MAYER, EDWIN S. JR

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228040District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$886 k
Nov 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-25175168
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11 bbl$919
GasProduction128,792 Mcf$884,828
Total$885,746

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6568, -100.8470. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.65678, -100.84695 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,281 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,281 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-43538160268,281 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 2026040106.413.05$122
Apr 202603698.932.87$103
Mar 202604289.753.15$132
Feb 202603563.503.75$131
Jan 202604059.138.00$320
Dec 202503756.664.41$163
Nov 202504058.593.93$157
Oct 202504259.383.30$139
Sep 202504162.743.08$126
Aug 202504163.933.01$124
Jul 202503966.743.32$129
Jun 202504466.483.13$138
May 202504060.553.23$129
Apr 202504262.363.54$149
Mar 202504167.704.27$175
Feb 202503970.884.34$169
Jan 202504074.324.28$171
Dec 202404468.993.12$137
Nov 202404169.052.20$90
Oct 202404271.372.28$96
Sep 202404369.612.36$102
Aug 202404475.632.06$91
Jul 202404479.932.15$94
Jun 202404978.082.63$129
May 202404378.812.20$95
Apr 202404484.451.66$73
Mar 202404480.301.55$68
Feb 202404276.091.78$75
Jan 202404773.023.30$155
Dec 202304371.262.61$112
Nov 202304877.892.81$135
Oct 202304285.443.09$130
Sep 202304589.042.74$123
Aug 202304780.522.67$126
Jul 202304474.852.64$116
Jun 202304768.962.26$106
May 202305170.622.23$114
Apr 202304478.122.24$98
Mar 202305172.852.39$122
Feb 202304475.112.47$108
Jan 202305076.533.39$169
Dec 202205176.415.73$292
Nov 202205285.005.65$294
Oct 202205387.185.86$311
Sep 202204584.888.16$367
Aug 202204894.529.13$438
Jul 2022059101.587.54$445
Jun 2022027115.097.98$215
May 2022048109.378.43$405
Apr 2022047104.226.84$321
Mar 2022021108.885.08$107
Feb 202204891.054.86$233
Jan 202205381.844.54$241
Dec 202105771.323.90$222
Nov 202104277.435.24$220
Oct 202102079.795.71$114
Sep 202103669.865.35$193
Aug 202103866.024.22$160
Jul 202103870.783.98$151
Jun 202103769.493.38$125
May 202103863.483.02$115
Apr 202103760.362.76$102
Mar 202103761.302.72$101
Feb 202102657.805.55$144
Jan 202103550.412.81$98
Dec 202004044.642.68$107
Nov 202003638.772.71$97
Oct 202004036.972.48$99
Sep 202003637.091.99$72
Aug 202004039.982.39$95
Jul 202003938.371.83$71
Jun 202003834.901.69$64
May 202003916.921.81$71
Apr 202003714.751.80$67
Mar 202003730.341.86$69
Feb 202003749.881.98$73
Jan 202003757.252.09$78
Dec 201903759.012.30$85
Nov 201903255.302.75$88
Oct 201902453.472.42$58
Sep 201903855.052.66$101
Aug 201904253.112.30$97
Jul 201904256.272.46$103
Jun 201904052.782.49$100
May 201903958.482.74$107
Apr 201904062.632.75$110
Mar 201904356.803.06$132
Feb 201903350.852.79$92
Jan 201903746.033.23$119
Dec 201803746.594.19$155
Nov 201803652.934.24$153
Oct 201803861.443.40$129
Sep 201803859.543.11$118
Aug 201804059.403.07$123
Jul 201804165.142.93$120
Jun 201803960.183.08$120
May 201804165.382.90$119
Apr 201803863.842.90$110
Mar 201804061.222.79$111
Feb 201803861.782.77$105
Jan 201803962.874.01$156
Dec 201703957.272.92$114
Nov 201703955.423.12$122
Oct 201704249.292.98$125
Sep 201704147.523.09$127
Aug 201704445.373.00$132
Jul 201704443.873.09$136
