Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 225495District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Aug 2006 – May 2026
Value, last 12 filed months
$10
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-04-03173361
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition143 bbl$9,457
GasProduction211,613 Mcf$1,410,806
Total$1,420,263

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6860, -100.7073. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.68603, -100.70730 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,620 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,620 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-4353801726,620 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250158.593.93$4
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250166.743.32$3
Jun 20250166.483.13$3
May 20250160.553.23$3
Apr 20250162.363.54$4
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250174.324.28$4
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20244169.612.36$281
Aug 20240375.632.06$6
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240176.091.78$2
Jan 20240073.023.30$0
Dec 20230171.262.61$3
Nov 20230077.892.81$0
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230168.962.26$2
May 20230170.622.23$2
Apr 20230178.122.24$2
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 20220187.185.86$6
Sep 20220184.888.16$8
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 20210170.783.98$4
Jun 20210069.493.38$0
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200039.982.39$0
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 201946159.012.30$2,717
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190252.782.49$5
May 201903658.482.74$99
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180259.403.07$6
Jul 20180065.142.93$0
Jun 20180160.183.08$3
May 20180465.382.90$12
Apr 20181663.842.90$81
Mar 20180461.222.79$11
Feb 20180661.782.77$17
Jan 20180162.874.01$4
Dec 20170357.272.92$9
Nov 20170555.423.12$16
Oct 20170549.292.98$15
Sep 20170647.523.09$19
Aug 20170545.373.00$15
Jul 20170743.873.09$22
Jun 20170942.493.09$28
May 201701145.373.26$36
Apr 201701147.933.21$35
Mar 201701246.772.98$36
Feb 201701250.452.95$35
Jan 201701349.413.42$44
Dec 201601448.763.72$52
Nov 201601642.492.64$42
Oct 201651846.193.09$287
Sep 201601841.553.10$56
Aug 201602041.442.92$58
Jul 201602141.622.92$61
Jun 201602245.352.69$59
May 201602542.521.99$50
Apr 201602536.561.99$50
Mar 201602633.011.79$47
Feb 201602626.472.06$54
Jan 201602927.352.36$69
Dec 201503232.362.00$64
Nov 201503338.792.17$72
Oct 201503743.552.43$90
Sep 201503642.992.76$99
Aug 201503940.162.87$112
Jul 201503948.152.95$115
Jun 201504056.152.88$115
May 201504555.212.96$133
Apr 201504649.822.71$125
Mar 201505042.892.93$147
Feb 201504144.662.98$122
Jan 201504943.433.10$152
Dec 201405454.693.59$194
Nov 201405670.464.25$238
Oct 201405178.303.90$199
Sep 201405286.164.05$210
Aug 201405389.394.04$214
Jul 201405996.564.18$247
Jun 201406298.164.74$294
May 201407194.734.73$336
Apr 201405695.944.81$269
Mar 201409395.895.06$470
Feb 201409297.406.19$570
Jan 201409090.404.86$437
Dec 2013010691.824.35$462
Nov 201309988.853.74$370
Oct 2013011297.423.78$423
Sep 20130116104.113.72$431
Aug 20130128104.253.52$451
Jul 20130139102.523.72$517
Jun 2013014094.403.93$551
May 2013015694.834.15$647
Apr 2013015893.964.28$677
Mar 201305393.623.91$207
Feb 2013010091.233.42$342
Jan 2013010691.603.42$363
Dec 2012011586.773.42$393
Nov 2012012186.953.62$439
Oct 2012018389.383.40$622
Sep 2012014694.672.92$426
Aug 2012015992.662.91$462
Jul 20120685.133.02$18
Jun 2012014579.822.52$365
May 2012015491.612.49$383
Apr 20120240101.652.00$479
Mar 20120250105.052.22$556
Feb 20120238101.102.57$612
Jan 2012026798.092.73$730
Dec 2011026996.873.24$871
Nov 2011033595.723.31$1,109
Oct 2011014684.983.65$533
Sep 2011029783.623.99$1,184
Aug 2011032783.404.15$1,357
Jul 2011033694.144.52$1,518
Jun 2011034792.904.64$1,610
May 2011036298.134.40$1,595
Apr 20110360105.964.33$1,560
Mar 2011036896.364.06$1,493
Feb 2011032385.644.18$1,350
Jan 2011036286.504.59$1,661
Dec 2010037785.734.35$1,639
Nov 2010038380.843.80$1,454
Oct 2010041678.103.51$1,460
Sep 2010039272.633.98$1,560
Aug 2010050473.684.42$2,227
Jul 2010045172.554.74$2,136
Jun 2010055470.364.91$2,720
May 2010062571.124.24$2,647
Apr 2010058681.694.12$2,416
Mar 2010059378.394.39$2,602
Feb 2010061273.585.44$3,331
Jan 2010073774.365.96$4,396
Dec 2009074071.445.48$4,058
Nov 2009079674.593.75$2,986
Oct 2009080972.544.11$3,325
Sep 2009086865.543.06$2,660
Aug 2009098567.423.22$3,170
Jul 200901,24961.133.46$4,327
Jun 200901,39466.163.90$5,430
May 200901,55854.743.93$6,116
Apr 200901,61046.773.59$5,776
Mar 200901,72342.144.06$6,994
Feb 2009101,68232.814.63$8,121
Jan 200901,86935.865.37$10,038
Dec 200802,07937.105.98$12,426
Nov 200801,99655.496.86$13,693
Oct 200802,11275.246.92$14,619
Sep 200802,067101.767.88$16,282
Aug 200802,197114.228.48$18,637
Jul 200802,226131.0811.39$25,353
Jun 200802,220131.3313.03$28,932
May 2008122,440123.1711.57$29,719
Apr 200802,392110.3110.45$25,008
Mar 200802,650101.909.66$25,610
Feb 200802,64492.538.77$23,189
Jan 200803,02890.388.21$24,847
Dec 2007173,21388.337.30$24,963
Nov 200703,28091.677.29$23,917
Oct 200703,60382.856.92$24,940
Sep 200703,72475.846.24$23,253
Aug 200704,11569.066.39$26,286
Jul 200704,36070.906.39$27,851
Jun 200704,51362.007.55$34,066
May 200705,71058.747.85$44,802
Apr 2007485,68259.617.81$47,210
Mar 200707,34256.927.30$53,611
Feb 200707,81255.108.22$64,183
Jan 2007010,99850.306.73$73,982
Dec 2006014,32256.656.92$99,086
Nov 2006014,70754.207.62$112,030
Oct 2006020,02454.906.01$120,420
Sep 2006024,94860.085.04$125,668
Aug 2006014,66668.717.34$107,647

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 58.59 =         $0
Gas                    1 Mcf  × $  3.93 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/225495 is the state's own key, not one this site invented.