Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221131District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
May 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-08-14193765
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition20,338 bbl$1,516,367
GasProduction67,959 Mcf$358,407
Total$1,874,775

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6310, -100.7373. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63098, -100.73727 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,186 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,186 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-435378571038,186 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 2026691106.413.05$916
Apr 202601398.932.87$37
Mar 20260889.753.15$25
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250262.743.08$6
Aug 20250263.933.01$6
Jul 20250366.743.32$10
Jun 20250366.483.13$9
May 202501360.553.23$42
Apr 20250962.363.54$32
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240271.372.28$5
Sep 20240869.612.36$19
Aug 20240775.632.06$14
Jul 20240779.932.15$15
Jun 20240878.082.63$21
May 202401178.812.20$24
Apr 202402084.451.66$33
Mar 202401580.301.55$23
Feb 202401976.091.78$34
Jan 202401173.023.30$36
Dec 20230671.262.61$16
Nov 20230477.892.81$11
Oct 20230385.443.09$9
Sep 202303789.042.74$101
Aug 20230580.522.67$13
Jul 202301074.852.64$26
Jun 202301368.962.26$29
May 202301570.622.23$33
Apr 202302278.122.24$49
Mar 202302572.852.39$60
Feb 202302075.112.47$49
Jan 202302576.533.39$85
Dec 202202676.415.73$149
Nov 202202585.005.65$141
Oct 202201687.185.86$94
Sep 202201084.888.16$82
Aug 20220494.529.13$37
Jul 202200101.587.54$0
Jun 202240115.097.98$460
May 20221871109.378.43$20,461
Apr 202201104.226.84$7
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220181.844.54$5
Dec 202106771.323.90$261
Nov 2021012777.435.24$665
Oct 2021013679.795.71$777
Sep 202109269.865.35$492
Aug 20211551366.024.22$10,288
Jul 2021020470.783.98$812
Jun 2021014869.493.38$500
May 202101963.483.02$57
Apr 2021016060.362.76$441
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200038.772.71$0
Oct 20200836.972.48$20
Sep 20201695437.091.99$6,376
Aug 2020161739.982.39$680
Jul 2020014438.371.83$263
Jun 2020011334.901.69$191
May 2020014216.921.81$258
Apr 202015822314.751.80$2,733
Mar 2020014630.341.86$271
Feb 20200049.881.98$0
Jan 2020156157.252.09$8,933
Dec 20190559.012.30$12
Nov 20190055.302.75$0
Oct 201901253.472.42$29
Sep 20190755.052.66$19
Aug 20190753.112.30$16
Jul 2019011756.272.46$288
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201903456.803.06$104
Feb 20190050.852.79$0
Jan 201902346.033.23$74
Dec 201805746.594.19$239
Nov 201801552.934.24$64
Oct 201811261.443.40$102
Sep 20180759.543.11$22
Aug 20181594059.403.07$9,567
Jul 20186165.142.93$394
Jun 20182160.183.08$123
May 201844965.382.90$404
Apr 201816463.842.90$249
Mar 20181726861.222.79$10,719
Feb 20181212261.782.77$1,079
Jan 2018414062.874.01$813
Dec 201716710957.272.92$9,883
Nov 201709855.423.12$306
Oct 2017216849.292.98$600
Sep 2017114947.523.09$508
Aug 201717411145.373.00$8,228
Jul 2017510443.873.09$540
Jun 201717112042.493.09$7,636
May 201719316645.373.26$9,298
Apr 20171555047.933.21$2,485
Mar 2017071746.772.98$2,139
Feb 2017011250.452.95$331
Jan 201704349.413.42$147
Dec 201603848.763.72$141
Nov 201603842.492.64$100
Oct 201603746.193.09$114
Sep 201603441.553.10$105
Aug 201603541.442.92$102
Jul 201603741.622.92$108
Jun 201604745.352.69$126
May 201604642.521.99$92
Apr 201614336.561.99$122
Mar 201603833.011.79$68
Feb 201603726.472.06$76
Jan 201604127.352.36$97
Dec 201504032.362.00$80
Nov 201502038.792.17$43
Oct 201502843.552.43$68
Sep 201506542.992.76$179
