EPPS, H.C. 49

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228095District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$797 k
Feb 2007 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
232
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-25175233
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition241 bbl$16,923
GasProduction155,960 Mcf$779,913
Total$796,836

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3120, -100.5783. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31203, -100.57828 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,000 ft.

Completions filed
Feb 2007
1 of 1 wells

1 well

42-4353827336,000 ftFeb 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (232)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

232 months

May 2026055106.413.05$168
Apr 202605098.932.87$143
Mar 202605589.753.15$173
Feb 202604463.503.75$165
Jan 202604959.138.00$392
Dec 202504456.664.41$194
Nov 202504758.593.93$185
Oct 202504459.383.30$145
Sep 202505762.743.08$175
Aug 202505863.933.01$175
Jul 202506166.743.32$202
Jun 202506066.483.13$188
May 202506760.553.23$217
Apr 202506662.363.54$234
Mar 202506467.704.27$273
Feb 202506570.884.34$282
Jan 202507074.324.28$300
Dec 202406768.993.12$209
Nov 202405969.052.20$130
Oct 202405771.372.28$130
Sep 202403269.612.36$76
Aug 202403775.632.06$76
Jul 202404079.932.15$86
Jun 202404278.082.63$111
May 202404878.812.20$106
Apr 202404084.451.66$66
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 202403273.023.30$106
Dec 202307071.262.61$183
Nov 202306077.892.81$168
Oct 202305485.443.09$167
Sep 202308689.042.74$235
Aug 202378380.522.67$785
Jul 202308374.852.64$219
Jun 202308868.962.26$199
May 202308770.622.23$194
Apr 202309078.122.24$201
Mar 202308772.852.39$208
Feb 202307475.112.47$182
Jan 202307776.533.39$261
Dec 202208576.415.73$487
Nov 202203185.005.65$175
Oct 202208587.185.86$498
Sep 2022010084.888.16$816
Aug 20220594.529.13$46
Jul 202200101.587.54$0
Jun 202207115.097.98$56
May 2022015109.378.43$127
Apr 202202104.226.84$14
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 202201981.844.54$86
Dec 202102871.323.90$109
Nov 2021011377.435.24$592
Oct 2021037379.795.71$2,131
Sep 2021030469.865.35$1,627
Aug 2021029766.024.22$1,254
Jul 2021042770.783.98$1,700
Jun 2021038669.493.38$1,305
May 2021045263.483.02$1,364
Apr 2021023660.362.76$651
Mar 2021034761.302.72$943
Feb 2021029757.805.55$1,648
Jan 2021034250.412.81$961
Dec 2020037744.642.68$1,009
Nov 2020037138.772.71$1,004
Oct 2020038236.972.48$947
Sep 2020032137.091.99$639
Aug 2020039039.982.39$930
Jul 2020038938.371.83$710
Jun 2020050234.901.69$849
May 2020028216.921.81$512
Apr 20201137714.751.80$843
Mar 2020041930.341.86$778
Feb 2020038949.881.98$770
Jan 2020027157.252.09$568
Dec 2019053559.012.30$1,233
Nov 2019054755.302.75$1,505
Oct 2019060053.472.42$1,451
Sep 2019018555.052.66$492
Aug 2019011553.112.30$265
Jul 2019126056.272.46$696
Jun 2019040052.782.49$996
May 2019052358.482.74$1,433
Apr 2019552662.632.75$1,760
Mar 2019051956.803.06$1,589
Feb 2019046550.852.79$1,298
Jan 2019052446.033.23$1,692
Dec 2018548046.594.19$2,242
Nov 2018050652.934.24$2,144
Oct 2018044361.443.40$1,505
Sep 2018052059.543.11$1,616
Aug 2018053659.403.07$1,644
Jul 2018048365.142.93$1,416
Jun 2018051660.183.08$1,588
May 2018054865.382.90$1,590
Apr 2018652963.842.90$1,918
Mar 2018049061.222.79$1,366
Feb 2018041961.782.77$1,159
Jan 2018640862.874.01$2,013
Dec 2017047657.272.92$1,391
Nov 2017047855.423.12$1,491
Oct 2017054949.292.98$1,638
Sep 2017752647.523.09$1,957
Aug 2017055745.373.00$1,673
