BROWN SW "212"

Operated by BRP ENERGY, LLC (P-5 41519) in the GEASLIN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224885District 7CField 34300700CondensateGasSaveExport
Value, all time
$144 k
Dec 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
234
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 169 wells, and the rule below applies to all of them.

Discovered
1995-05-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-07-24.

The Commission's schedule remark for this field reads: 8000FT AS SHOWN ON THE LOG OF THE GEASLIN 198 LEASE, WELL NO. 1.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10 bbl$550
GasProduction22,848 Mcf$143,557
Total$144,106

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3422, -101.8644. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.34225, -101.86441 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,288 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,288 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-44331152467,288 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202001739.982.39$41
Jul 202003338.371.83$60
Jun 202002534.901.69$42
May 202002216.921.81$40
Apr 202002414.751.80$43
Mar 202002630.341.86$48
Feb 20200949.881.98$18
Jan 20200257.252.09$4
Dec 201903159.012.30$71
Nov 201902655.302.75$72
Oct 201902553.472.42$60
Sep 201903155.052.66$82
Aug 201902253.112.30$51
Jul 201932956.272.46$240
Jun 201904252.782.49$105
May 201903858.482.74$104
Apr 201904162.632.75$113
Mar 201901356.803.06$40
Feb 201903250.852.79$89
Jan 201904146.033.23$132
Dec 201802446.594.19$100
Nov 201802152.934.24$89
Oct 201804761.443.40$160
Sep 201803059.543.11$93
Aug 201801159.403.07$34
Jul 201803265.142.93$94
Jun 201802860.183.08$86
May 201802465.382.90$70
Apr 201801863.842.90$52
Mar 201801761.222.79$47
Feb 201801961.782.77$53
Jan 201803462.874.01$136
Dec 201742057.272.92$288
Nov 201703555.423.12$109
Oct 201702149.292.98$63
Sep 201701647.523.09$49
Aug 201703645.373.00$108
Jul 201702443.873.09$74
Jun 201703042.493.09$93
May 201701745.373.26$55
Apr 201703247.933.21$103
Mar 201701346.772.98$39
Feb 201702050.452.95$59
Jan 201703249.413.42$109
Dec 201602048.763.72$74
Nov 201601842.492.64$48
Oct 201602146.193.09$65
Sep 201604041.553.10$124
Aug 20160641.442.92$18
Jul 20160941.622.92$26
Jun 201602945.352.69$78
May 2016044442.521.99$884
Apr 201601236.561.99$24
Mar 201601533.011.79$27
Feb 201602026.472.06$41
Jan 201604527.352.36$106
Dec 201501132.362.00$22
Nov 201501338.792.17$28
Oct 201501443.552.43$34
Sep 201501642.992.76$44
Aug 201502540.162.87$72
Jul 201503748.152.95$109
Jun 201501556.152.88$43
May 201502155.212.96$62
Apr 201504449.822.71$119
Mar 201504542.892.93$132
Feb 201503644.662.98$107
Jan 201508443.433.10$260
Dec 201403854.693.59$136
Nov 201405170.464.25$217
Oct 201403978.303.90$152
Sep 201406586.164.05$263
Aug 201405089.394.04$202
Jul 201403196.564.18$130
Jun 201403798.164.74$175
May 201404294.734.73$199
Apr 201404195.944.81$197
Mar 201404095.895.06$202
Feb 201402497.406.19$149
Jan 201404790.404.86$228
Dec 201305191.824.35$222
Nov 201302588.853.74$93
Oct 201303597.423.78$132
Sep 2013048104.113.72$178
Aug 2013045104.253.52$159
Jul 2013055102.523.72$204
Jun 201302994.403.93$114
May 201303194.834.15$129
Apr 201304293.964.28$180
Mar 201303693.623.91$141
Feb 201302691.233.42$89
Jan 201303691.603.42$123
Dec 201204286.773.42$144
Nov 201202886.953.62$102
Oct 201202689.383.40$88
Sep 201201994.672.92$55
Aug 201204392.662.91$125
Jul 201202885.133.02$85
Jun 2012011079.822.52$277
May 201208491.612.49$209
Apr 2012034101.652.00$68
Mar 2012047105.052.22$104
Feb 2012042101.102.57$108
Jan 201204398.092.73$118
Dec 201104196.873.24$133
Nov 201105095.723.31$166
Oct 201106184.983.65$223
Sep 201102083.623.99$80
Aug 201105083.404.15$207
Jul 201106694.144.52$298
Jun 201104592.904.64$209
May 201106698.134.40$291
Apr 2011063105.964.33$273
Mar 201106396.364.06$256
Feb 201106985.644.18$288
Jan 201107186.504.59$326
Dec 201007585.734.35$326
Nov 201007480.843.80$281
Oct 201006978.103.51$242
Sep 201007372.633.98$291
Aug 201007373.684.42$323
Jul 201006072.554.74$284
Jun 201004770.364.91$231
May 201006071.124.24$254
Apr 201006481.694.12$264
Mar 201005878.394.39$255
Feb 2010014873.585.44$805
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090872.544.11$33
Sep 20090465.543.06$12
Aug 200916567.423.22$277
Jul 200904161.133.46$142
Jun 200906866.163.90$265
May 200909254.743.93$361
Apr 200908146.773.59$291
Mar 2009217442.144.06$791
Feb 200909032.814.63$417
Jan 2009037735.865.37$2,025
Dec 20080237.105.98$12
Nov 2008021855.496.86$1,496
Oct 2008031375.246.92$2,167
Sep 20080261101.767.88$2,056
Aug 20080152114.228.48$1,289
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200801110.3110.45$10
Mar 20080133101.909.66$1,285
Feb 2008034192.538.77$2,991
Jan 2008038290.388.21$3,135
Dec 2007036288.337.30$2,643
Nov 2007043791.677.29$3,186
Oct 2007050382.856.92$3,482
Sep 2007052975.846.24$3,303
Aug 2007062369.066.39$3,980
Jul 2007066470.906.39$4,242
Jun 2007074362.007.55$5,609
May 2007092258.747.85$7,234
Apr 200701,08459.617.81$8,461
Mar 200701,49656.927.30$10,924
Feb 200701,90955.108.22$15,684
Jan 200703,09950.306.73$20,847
Dec 200602,52856.656.92$17,490

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 39.98 =         $0
Gas                   17 Mcf  × $  2.39 =        $41

────────────────────────────────────────────────────
Month total                                      $41

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/224885 is the state's own key, not one this site invented.