WILSON, DUKE

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222219District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$655 k
May 2006 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07171347
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition15 bbl$942
GasProduction126,357 Mcf$653,809
Total$654,751

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3614, -100.7658. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.36144, -100.76581 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,001 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,001 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-4353789917849,001 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 20260185106.413.05$563
Apr 2026118998.932.87$641
Mar 2026024389.753.15$765
Feb 20261363.503.75$75
Jan 2026014459.138.00$1,152
Dec 2025116456.664.41$780
Nov 2025016258.593.93$636
Oct 2025116959.383.30$618
Sep 2025016662.743.08$511
Aug 2025117063.933.01$576
Jul 2025017266.743.32$570
Jun 2025016766.483.13$523
May 2025017760.553.23$572
Apr 2025117162.363.54$668
Mar 2025017867.704.27$760
Feb 2025016370.884.34$708
Jan 2025019274.324.28$822
Dec 2024019768.993.12$615
Nov 2024019769.052.20$433
Oct 2024018671.372.28$424
Sep 2024116669.612.36$462
Aug 2024017675.632.06$363
Jul 2024118079.932.15$466
Jun 2024018178.082.63$477
May 2024019878.812.20$435
Apr 2024233184.451.66$718
Mar 2024030480.301.55$470
Feb 202406376.091.78$112
Jan 20240073.023.30$0
Dec 202301071.262.61$26
Nov 202308177.892.81$227
Oct 2023014685.443.09$451
Sep 2023011089.042.74$301
Aug 2023013180.522.67$350
Jul 2023011574.852.64$304
Jun 2023016468.962.26$370
May 2023016770.622.23$372
Apr 2023015878.122.24$354
Mar 2023016472.852.39$392
Feb 2023017375.112.47$427
Jan 2023013276.533.39$447
Dec 2022017876.415.73$1,020
Nov 2022017385.005.65$977
Oct 2022019287.185.86$1,126
Sep 2022018884.888.16$1,535
Aug 2022018994.529.13$1,725
Jul 20220176101.587.54$1,327
Jun 20220172115.097.98$1,372
May 20220180109.378.43$1,518
Apr 20220183104.226.84$1,251
Mar 20220196108.885.08$995
Feb 2022018491.054.86$894
Jan 2022022381.844.54$1,012
Dec 2021027971.323.90$1,088
Nov 202109677.435.24$503
Oct 2021022379.795.71$1,274
Sep 2021021569.865.35$1,150
Aug 2021023166.024.22$975
Jul 2021021470.783.98$852
Jun 2021024469.493.38$825
May 2021025963.483.02$782
Apr 2021021460.362.76$590
Mar 2021023961.302.72$649
Feb 2021022657.805.55$1,254
Jan 2021023750.412.81$666
Dec 2020022944.642.68$613
Nov 2020023438.772.71$633
Oct 2020023636.972.48$585
Sep 2020023337.091.99$464
Aug 2020024039.982.39$572
Jul 2020025838.371.83$471
Jun 2020023634.901.69$399
May 2020030816.921.81$559
Apr 2020017014.751.80$307
Mar 2020020530.341.86$381
Feb 2020023249.881.98$460
Jan 2020023857.252.09$499
Dec 2019027359.012.30$629
Nov 2019022855.302.75$627
Oct 2019026253.472.42$634
Sep 2019028555.052.66$757
Aug 2019034653.112.30$797
Jul 2019035456.272.46$871
Jun 2019028952.782.49$720
May 2019030658.482.74$839
Apr 2019032362.632.75$888
Mar 2019048956.803.06$1,497
Feb 2019036650.852.79$1,022
Jan 2019027446.033.23$885
Dec 2018020846.594.19$871
Nov 2018024252.934.24$1,025
Oct 2018031061.443.40$1,053
Sep 2018031959.543.11$991
Aug 2018034959.403.07$1,070
Jul 2018035765.142.93$1,047
Jun 2018034560.183.08$1,062
May 2018035065.382.90$1,015
Apr 2018032263.842.90$934
Mar 2018040661.222.79$1,131
Feb 2018026661.782.77$736
Jan 2018033762.874.01$1,351
Dec 2017034557.272.92$1,008
Nov 2017034355.423.12$1,070
Oct 2017033349.292.98$994
Sep 2017031447.523.09$969
Aug 2017133145.373.00$1,040
Jul 2017035943.873.09$1,108
Jun 2017035342.493.09$1,090
May 2017033545.373.26$1,093
Apr 2017033547.933.21$1,076
Mar 2017135946.772.98$1,118
Feb 2017134550.452.95$1,069
Jan 2017044149.413.42$1,508
Dec 2016039848.763.72$1,482
Nov 2016040042.492.64$1,058
Oct 2016038846.193.09$1,199
Sep 2016039041.553.10$1,209
Aug 2016042241.442.92$1,234
