SHANNON 52

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219454District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$396 k
Feb 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-25169273
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition22 bbl$1,606
GasProduction61,318 Mcf$394,451
Total$396,057

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6670, -100.7900. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66705, -100.79002 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,065 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,065 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-43537779168,065 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 2026051106.413.05$155
Apr 202604098.932.87$115
Mar 202604889.753.15$151
Feb 202604463.503.75$165
Jan 202604959.138.00$392
Dec 202504956.664.41$216
Nov 202505158.593.93$200
Oct 202504959.383.30$162
Sep 202505062.743.08$154
Aug 202505163.933.01$154
Jul 202505166.743.32$169
Jun 202505166.483.13$160
May 202505160.553.23$165
Apr 202505062.363.54$177
Mar 202504967.704.27$209
Feb 202504570.884.34$195
Jan 202505274.324.28$222
Dec 202405368.993.12$165
Nov 202405269.052.20$114
Oct 202405571.372.28$125
Sep 202405269.612.36$123
Aug 202405475.632.06$111
Jul 202405479.932.15$116
Jun 202405278.082.63$137
May 202405478.812.20$119
Apr 202405184.451.66$85
Mar 202405180.301.55$79
Feb 202404976.091.78$87
Jan 202405273.023.30$171
Dec 202305371.262.61$138
Nov 202305177.892.81$143
Oct 202305585.443.09$170
Sep 202305589.042.74$150
Aug 202305680.522.67$150
Jul 202305674.852.64$148
Jun 202305568.962.26$124
May 202305670.622.23$125
Apr 202305578.122.24$123
Mar 202305672.852.39$134
Feb 202304875.112.47$118
Jan 202305476.533.39$183
Dec 202205376.415.73$304
Nov 202205385.005.65$299
Oct 202205487.185.86$317
Sep 202205484.888.16$441
Aug 202205594.529.13$502
Jul 2022056101.587.54$422
Jun 2022054115.097.98$431
May 2022052109.378.43$439
Apr 2022056104.226.84$383
Mar 2022056108.885.08$284
Feb 202204591.054.86$219
Jan 202205481.844.54$245
Dec 202106271.323.90$242
Nov 202105577.435.24$288
Oct 202105879.795.71$331
Sep 202105869.865.35$310
Aug 202106166.024.22$257
Jul 202106070.783.98$239
Jun 202106369.493.38$213
May 202105363.483.02$160
Apr 202104160.362.76$113
Mar 202113961.302.72$167
Feb 202102957.805.55$161
Jan 202103950.412.81$110
Dec 202004044.642.68$107
Nov 202004538.772.71$122
Oct 202004536.972.48$112
Sep 202004537.091.99$90
Aug 202004939.982.39$117
Jul 202005138.371.83$93
Jun 202004434.901.69$74
May 202004816.921.81$87
Apr 202004914.751.80$88
Mar 202004230.341.86$78
Feb 202003949.881.98$77
Jan 202004657.252.09$96
Dec 201904559.012.30$104
Nov 201904355.302.75$118
Oct 201905053.472.42$121
Sep 201905255.052.66$138
Aug 201905353.112.30$122
Jul 201905456.272.46$133
Jun 201905152.782.49$127
May 201905358.482.74$145
Apr 201905362.632.75$146
Mar 201904756.803.06$144
Feb 201904250.852.79$117
Jan 201904246.033.23$136
Dec 201804646.594.19$193
Nov 201804952.934.24$208
Oct 201807761.443.40$262
Sep 201807459.543.11$230
Aug 201807759.403.07$236
Jul 201807865.142.93$229
Jun 201807460.183.08$228
May 201807765.382.90$223
Apr 201807363.842.90$212
Mar 201807761.222.79$215
Feb 201806761.782.77$185
Jan 201807362.874.01$293
Dec 201707457.272.92$216
Nov 201707455.423.12$231
Oct 201707649.292.98$227
Sep 201707747.523.09$238
Aug 201707945.373.00$237
Jul 201708443.873.09$259
Jun 201706542.493.09$201
May 201706645.373.26$215
Apr 201707247.933.21$231
Mar 201706846.772.98$203
Feb 201716250.452.95$234
Jan 201706949.413.42$236
Dec 201606848.763.72$253
Nov 201606942.492.64$182
Oct 201607146.193.09$219
Sep 201606941.553.10$214
Aug 201607241.442.92$211
