WILSON, DUKE 21 1/2

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227701District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$798 k
Aug 2006 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-25175143
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition59 bbl$3,326
GasProduction132,476 Mcf$794,690
Total$798,015

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3800, -100.7880. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.38004, -100.78800 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,700 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-4353797369,700 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 20260182106.413.05$554
Apr 2026119698.932.87$661
Mar 2026121089.753.15$751
Feb 2026019463.503.75$728
Jan 2026018459.138.00$1,472
Dec 20250356.664.41$13
Nov 20250258.593.93$8
Oct 202511659.383.30$112
Sep 2025012662.743.08$388
Aug 2025120163.933.01$670
Jul 2025129366.743.32$1,038
Jun 2025030866.483.13$964
May 2025135060.553.23$1,192
Apr 2025234562.363.54$1,347
Mar 2025136067.704.27$1,604
Feb 2025130370.884.34$1,386
Jan 2025131074.324.28$1,401
Dec 2024027268.993.12$849
Nov 2024026369.052.20$578
Oct 2024020871.372.28$475
Sep 2024112069.612.36$353
Aug 2024125875.632.06$608
Jul 2024140579.932.15$949
Jun 2024136678.082.63$1,042
May 2024031678.812.20$695
Apr 2024314584.451.66$494
Mar 2024141980.301.55$728
Feb 2024240176.091.78$867
Jan 2024039573.023.30$1,303
Dec 202312871.262.61$144
Nov 2023119377.892.81$620
Oct 2023139685.443.09$1,308
Sep 2023041489.042.74$1,132
Aug 2023045180.522.67$1,205
Jul 2023043174.852.64$1,139
Jun 2023034668.962.26$781
May 2023047970.622.23$1,067
Apr 2023048678.122.24$1,088
Mar 2023040272.852.39$962
Feb 2023036675.112.47$902
Jan 2023047276.533.39$1,599
Dec 2022036076.415.73$2,062
Nov 2022042585.005.65$2,400
Oct 2022044287.185.86$2,592
Sep 2022044484.888.16$3,625
Aug 2022051294.529.13$4,673
Jul 20220161101.587.54$1,214
Jun 20220577115.097.98$4,603
May 20220468109.378.43$3,947
Apr 20220472104.226.84$3,227
Mar 20220618108.885.08$3,137
Feb 2022030891.054.86$1,497
Jan 2022047081.844.54$2,133
Dec 2021059071.323.90$2,300
Nov 2021052577.435.24$2,749
Oct 2021056979.795.71$3,251
Sep 2021058869.865.35$3,146
Aug 2021057666.024.22$2,431
Jul 2021054970.783.98$2,186
Jun 2021050169.493.38$1,694
May 2021023163.483.02$697
Apr 202105460.362.76$149
Mar 202107161.302.72$193
Feb 2021018657.805.55$1,032
Jan 2021056850.412.81$1,596
Dec 2020052544.642.68$1,405
Nov 2020035638.772.71$964
Oct 2020012536.972.48$310
Sep 2020011037.091.99$219
Aug 202009339.982.39$222
Jul 20200138.371.83$2
Jun 20200534.901.69$8
May 202004016.921.81$73
Apr 202008114.751.80$146
Mar 202003430.341.86$63
Feb 2020014849.881.98$293
Jan 2020020657.252.09$432
Dec 2019024359.012.30$560
Nov 2019024555.302.75$674
Oct 2019024753.472.42$597
Sep 2019025355.052.66$672
Aug 2019027353.112.30$629
Jul 2019027656.272.46$679
Jun 2019025752.782.49$640
May 2019026758.482.74$732
Apr 2019025362.632.75$696
Mar 2019026256.803.06$802
Feb 2019023750.852.79$662
Jan 2019026046.033.23$839
Dec 2018025046.594.19$1,046
Nov 2018023852.934.24$1,008
Oct 2018023761.443.40$805
Sep 2018022559.543.11$699
Aug 2018023159.403.07$708
Jul 2018024865.142.93$727
Jun 2018019460.183.08$597
May 2018018165.382.90$525
Apr 2018015963.842.90$461
Mar 2018014961.222.79$415
Feb 2018012061.782.77$332
Jan 2018013062.874.01$521
Dec 2017012457.272.92$362
Nov 2017111955.423.12$427
Oct 2017112049.292.98$407
Sep 2017111447.523.09$399
Aug 2017311545.373.00$482
Jul 2017011543.873.09$355
Jun 2017211142.493.09$428
May 201727745.373.26$342
Apr 20171347.933.21$58
Mar 201731146.772.98$173
Feb 201731150.452.95$184
Jan 20171149.413.42$53
Dec 201613648.763.72$183
Nov 2016110442.492.64$318