Jul 2016047541.622.92$1,389
Jun 2016049045.352.69$1,316
May 2016052442.521.99$1,043
Apr 2016051536.561.99$1,025
Mar 2016153633.011.79$995
Feb 2016055826.472.06$1,152
Jan 2016058727.352.36$1,388
Dec 2015054732.362.00$1,095
Nov 2015035838.792.17$776
Oct 2015039643.552.43$961
Sep 2015137942.992.76$1,088
Aug 2015040740.162.87$1,169
Jul 2015040048.152.95$1,178
Jun 2015039456.152.88$1,136
May 2015042955.212.96$1,268
Apr 2015041549.822.71$1,123
Mar 2015045442.892.93$1,332
Feb 2015034444.662.98$1,024
Jan 2015049143.433.10$1,522
Dec 2014038054.693.59$1,365
Nov 2014041270.464.25$1,752
Oct 2014046378.303.90$1,806
Sep 2014047186.164.05$1,905
Aug 2014047689.394.04$1,921
Jul 2014040096.564.18$1,672
Jun 2014018698.164.74$881
May 2014040694.734.73$1,919
Apr 2014042895.944.81$2,058
Mar 2014046195.895.06$2,331
Feb 2014043997.406.19$2,718
Jan 2014053990.404.86$2,620
Dec 2013049091.824.35$2,134
Nov 2013033988.853.74$1,267
Oct 2013046097.423.78$1,739
Sep 20130232104.113.72$863
Aug 20130489104.253.52$1,723
Jul 20130541102.523.72$2,011
Jun 2013041594.403.93$1,632
May 2013049594.834.15$2,054
Apr 2013057293.964.28$2,450
Mar 2013054893.623.91$2,144
Feb 2013046991.233.42$1,604
Jan 2013055391.603.42$1,891
Dec 2012059686.773.42$2,038
Nov 2012061386.953.62$2,222
Oct 2012060789.383.40$2,064
Sep 2012057994.672.92$1,690
Aug 2012059692.662.91$1,733
Jul 2012063385.133.02$1,912
Jun 2012062979.822.52$1,584
May 2012039691.612.49$985
Apr 20120174101.652.00$347
Mar 20120234105.052.22$520
Feb 20120250101.102.57$643
Jan 2012032398.092.73$883
Dec 2011034896.873.24$1,127
Nov 2011034795.723.31$1,149
Oct 2011028084.983.65$1,022
Sep 2011028783.623.99$1,144
Aug 2011027083.404.15$1,120
Jul 2011026394.144.52$1,188
Jun 2011025192.904.64$1,165
May 2011031598.134.40$1,388
Apr 20110260105.964.33$1,127
Mar 2011033396.364.06$1,351
Feb 2011031785.644.18$1,325
Jan 2011051386.504.59$2,354
Dec 2010046085.734.35$2,000
Nov 2010041080.843.80$1,556
Oct 2010042278.103.51$1,481
Sep 2010034572.633.98$1,373
Aug 2010040773.684.42$1,799
Jul 2010042072.554.74$1,989
Jun 2010057270.364.91$2,809
May 2010049271.124.24$2,084
Apr 2010059981.694.12$2,469
Mar 2010076278.394.39$3,344
Feb 2010084173.585.44$4,577
Jan 2010093174.365.96$5,553
Dec 200901,01171.445.48$5,544
Nov 2009091674.593.75$3,436
Oct 2009082772.544.11$3,399
Sep 2009084365.543.06$2,584
Aug 2009069967.423.22$2,250
Jul 2009092461.133.46$3,201
Jun 2009079866.163.90$3,108
May 2009088854.743.93$3,486
Apr 2009089846.773.59$3,222
Mar 200901,24942.144.06$5,070
Feb 2009095032.814.63$4,401
Jan 200901,17835.865.37$6,327
Dec 200801,13337.105.98$6,772
Nov 200801,06155.496.86$7,279
Oct 200801,07875.246.92$7,462
Sep 20080889101.767.88$7,003
Aug 20080836114.228.48$7,092
Jul 20080894131.0811.39$10,182
Jun 20080915131.3313.03$11,925
May 200801,104123.1711.57$12,778
Apr 200801,352110.3110.45$14,135
Mar 200801,555101.909.66$15,028
Feb 200801,52792.538.77$13,393
Jan 200801,68790.388.21$13,843
Dec 200701,72288.337.30$12,574
Nov 200701,66891.677.29$12,163
Oct 200701,71482.856.92$11,864
Sep 200701,66975.846.24$10,422
Aug 200701,79769.066.39$11,479
Jul 200701,84270.906.39$11,767
Jun 200701,68962.007.55$12,749
May 200701,84258.747.85$14,453
Apr 200701,78959.617.81$13,964
Mar 200701,88056.927.30$13,728
Feb 200701,72455.108.22$14,164
Jan 200701,85950.306.73$12,505
Dec 200602,05156.656.92$14,190
Nov 200601,95954.207.62$14,923
Oct 200602,11154.906.01$12,695
Sep 200601,38160.085.04$6,956
Aug 200601,60768.717.34$11,795
Jul 200601,57469.376.34$9,984
Jun 200602,47566.286.38$15,800
May 200603,28266.016.42$21,087

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  185 Mcf  × $  3.05 =       $563

────────────────────────────────────────────────────
Month total                                     $563

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/222219 is the state's own key, not one this site invented.