Jul 201617241.622.92$252
Jun 201617145.352.69$236
May 201607342.521.99$145
Apr 201607536.561.99$149
Mar 201607133.011.79$127
Feb 201606726.472.06$138
Jan 201607127.352.36$168
Dec 201506932.362.00$138
Nov 201506638.792.17$143
Oct 201507343.552.43$177
Sep 201507142.992.76$196
Aug 201507340.162.87$210
Jul 201506548.152.95$191
Jun 201506656.152.88$190
May 201507455.212.96$219
Apr 201507549.822.71$203
Mar 201508142.892.93$238
Feb 201507544.662.98$223
Jan 201508243.433.10$254
Dec 201407954.693.59$284
Nov 201407870.464.25$332
Oct 201408078.303.90$312
Sep 201407686.164.05$307
Aug 201407889.394.04$315
Jul 201407996.564.18$330
Jun 201407998.164.74$374
May 201407394.734.73$345
Apr 201407095.944.81$337
Mar 201406695.895.06$334
Feb 201407097.406.19$433
Jan 201407890.404.86$379
Dec 201307691.824.35$331
Nov 201306988.853.74$258
Oct 201307697.423.78$287
Sep 2013072104.113.72$268
Aug 2013076104.253.52$268
Jul 2013070102.523.72$260
Jun 201306694.403.93$260
May 201307394.834.15$303
Apr 201307193.964.28$304
Mar 201307193.623.91$278
Feb 201306791.233.42$229
Jan 201307491.603.42$253
Dec 201207586.773.42$257
Nov 201207086.953.62$254
Oct 201207389.383.40$248
Sep 201207294.672.92$210
Aug 201206292.662.91$180
Jul 2012010285.133.02$308
Jun 201209879.822.52$247
May 2012010491.612.49$259
Apr 2012095101.652.00$190
Mar 2012071105.052.22$158
Feb 2012051101.102.57$131
Jan 201205898.092.73$159
Dec 201105696.873.24$181
Nov 201105595.723.31$182
Oct 201105684.983.65$204
Sep 201105583.623.99$219
Aug 201105383.404.15$220
Jul 201105394.144.52$239
Jun 201105392.904.64$246
May 201105698.134.40$247
Apr 2011057105.964.33$247
Mar 2011010796.364.06$434
Feb 2011011685.644.18$485
Jan 2011013286.504.59$606
Dec 2010012985.734.35$561
Nov 2010013180.843.80$497
Oct 2010014078.103.51$491
Sep 2010014072.633.98$557
Aug 2010014973.684.42$658
Jul 2010017372.554.74$819
Jun 2010122170.364.91$1,156
May 2010043271.124.24$1,830
Apr 201006681.694.12$272
Mar 201006578.394.39$285
Feb 201006273.585.44$337
Jan 201007474.365.96$441
Dec 200907671.445.48$417
Nov 200907074.593.75$263
Oct 200906972.544.11$284
Sep 200907965.543.06$242
Aug 200906167.423.22$196
Jul 200908061.133.46$277
Jun 200909266.163.90$358
May 2009011754.743.93$459
Apr 2009011746.773.59$420
Mar 2009014642.144.06$593
Feb 2009015132.814.63$700
Jan 2009018635.865.37$999
Dec 2008124237.105.98$1,484
Nov 2008130655.496.86$2,155
Oct 2008144375.246.92$3,142
Sep 20080330101.767.88$2,599
Aug 20081583114.228.48$5,060
Jul 20080572131.0811.39$6,515
Jun 20081590131.3313.03$7,821
May 20081727123.1711.57$8,538
Apr 20082782110.3110.45$8,396
Mar 20081823101.909.66$8,055
Feb 2008068992.538.77$6,043
Jan 2008080290.388.21$6,581
Dec 2007082788.337.30$6,039
Nov 2007088691.677.29$6,460
Oct 2007087482.856.92$6,050
Sep 200701,22975.846.24$7,674
Aug 200701,38469.066.39$8,841
Jul 200701,30870.906.39$8,355
Jun 200721,18662.007.55$9,076
May 200741,14658.747.85$9,227
Apr 200721,18359.617.81$9,353
Mar 200701,13756.927.30$8,302
Feb 2007084255.108.22$6,918
Jan 200701,05950.306.73$7,124
Dec 200601,13556.656.92$7,852
Nov 200601,29954.207.62$9,895
Oct 200601,46254.906.01$8,792
Sep 200601,66460.085.04$8,382
Aug 200601,70168.717.34$12,485
Jul 200602,43669.376.34$15,451
Jun 200602,82766.286.38$18,047
May 200603,38566.016.42$21,749
Apr 200603,28064.397.36$24,142
Mar 200604,00456.707.08$28,360
Feb 200603,67757.597.75$28,501

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   51 Mcf  × $  3.05 =       $155

────────────────────────────────────────────────────
Month total                                     $155

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/219454 is the state's own key, not one this site invented.