SAWYER 128

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227497District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$761 k
Sep 2006 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
237
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-25175180
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition231 bbl$18,299
GasProduction144,655 Mcf$742,987
Total$761,286

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5134, -100.7283. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51342, -100.72826 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,902 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,902 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-43538046176,902 ftSep 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (237)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

237 months

May 20260191106.413.05$582
Apr 2026018098.932.87$517
Mar 2026018489.753.15$580
Feb 2026016363.503.75$611
Jan 2026015659.138.00$1,248
Dec 2025016056.664.41$706
Nov 2025016958.593.93$664
Oct 2025018359.383.30$605
Sep 2025017862.743.08$548
Aug 2025019063.933.01$573
Jul 2025019066.743.32$630
Jun 2025018366.483.13$573
May 2025017860.553.23$575
Apr 2025016962.363.54$599
Mar 2025011967.704.27$508
Feb 2025014570.884.34$629
Jan 2025015474.324.28$659
Dec 2024015768.993.12$490
Nov 2024016069.052.20$352
Oct 2024017871.372.28$406
Sep 2024018369.612.36$433
Aug 2024019975.632.06$411
Jul 2024019279.932.15$412
Jun 2024019278.082.63$506
May 2024020678.812.20$453
Apr 2024018584.451.66$307
Mar 2024013580.301.55$209
Feb 2024011276.091.78$200
Jan 2024012373.023.30$406
Dec 2023012771.262.61$332
Nov 2023012877.892.81$359
Oct 2023012785.443.09$392
Sep 2023011389.042.74$309
Aug 2023016080.522.67$428
Jul 2023018774.852.64$494
Jun 2023018268.962.26$411
May 2023020670.622.23$459
Apr 2023019178.122.24$427
Mar 2023019872.852.39$474
Feb 2023023075.112.47$567
Jan 2023018976.533.39$640
Dec 2022019176.415.73$1,094
Nov 2022019185.005.65$1,078
Oct 2022022887.185.86$1,337
Sep 2022022284.888.16$1,812
Aug 2022024294.529.13$2,209
Jul 20220196101.587.54$1,478
Jun 20220153115.097.98$1,221
May 20220303109.378.43$2,555
Apr 20220294104.226.84$2,010
Mar 20220217108.885.08$1,102
Feb 2022019091.054.86$923
Jan 2022023281.844.54$1,053
Dec 2021022071.323.90$858
Nov 2021024777.435.24$1,294
Oct 2021026579.795.71$1,514
Sep 2021026069.865.35$1,391
Aug 2021027166.024.22$1,144
Jul 2021027270.783.98$1,083
Jun 2021028569.493.38$963
May 2021026463.483.02$797
Apr 2021027760.362.76$764
Mar 2021030761.302.72$834
Feb 2021016357.805.55$904
Jan 2021029550.412.81$829
Dec 2020029444.642.68$787
Nov 2020030438.772.71$823
Oct 2020031236.972.48$773
Sep 2020028637.091.99$569
Aug 2020032639.982.39$778
Jul 2020027938.371.83$509
Jun 2020031034.901.69$524
May 2020031816.921.81$577
Apr 2020028814.751.80$520
Mar 2020027930.341.86$518
Feb 2020026749.881.98$529
Jan 2020030157.252.09$631
Dec 2019030259.012.30$696
Nov 2019029155.302.75$800
Oct 2019025653.472.42$619
Sep 2019030855.052.66$818
Aug 2019031353.112.30$721
Jul 2019030756.272.46$755
Jun 2019028352.782.49$705
May 2019031658.482.74$866
Apr 2019030362.632.75$833
Mar 2019030856.803.06$943
Feb 2019027850.852.79$776
Jan 2019029546.033.23$952
Dec 2018028546.594.19$1,193
Nov 2018025252.934.24$1,068
Oct 2018030061.443.40$1,019
Sep 2018031059.543.11$963
Aug 2018042559.403.07$1,303
Jul 2018041065.142.93$1,202
Jun 2018031560.183.08$969
May 2018032265.382.90$934
Apr 2018030663.842.90$888
Mar 2018030661.222.79$853
Feb 2018027161.782.77$750
Jan 2018027362.874.01$1,095
Dec 2017040457.272.92$1,180
Nov 2017031055.423.12$967
Oct 2017033549.292.98$1,000
Sep 2017034147.523.09$1,053
Aug 2017036645.373.00$1,100
Jul 2017037443.873.09$1,155
Jun 2017038242.493.09$1,179
May 2017044545.373.26$1,452
Apr 2017041847.933.21$1,342
Mar 2017037246.772.98$1,110
Feb 2017032150.452.95$948
Jan 2017032749.413.42$1,118