Jun 201704242.493.09$130
May 201704245.373.26$137
Apr 201704147.933.21$132
Mar 201704246.772.98$125
Feb 201702850.452.95$83
Jan 201703249.413.42$109
Dec 201603048.763.72$112
Nov 201604542.492.64$119
Oct 20160246.193.09$6
Sep 201601941.553.10$59
Aug 201602741.442.92$79
Jul 201601841.622.92$53
Jun 201605045.352.69$134
May 201604942.521.99$98
Apr 201605236.561.99$104
Mar 201605533.011.79$99
Feb 201605126.472.06$105
Jan 201605527.352.36$130
Dec 201505432.362.00$108
Nov 201504838.792.17$104
Oct 201505243.552.43$126
Sep 201505042.992.76$138
Aug 201505140.162.87$147
Jul 201505348.152.95$156
Jun 201505056.152.88$144
May 201503455.212.96$100
Apr 201503949.822.71$106
Mar 201507242.892.93$211
Feb 201506244.662.98$185
Jan 201507043.433.10$217
Dec 201407154.693.59$255
Nov 201407170.464.25$302
Oct 201407278.303.90$281
Sep 201407086.164.05$283
Aug 201407289.394.04$291
Jul 201407596.564.18$313
Jun 201407498.164.74$351
May 201408094.734.73$378
Apr 201408095.944.81$385
Mar 201408295.895.06$415
Feb 201407697.406.19$471
Jan 201408490.404.86$408
Dec 201308791.824.35$379
Nov 201309488.853.74$351
Oct 2013013497.423.78$506
Sep 20130502104.113.72$1,866
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 201301294.403.93$47
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 201161283.623.99$550
Aug 201151983.404.15$496
Jul 2011019794.144.52$890
Jun 2011024092.904.64$1,114
May 2011026698.134.40$1,172
Apr 20110284105.964.33$1,231
Mar 2011031796.364.06$1,286
Feb 2011027085.644.18$1,129
Jan 2011031686.504.59$1,450
Dec 2010032885.734.35$1,426
Nov 2010033280.843.80$1,260
Oct 2010040478.103.51$1,418
Sep 2010038272.633.98$1,520
Aug 2010053473.684.42$2,360
Jul 201001,19072.554.74$5,636
Jun 201001,30670.364.91$6,413
May 2010043571.124.24$1,842
Apr 2010080581.694.12$3,319
Mar 2010066178.394.39$2,901
Feb 201001,39273.585.44$7,576
Jan 201001,52874.365.96$9,113
Dec 200901,55971.445.48$8,549
Nov 200901,56474.593.75$5,867
Oct 200901,61472.544.11$6,634
Sep 200901,55665.543.06$4,769
Aug 200901,63267.423.22$5,253
Jul 200901,58261.133.46$5,481
Jun 2009057266.163.90$2,228
May 2009052354.743.93$2,053
Apr 200901,23346.773.59$4,423
Mar 200901,15142.144.06$4,672
Feb 200901,13332.814.63$5,249
Jan 200901,94235.865.37$10,430
Dec 200802,30337.105.98$13,765
Nov 200802,36355.496.86$16,211
Oct 200802,46575.246.92$17,063
Sep 200802,207101.767.88$17,385
Aug 200802,391114.228.48$20,283
Jul 200802,648131.0811.39$30,159
Jun 200802,667131.3313.03$34,758
May 200802,742123.1711.57$31,737
Apr 200802,782110.3110.45$29,085
Mar 200802,967101.909.66$28,673
Feb 200802,92192.538.77$25,619
Jan 200802,50790.388.21$20,572
Dec 200702,39688.337.30$17,496
Nov 200702,96291.677.29$21,598
Oct 200702,46382.856.92$17,049
Sep 200702,84775.846.24$17,777
Aug 200703,62269.066.39$23,137
Jul 200703,37370.906.39$21,547
Jun 200703,48362.007.55$26,291
May 200704,44358.747.85$34,861
Apr 200705,04659.617.81$39,385
Mar 200705,62456.927.30$41,066
Feb 200705,70755.108.22$46,889
Jan 200707,77650.306.73$52,308
Dec 200609,38456.656.92$64,923
Nov 200604,00154.207.62$30,478

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   40 Mcf  × $  3.05 =       $122

────────────────────────────────────────────────────
Month total                                     $122

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/228040 is the state's own key, not one this site invented.