MAYFIELD 40

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223584District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$665 k
Jun 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-02-16172874
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition86 bbl$6,140
GasProduction116,956 Mcf$659,141
Total$665,281

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5602, -100.7989. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56015, -100.79894 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,892 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,892 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-43537480207,892 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 2026037106.413.05$113
Apr 202602498.932.87$69
Mar 202604089.753.15$126
Feb 202603663.503.75$135
Jan 202604459.138.00$352
Dec 202504656.664.41$203
Nov 202504958.593.93$192
Oct 202504959.383.30$162
Sep 20250062.743.08$0
Aug 202504863.933.01$145
Jul 2025010366.743.32$341
Jun 202509966.483.13$310
May 202509860.553.23$317
Apr 202509362.363.54$330
Mar 202509067.704.27$384
Feb 202507370.884.34$317
Jan 202507374.324.28$312
Dec 202407768.993.12$240
Nov 202407769.052.20$169
Oct 202408671.372.28$196
Sep 202408669.612.36$203
Aug 202409275.632.06$190
Jul 202409179.932.15$195
Jun 202408778.082.63$229
May 202408378.812.20$182
Apr 202407584.451.66$124
Mar 202407280.301.55$111
Feb 202406776.091.78$120
Jan 202406073.023.30$198
Dec 202306071.262.61$157
Nov 202307577.892.81$211
Oct 202308885.443.09$272
Sep 202309189.042.74$249
Aug 202309780.522.67$259
Jul 202309374.852.64$246
Jun 202309068.962.26$203
May 202308970.622.23$198
Apr 202308278.122.24$184
Mar 202308472.852.39$201
Feb 202307575.112.47$185
Jan 202307876.533.39$264
Dec 202207676.415.73$435
Nov 202207485.005.65$418
Oct 202208487.185.86$493
Sep 202208784.888.16$710
Aug 202208494.529.13$767
Jul 2022095101.587.54$717
Jun 2022090115.097.98$718
May 2022093109.378.43$784
Apr 2022084104.226.84$574
Mar 2022082108.885.08$416
Feb 202206891.054.86$330
Jan 202207581.844.54$340
Dec 202108271.323.90$320
Nov 202108977.435.24$466
Oct 202109879.795.71$560
Sep 202109869.865.35$524
Aug 2021010066.024.22$422
Jul 2021010170.783.98$402
Jun 202109769.493.38$328
May 202109663.483.02$290
Apr 202108960.362.76$246
Mar 202109361.302.72$253
Feb 202103257.805.55$178
Jan 202108750.412.81$244
Dec 202009044.642.68$241
Nov 202009138.772.71$246
Oct 2020010036.972.48$248
Sep 2020010037.091.99$199
Aug 2020011139.982.39$265
Jul 2020010738.371.83$195
Jun 2020010334.901.69$174
May 2020010216.921.81$185
Apr 202009714.751.80$175
Mar 202008630.341.86$160
Feb 202008449.881.98$166
Jan 202009357.252.09$195
Dec 201909159.012.30$210
Nov 201908955.302.75$245
Oct 2019010353.472.42$249
Sep 2019013655.052.66$361
Aug 201909953.112.30$228
Jul 2019010656.272.46$261
Jun 2019010052.782.49$249
May 201904858.482.74$132
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 201706557.272.92$190
Nov 201707055.423.12$218
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170145.373.00$3
Jul 20170043.873.09$0
Jun 20170142.493.09$3
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 20160148.763.72$4
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 201601741.553.10$53
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 201508438.792.17$182
Oct 2015022343.552.43$541
Sep 2015020942.992.76$577
Aug 2015021040.162.87$603
Jul 2015122248.152.95$702
Jun 2015022456.152.88$646