Oct 2016110846.193.09$380
Sep 2016010541.553.10$326
Aug 2016111041.442.92$363
Jul 2016011241.622.92$328
Jun 2016111445.352.69$352
May 2016011542.521.99$229
Apr 201607836.561.99$155
Mar 201638533.011.79$252
Feb 201605626.472.06$116
Jan 201619527.352.36$252
Dec 201525732.362.00$179
Nov 201516238.792.17$173
Oct 201514843.552.43$160
Sep 201526242.992.76$257
Aug 201519640.162.87$316
Jul 201519548.152.95$328
Jun 201508656.152.88$248
May 201507555.212.96$222
Apr 201505149.822.71$138
Mar 201506442.892.93$188
Feb 201505644.662.98$167
Jan 201506643.433.10$205
Dec 201405154.693.59$183
Nov 201408770.464.25$370
Oct 201409578.303.90$371
Sep 201409186.164.05$368
Aug 201409689.394.04$387
Jul 201409596.564.18$397
Jun 201409198.164.74$431
May 201409494.734.73$444
Apr 201409095.944.81$433
Mar 201409295.895.06$465
Feb 201408297.406.19$508
Jan 201409190.404.86$442
Dec 201309791.824.35$422
Nov 201308588.853.74$318
Oct 201309197.423.78$344
Sep 2013078104.113.72$290
Aug 2013092104.253.52$324
Jul 2013051102.523.72$190
Jun 201308294.403.93$323
May 201308694.834.15$357
Apr 201308293.964.28$351
Mar 201308493.623.91$329
Feb 201307491.233.42$253
Jan 201303791.603.42$127
Dec 201203286.773.42$109
Nov 201205086.953.62$181
Oct 201205789.383.40$194
Sep 201204594.672.92$131
Aug 201208792.662.91$253
Jul 2012038385.133.02$1,157
Jun 2012033879.822.52$851
May 2012028891.612.49$717
Apr 20120225101.652.00$449
Mar 20120165105.052.22$367
Feb 2012096101.102.57$247
Jan 2012021698.092.73$591
Dec 2011028496.873.24$920
Nov 201108395.723.31$275
Oct 2011020584.983.65$748
Sep 2011024883.623.99$988
Aug 2011043383.404.15$1,797
Jul 2011049694.144.52$2,241
Jun 2011048492.904.64$2,246
May 2011054598.134.40$2,401
Apr 20110510105.964.33$2,210
Mar 2011038096.364.06$1,542
Feb 2011038585.644.18$1,609
Jan 2011057986.504.59$2,657
Dec 2010059585.734.35$2,587
Nov 2010058880.843.80$2,232
Oct 2010060678.103.51$2,126
Sep 2010059372.633.98$2,360
Aug 2010050073.684.42$2,210
Jul 2010015772.554.74$744
Jun 2010022870.364.91$1,120
May 2010055871.124.24$2,363
Apr 2010043981.694.12$1,810
Mar 2010046178.394.39$2,023
Feb 2010039473.585.44$2,144
Jan 2010043774.365.96$2,606
Dec 2009048071.445.48$2,632
Nov 2009060874.593.75$2,281
Oct 2009039272.544.11$1,611
Sep 2009041865.543.06$1,281
Aug 2009047367.423.22$1,522
Jul 2009068361.133.46$2,366
Jun 2009069766.163.90$2,715
May 2009068354.743.93$2,681
Apr 2009067146.773.59$2,407
Mar 2009073242.144.06$2,971
Feb 2009069932.814.63$3,238
Jan 2009094635.865.37$5,081
Dec 200801,07937.105.98$6,449
Nov 200801,02655.496.86$7,039
Oct 200801,17175.246.92$8,106
Sep 20080966101.767.88$7,609
Aug 200801,244114.228.48$10,553
Jul 200801,390131.0811.39$15,831
Jun 200801,248131.3313.03$16,265
May 200801,416123.1711.57$16,389
Apr 200801,554110.3110.45$16,247
Mar 200801,710101.909.66$16,526
Feb 200801,71692.538.77$15,050
Jan 200801,96990.388.21$16,157
Dec 200702,20988.337.30$16,130
Nov 200702,44091.677.29$17,792
Oct 200702,67682.856.92$18,523
Sep 200702,89075.846.24$18,046
Aug 200703,03469.066.39$19,381
Jul 200703,01270.906.39$19,240
Jun 200703,10062.007.55$23,400
May 200703,69258.747.85$28,968
Apr 200703,88259.617.81$30,300
Mar 200704,61656.927.30$33,706
Feb 200704,55455.108.22$37,416
Jan 200705,33750.306.73$35,901
Dec 200605,72556.656.92$39,608
Nov 200605,25654.207.62$40,037
Oct 200605,06754.906.01$30,472
Sep 200604,03560.085.04$20,325
Aug 2006092068.717.34$6,753

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  182 Mcf  × $  3.05 =       $554

────────────────────────────────────────────────────
Month total                                     $554

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/227701 is the state's own key, not one this site invented.