WILSON, DUKE

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222235District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07171346
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9 bbl$627
GasProduction229,850 Mcf$1,349,978
Total$1,350,606

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4258, -100.7630. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42579, -100.76298 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,216 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,216 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-4353790217459,216 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250274.324.28$9
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 2020012530.341.86$232
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 2019045852.782.49$1,141
May 201904158.482.74$112
Apr 2019012862.632.75$352
Mar 201904756.803.06$144
Feb 2019037950.852.79$1,058
Jan 2019042546.033.23$1,372
Dec 2018043246.594.19$1,808
Nov 2018042352.934.24$1,792
Oct 2018044961.443.40$1,526
Sep 2018043359.543.11$1,346
Aug 2018039459.403.07$1,208
Jul 2018041165.142.93$1,205
Jun 2018041860.183.08$1,286
May 2018047165.382.90$1,366
Apr 2018052063.842.90$1,508
Mar 2018047961.222.79$1,335
Feb 2018048261.782.77$1,333
Jan 201804662.874.01$184
Dec 20170057.272.92$0
Nov 20170355.423.12$9
Oct 20170449.292.98$12
Sep 2017024047.523.09$741
Aug 2017131445.373.00$989
Jul 2017037243.873.09$1,148
Jun 2017045642.493.09$1,408
May 2017047545.373.26$1,550
Apr 2017048447.933.21$1,554
Mar 2017152946.772.98$1,625
Feb 2017152750.452.95$1,606
Jan 2017066349.413.42$2,267
Dec 2016033848.763.72$1,258
Nov 2016018842.492.64$497
Oct 2016016346.193.09$504
Sep 2016012641.553.10$391
Aug 201607341.442.92$213
Jul 201606441.622.92$187
Jun 201605945.352.69$158
May 201609542.521.99$189
Apr 2016019336.561.99$384
Mar 2016141933.011.79$785
Feb 2016042226.472.06$871
Jan 2016051127.352.36$1,208
Dec 2015052732.362.00$1,055
Nov 2015052238.792.17$1,131
Oct 2015060843.552.43$1,475
Sep 2015161242.992.76$1,731
Aug 2015065240.162.87$1,873
Jul 2015066248.152.95$1,950
Jun 2015062756.152.88$1,808
May 2015066255.212.96$1,957
Apr 2015065049.822.71$1,759
Mar 2015065642.892.93$1,925
Feb 2015046144.662.98$1,372
Jan 2015029243.433.10$905
Dec 2014055954.693.59$2,008
Nov 2014062070.464.25$2,636
Oct 2014063378.303.90$2,469
Sep 2014060486.164.05$2,443
Aug 2014061789.394.04$2,490
Jul 2014133196.564.18$1,480
Jun 2014059398.164.74$2,809
May 2014059294.734.73$2,798
Apr 2014055895.944.81$2,683
Mar 2014057295.895.06$2,892
Feb 2014051197.406.19$3,164
Jan 2014054490.404.86$2,644
Dec 2013054191.824.35$2,356
Nov 2013051688.853.74$1,929
Oct 2013038197.423.78$1,440
Sep 20133410104.113.72$1,837
Aug 20130448104.253.52$1,578
Jul 20130473102.523.72$1,758
Jun 2013047194.403.93$1,853
May 2013053994.834.15$2,236
Apr 2013055793.964.28$2,385
Mar 201301,09293.623.91$4,273
Feb 2013096391.233.42$3,293
Jan 2013098691.603.42$3,372
Dec 2012099386.773.42$3,396
Nov 2012098186.953.62$3,556
Oct 201201,01489.383.40$3,447
Sep 2012094094.672.92$2,743
Aug 2012095692.662.91$2,780
Jul 2012099485.133.02$3,003
Jun 2012097179.822.52$2,446
May 201201,02391.612.49$2,546
Apr 20120989101.652.00$1,975
Mar 201201,012105.052.22$2,249
Feb 20120960101.102.57$2,467
Jan 201201,03798.092.73$2,835
Dec 201101,04596.873.24$3,386
Nov 2011072095.723.31$2,384
Oct 201101,00884.983.65$3,678
Sep 2011097583.623.99$3,886
Aug 2011098683.404.15$4,091
Jul 2011099294.144.52$4,481
Jun 2011095392.904.64$4,422
May 201101,00698.134.40$4,431
Apr 20110981105.964.33$4,251
Mar 201101,04696.364.06$4,244
Feb 2011087685.644.18$3,662
Jan 201101,02986.504.59$4,722
Dec 201001,03285.734.35$4,487
Nov 201001,01080.843.80$3,833
Oct 201001,03478.103.51$3,628
Sep 2010098972.633.98$3,936
Aug 201001,04773.684.42$4,627
Jul 201001,11872.554.74$5,295
Jun 2010021270.364.91$1,041
May 2010021471.124.24$906
Apr 2010077981.694.12$3,212
Mar 2010054878.394.39$2,405
Feb 2010074073.585.44$4,027
Jan 2010096074.365.96$5,726
Dec 2009090671.445.48$4,968
Nov 2009088374.593.75$3,313
Oct 200901,03672.544.11$4,258
Sep 200901,03565.543.06$3,172
Aug 200901,01067.423.22$3,251
Jul 200901,14861.133.46$3,977
Jun 200901,11966.163.90$4,359
May 200901,21154.743.93$4,754
Apr 200901,04946.773.59$3,763
Mar 200901,26442.144.06$5,131
Feb 200901,27032.814.63$5,884
Jan 200901,45235.865.37$7,799
Dec 200801,67737.105.98$10,024
Nov 200801,75555.496.86$12,040
Oct 200801,81775.246.92$12,577
Sep 200801,943101.767.88$15,305
Aug 200802,063114.228.48$17,500
Jul 200802,314131.0811.39$26,355
Jun 200802,465131.3313.03$32,125
May 200802,168123.1711.57$25,093
Apr 200801,004110.3110.45$10,497
Mar 200801,318101.909.66$12,737
Feb 200801,41792.538.77$12,428
Jan 200801,76990.388.21$14,516
Dec 200702,14288.337.30$15,641
Nov 200702,43091.677.29$17,719
Oct 200702,48082.856.92$17,167
Sep 200702,58275.846.24$16,122
Aug 200702,99269.066.39$19,113
Jul 200703,29470.906.39$21,042
Jun 200702,80662.007.55$21,181
May 200704,07858.747.85$31,997
Apr 200703,39559.617.81$26,499
Mar 200704,54856.927.30$33,209
Feb 200704,47755.108.22$36,783
Jan 200705,87950.306.73$39,547
Dec 200606,78256.656.92$46,921
Nov 200607,73154.207.62$58,891
Oct 200609,97154.906.01$59,964
Sep 2006011,62060.085.04$58,532
Aug 2006014,49368.717.34$106,377
Jul 2006019,40069.376.34$123,050
Jun 2006016,16166.286.38$103,170

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 74.32 =         $0
Gas                    2 Mcf  × $  4.28 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/222235 is the state's own key, not one this site invented.