008059537.105.98$3,556
Nov 2008027255.496.86$1,866
Oct 200802975.246.92$201
Sep 2008033101.767.88$260
Aug 2008079114.228.48$670
Jul 20080375131.0811.39$4,271
Jun 20080252131.3313.03$3,284
May 2008044123.1711.57$509
Apr 2008063110.3110.45$659
Mar 20080106101.909.66$1,024
Feb 200804592.538.77$395
Jan 2008022290.388.21$1,822
Dec 2007047188.337.30$3,439
Nov 2007022491.677.29$1,633
Oct 2007033382.856.92$2,305
Sep 2007038675.846.24$2,410
Aug 2007045069.066.39$2,875
Jul 2007051870.906.39$3,309
Jun 2007069562.007.55$5,246
May 2007054658.747.85$4,284
Apr 2007019659.617.81$1,530
Mar 2007050856.927.30$3,709
Feb 2007051555.108.22$4,231
Jan 2007062050.306.73$4,171
Dec 2006057256.656.92$3,957
Nov 2006062254.207.62$4,738
Oct 2006060454.906.01$3,632
Sep 2006056560.085.04$2,846
Aug 2006056368.717.34$4,132
Jul 2006048769.376.34$3,089
Jun 2006080066.286.38$5,107
May 2006091366.016.42$5,866
Apr 200601,00264.397.36$7,375
Mar 200601,21156.707.08$8,577
Feb 200601,26157.597.75$9,774
Jan 200601,64860.598.93$14,722
Dec 200501,85954.9413.42$24,939
Nov 200502,20754.6910.59$23,369
Oct 200502,10458.3413.80$29,026

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    6 Mcf  × $  3.05 =        $18

────────────────────────────────────────────────────
Month total                                      $18

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/219343 is the state's own key, not one this site invented.