May 2015022655.212.96$668
Apr 2015121949.822.71$643
Mar 2015022242.892.93$652
Feb 2015020144.662.98$598
Jan 2015123243.433.10$763
Dec 2014024654.693.59$883
Nov 2014116270.464.25$759
Oct 2014026078.303.90$1,014
Sep 2014025786.164.05$1,040
Aug 2014027489.394.04$1,106
Jul 2014128196.564.18$1,271
Jun 2014027598.164.74$1,303
May 2014028794.734.73$1,357
Apr 2014027795.944.81$1,332
Mar 2014134695.895.06$1,846
Feb 2014026397.406.19$1,629
Jan 2014127890.404.86$1,442
Dec 2013025491.824.35$1,106
Nov 2013015688.853.74$583
Oct 2013011097.423.78$416
Sep 20130178104.113.72$662
Aug 20130178104.253.52$627
Jul 20130175102.523.72$651
Jun 2013015294.403.93$598
May 2013021794.834.15$900
Apr 2013021093.964.28$899
Mar 2013022893.623.91$892
Feb 2013012591.233.42$427
Jan 2013119891.603.42$769
Dec 2012063486.773.42$2,168
Nov 2012069186.953.62$2,505
Oct 2012271989.383.40$2,623
Sep 2012079894.672.92$2,329
Aug 2012051192.662.91$1,486
Jul 2012066385.133.02$2,003
Jun 2012085079.822.52$2,141
May 2012090791.612.49$2,257
Apr 20120915101.652.00$1,827
Mar 20122943105.052.22$2,306
Feb 20122892101.102.57$2,495
Jan 2012095298.092.73$2,603
Dec 2011296196.873.24$3,307
Nov 2011294395.723.31$3,314
Oct 201101,14784.983.65$4,185
Sep 2011052883.623.99$2,105
Aug 2011077583.404.15$3,216
Jul 2011097794.144.52$4,413
Jun 2011091692.904.64$4,250
May 2011292898.134.40$4,284
Apr 20110903105.964.33$3,913
Mar 201101,04196.364.06$4,224
Feb 2011292085.644.18$4,017
Jan 2011098686.504.59$4,525
Dec 2010097285.734.35$4,226
Nov 2010094580.843.80$3,587
Oct 2010182478.103.51$2,969
Sep 2010077672.633.98$3,088
Aug 2010076273.684.42$3,368
Jul 2010183172.554.74$4,009
Jun 2010080770.364.91$3,963
May 2010085671.124.24$3,625
Apr 2010080581.694.12$3,319
Mar 2010185878.394.39$3,844
Feb 2010382873.585.44$4,727
Jan 2010291174.365.96$5,582
Dec 2009187671.445.48$4,875
Nov 2009289774.593.75$3,514
Oct 2009394072.544.11$4,081
Sep 2009093765.543.06$2,872
Aug 200911,04267.423.22$3,421
Jul 2009097561.133.46$3,378
Jun 2009195766.163.90$3,794
May 200901,06554.743.93$4,181
Apr 200911,07246.773.59$3,893
Mar 200931,02042.144.06$4,267
Feb 2009189932.814.63$4,198
Jan 200911,06035.865.37$5,729
Dec 200811,09337.105.98$6,570
Nov 200821,11755.496.86$7,774
Oct 200801,14975.246.92$7,953
Sep 200801,113101.767.88$8,767
Aug 200801,180114.228.48$10,010
Jul 200811,154131.0811.39$13,274
Jun 200801,131131.3313.03$14,740
May 200801,166123.1711.57$13,496
Apr 200811,136110.3110.45$11,987
Mar 200801,225101.909.66$11,838
Feb 200821,35592.538.77$12,069
Jan 200821,48590.388.21$12,366
Dec 200721,52688.337.30$11,319
Nov 200701,53691.677.29$11,200
Oct 200721,64882.856.92$11,573
Sep 200701,72175.846.24$10,746
Aug 200701,76169.066.39$11,249
Jul 200721,85970.906.39$12,017
Jun 200701,81962.007.55$13,731
May 200721,97558.747.85$15,614
Apr 200702,02859.617.81$15,829
Mar 200722,15056.927.30$15,813
Feb 200722,08855.108.22$17,265
Jan 200742,42450.306.73$16,507
Dec 200622,69556.656.92$18,759
Nov 200642,76054.207.62$21,241
Oct 200633,11054.906.01$18,868
Sep 200633,30660.085.04$16,833
Aug 200603,72968.717.34$27,371
Jul 200634,07569.376.34$26,055
Jun 200623,26466.286.38$20,970

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   37 Mcf  × $  3.05 =       $113

────────────────────────────────────────────────────
Month total                                     $113

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/223584 is the state's own key, not one this site invented.