Dec 2016031048.763.72$1,154
Nov 2016031242.492.64$825
Oct 2016032846.193.09$1,014
Sep 2016332541.553.10$1,132
Aug 2016034241.442.92$1,000
Jul 2016044441.622.92$1,298
Jun 2016432845.352.69$1,062
May 2016035242.521.99$701
Apr 2016035436.561.99$705
Mar 2016436733.011.79$790
Feb 2016033926.472.06$700
Jan 2016036127.352.36$854
Dec 2015033932.362.00$678
Nov 2015032038.792.17$694
Oct 2015333843.552.43$951
Sep 2015035842.992.76$988
Aug 2015340240.162.87$1,275
Jul 2015047148.152.95$1,387
Jun 2015345256.152.88$1,472
May 2015346555.212.96$1,540
Apr 2015045349.822.71$1,226
Mar 2015046342.892.93$1,359
Feb 2015340944.662.98$1,351
Jan 2015041843.433.10$1,296
Dec 2014049654.693.59$1,781
Nov 2014048170.464.25$2,045
Oct 2014349878.303.90$2,178
Sep 2014050086.164.05$2,023
Aug 2014350389.394.04$2,298
Jul 2014044996.564.18$1,877
Jun 2014043898.164.74$2,075
May 2014344194.734.73$2,369
Apr 2014044995.944.81$2,159
Mar 2014036595.895.06$1,846
Feb 2014043697.406.19$2,700
Jan 2014346390.404.86$2,522
Dec 2013047191.824.35$2,051
Nov 2013045888.853.74$1,712
Oct 2013348797.423.78$2,133
Sep 20130498104.113.72$1,851
Aug 20130500104.253.52$1,761
Jul 20130516102.523.72$1,918
Jun 2013251294.403.93$2,203
May 2013454194.834.15$2,624
Apr 2013055393.964.28$2,368
Mar 2013059393.623.91$2,320
Feb 2013453391.233.42$2,188
Jan 2013460291.603.42$2,425
Dec 2012062386.773.42$2,131
Nov 2012460586.953.62$2,541
Oct 2012067189.383.40$2,281
Sep 2012067494.672.92$1,967
Aug 2012375792.662.91$2,479
Jul 2012074385.133.02$2,244
Jun 2012072279.822.52$1,819
May 2012484191.612.49$2,459
Apr 20120798101.652.00$1,593
Mar 20125843105.052.22$2,398
Feb 20125827101.102.57$2,631
Jan 2012088398.092.73$2,414
Dec 2011581396.873.24$3,118
Nov 2011682095.723.31$3,290
Oct 2011094084.983.65$3,430
Sep 2011098283.623.99$3,914
Aug 201101,01983.404.15$4,228
Jul 2011082394.144.52$3,718
Jun 2011088892.904.64$4,120
May 2011687398.134.40$4,434
Apr 20111943105.964.33$4,192
Mar 2011099196.364.06$4,021
Feb 201161,04985.644.18$4,899
Jan 201101,01386.504.59$4,648
Dec 2010098685.734.35$4,287
Nov 2010581080.843.80$3,478
Oct 2010088778.103.51$3,112
Sep 201001,05872.633.98$4,210
Aug 2010498073.684.42$4,626
Jul 201001,07472.554.74$5,087
Jun 201001,01070.364.91$4,960
May 201051,09771.124.24$5,002
Apr 201001,07381.694.12$4,424
Mar 201051,15878.394.39$5,474
Feb 201001,06373.585.44$5,785
Jan 201071,30874.365.96$8,322
Dec 200901,41971.445.48$7,781
Nov 200941,89574.593.75$7,407
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200901,16567.423.22$3,750
Jul 200951,20761.133.46$4,487
Jun 200901,19866.163.90$4,666
May 200951,32954.743.93$5,491
Apr 200901,11346.773.59$3,993
Mar 200901,04142.144.06$4,225
Feb 200951,21632.814.63$5,798
Jan 200901,18335.865.37$6,354
Dec 200801,26537.105.98$7,561
Nov 200851,33755.496.86$9,450
Oct 200801,38875.246.92$9,608
Sep 20080981101.767.88$7,727
Aug 200861,380114.228.48$12,392
Jul 200801,382131.0811.39$15,740
Jun 200861,395131.3313.03$18,969
May 200801,490123.1711.57$17,246
Apr 200861,478110.3110.45$16,114
Mar 200871,602101.909.66$16,195
Feb 200871,55092.538.77$14,242
Jan 200801,72290.388.21$14,130
Dec 200701,82288.337.30$13,304
Nov 200771,80991.677.29$13,832
Oct 200792,05682.856.92$14,977
Sep 200702,25175.846.24$14,056
Aug 200742,77569.066.39$18,003
Jul 200751,04370.906.39$7,017
Jun 200701,32862.007.55$10,024
May 200762,35158.747.85$18,799
Apr 200792,34159.617.81$18,808
Mar 200792,73756.927.30$20,498
Feb 200702,64455.108.22$21,723
Jan 200703,18750.306.73$21,438
Dec 200603,54956.656.92$24,554
Nov 200603,41254.207.62$25,991
Oct 20060054.906.01$0
Sep 2006010560.085.04$529

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  191 Mcf  × $  3.05 =       $582

────────────────────────────────────────────────────
Month total                                     $582

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/227497 is the state's own key, not one this site invented.