Aug 201504040.162.87$115
Jul 201503948.152.95$115
Jun 201505156.152.88$147
May 201505555.212.96$163
Apr 201507049.822.71$189
Mar 201508242.892.93$241
Feb 201506544.662.98$193
Jan 201508143.433.10$251
Dec 2014011954.693.59$427
Nov 201406270.464.25$264
Oct 201419010578.303.90$15,287
Sep 2014012686.164.05$510
Aug 2014016089.394.04$646
Jul 201405896.564.18$242
Jun 201404398.164.74$204
May 201401694.734.73$76
Apr 20141325695.944.81$2,478
Mar 2014025695.895.06$1,295
Feb 20141596897.406.19$15,908
Jan 201405390.404.86$258
Dec 201305991.824.35$257
Nov 201303788.853.74$138
Oct 20130397.423.78$11
Sep 2013066104.113.72$245
Aug 201318242104.253.52$2,729
Jul 20136408102.523.72$2,132
Jun 20131241294.403.93$2,753
May 20131058094.834.15$3,355
Apr 201316968593.964.28$18,813
Mar 201323665493.623.91$24,653
Feb 20131060491.233.42$2,978
Jan 201322065991.603.42$22,406
Dec 2012859086.773.42$2,712
Nov 20121749486.953.62$3,269
Oct 20122773089.383.40$4,895
Sep 201236064394.672.92$35,958
Aug 2012814492.662.91$1,160
Jul 201220113185.133.02$17,507
Jun 20122617679.822.52$2,519
May 20122004491.612.49$18,431
Apr 201215582101.652.00$2,687
Mar 2012202751105.052.22$22,889
Feb 20120726101.102.57$1,866
Jan 20126880598.092.73$8,871
Dec 20113179996.873.24$5,592
Nov 201125773395.723.31$27,027
Oct 20112770484.983.65$4,863
Sep 201122164183.623.99$21,035
Aug 2011064083.404.15$2,656
Jul 201136289994.144.52$38,140
Jun 201120415892.904.64$19,685
May 2011014198.134.40$621
Apr 20116490105.964.33$2,759
Mar 20115156596.364.06$7,207
Feb 201122942585.644.18$21,388
Jan 20118653886.504.59$9,908
Dec 20103379585.734.35$6,286
Nov 201020589380.843.80$19,961
Oct 201025067978.103.51$21,908
Sep 201016084672.633.98$14,987
Aug 20104691473.684.42$7,429
Jul 201039891772.554.74$33,218
Jun 201016672970.364.91$15,259
May 20106554971.124.24$6,948
Apr 201021344481.694.12$19,230
Mar 201052966378.394.39$44,378
Feb 20104243173.585.44$5,436
Jan 201007374.365.96$435
Dec 2009014971.445.48$817
Nov 200916256474.593.75$14,199
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20093546967.423.22$3,869
Jul 200916633561.133.46$11,308
Jun 200917051866.163.90$13,265
May 2009039054.743.93$1,531
Apr 200917947446.773.59$10,072
Mar 200912050542.144.06$7,107
Feb 200931232232.814.63$11,729
Jan 2009054735.865.37$2,938
Dec 2008048937.105.98$2,923
Nov 200818950555.496.86$13,952
Oct 200834149275.246.92$29,062
Sep 2008397491101.767.88$44,266
Aug 2008175387114.228.48$23,271
Jul 2008161653131.0811.39$28,541
Jun 2008171323131.3313.03$26,667
May 2008522530123.1711.57$70,429
Apr 2008163653110.3110.45$24,808
Mar 2008194319101.909.66$22,851
Feb 200829650492.538.77$31,809
Jan 200819063190.388.21$22,350
Dec 200717054888.337.30$19,018
Nov 200717862891.677.29$20,896
Oct 2007038382.856.92$2,651
Sep 2007069475.846.24$4,333
Aug 2007039169.066.39$2,498
Jul 200714175970.906.39$14,845
Jun 200718745162.007.55$14,998
May 2007048058.747.85$3,766
Apr 2007088159.617.81$6,876
Mar 2007053456.927.30$3,899
Feb 200718991455.108.22$17,923
Jan 200719590250.306.73$15,876
Dec 20065521,16356.656.92$39,317
Nov 20063851,63554.207.62$33,322
Oct 20066911,88754.906.01$49,284
Sep 20064462,18660.085.04$37,807
Aug 20061,5312,53668.717.34$123,809
Jul 20061,5632,57869.376.34$124,777
Jun 20061,5953,21866.286.38$126,260
May 20068752,05466.016.42$70,956

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             6 bbl  × $106.41 =       $638
Gas                   91 Mcf  × $  3.05 =       $277

────────────────────────────────────────────────────
Month total                                     $916

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/221131 is the state's own key, not one this site invented.