Jul 2017055143.873.09$1,701
Jun 2017055142.493.09$1,701
May 2017654945.373.26$2,064
Apr 2017056447.933.21$1,811
Mar 2017059746.772.98$1,781
Feb 2017755450.452.95$1,989
Jan 2017060249.413.42$2,058
Dec 2016062448.763.72$2,323
Nov 2016660342.492.64$1,849
Oct 2016063046.193.09$1,947
Sep 2016060941.553.10$1,888
Aug 2016063141.442.92$1,845
Jul 2016663941.622.92$2,118
Jun 2016061845.352.69$1,660
May 2016066042.521.99$1,314
Apr 2016658136.561.99$1,376
Mar 2016064933.011.79$1,164
Feb 2016061026.472.06$1,259
Jan 2016665427.352.36$1,710
Dec 2015263832.362.00$1,342
Nov 2015064838.792.17$1,404
Oct 2015867343.552.43$1,981
Sep 2015064242.992.76$1,771
Aug 2015067640.162.87$1,942
Jul 2015065948.152.95$1,941
Jun 2015663856.152.88$2,176
May 2015066155.212.96$1,954
Apr 2015062549.822.71$1,692
Mar 2015267242.892.93$2,058
Feb 2015554644.662.98$1,848
Jan 2015042243.433.10$1,308
Dec 2014061154.693.59$2,194
Nov 2014667670.464.25$3,297
Oct 2014064378.303.90$2,508
Sep 2014071486.164.05$2,888
Aug 2014674989.394.04$3,559
Jul 2014074396.564.18$3,105
Jun 2014073698.164.74$3,486
May 2014077594.734.73$3,663
Apr 2014677295.944.81$4,288
Mar 2014061595.895.06$3,110
Feb 2014666497.406.19$4,696
Jan 2014073790.404.86$3,582
Dec 2013576391.824.35$3,782
Nov 2013074288.853.74$2,774
Oct 2013574297.423.78$3,291
Sep 20130806104.113.72$2,997
Aug 20135836104.253.52$3,466
Jul 20130858102.523.72$3,190
Jun 2013083694.403.93$3,288
May 2013688294.834.15$4,228
Apr 2013086793.964.28$3,713
Mar 2013595193.623.91$4,189
Feb 2013067991.233.42$2,322
Jan 2013574691.603.42$3,009
Dec 2012078686.773.42$2,688
Nov 2012578586.953.62$3,280
Oct 2012679489.383.40$3,236
Sep 2012079394.672.92$2,314
Aug 2012084492.662.91$2,454
Jul 2012084785.133.02$2,559
Jun 2012081279.822.52$2,045
May 2012083491.612.49$2,075
Apr 20120829101.652.00$1,655
Mar 20123789105.052.22$2,068
Feb 20120757101.102.57$1,946
Jan 2012086198.092.73$2,354
Dec 2011086996.873.24$2,815
Nov 2011082795.723.31$2,738
Oct 2011079884.983.65$2,912
Sep 2011067183.623.99$2,674
Aug 2011072683.404.15$3,012
Jul 2011073894.144.52$3,334
Jun 20111071792.904.64$4,256
May 2011093198.134.40$4,101
Apr 201101,337105.964.33$5,794
Mar 201101,06596.364.06$4,321
Feb 2011087585.644.18$3,657
Jan 2011090786.504.59$4,162
Dec 2010074285.734.35$3,226
Nov 2010787380.843.80$3,879
Oct 2010089978.103.51$3,154
Sep 2010286172.633.98$3,572
Aug 2010085373.684.42$3,770
Jul 2010090672.554.74$4,291
Jun 2010385670.364.91$4,414
May 2010097171.124.24$4,112
Apr 2010056381.694.12$2,321
Mar 2010035278.394.39$1,545
Feb 2010087973.585.44$4,784
Jan 2010089574.365.96$5,338
Dec 2009488971.445.48$5,161
Nov 2009495074.593.75$3,862
Oct 200901,06272.544.11$4,365
Sep 200901,11665.543.06$3,420
Aug 2009192667.423.22$3,048
Jul 200901,09161.133.46$3,780
Jun 200931,01966.163.90$4,167
May 200901,19354.743.93$4,683
Apr 2009074046.773.59$2,655
Mar 2009090742.144.06$3,682
Feb 2009589132.814.63$4,292
Jan 200901,04235.865.37$5,597
Dec 200801,12837.105.98$6,742
Nov 200801,18955.496.86$8,157
Oct 200801,19175.246.92$8,244
Sep 200861,229101.767.88$10,292
Aug 200801,429114.228.48$12,122
Jul 200801,212131.0811.39$13,804
Jun 200851,370131.3313.03$18,511
May 200851,737123.1711.57$20,720
Apr 200801,566110.3110.45$16,372
Mar 200801,589101.909.66$15,356
Feb 200801,53792.538.77$13,480
Jan 200891,83190.388.21$15,838
Dec 200701,63188.337.30$11,910
Nov 200702,15991.677.29$15,743
Oct 200702,31982.856.92$16,052
Sep 200702,53575.846.24$15,829
Aug 200702,44169.066.39$15,593
Jul 200703,48370.906.39$22,249
Jun 200703,83762.007.55$28,963
May 200704,43058.747.85$34,759
Apr 200705,05159.617.81$39,424
Mar 200706,09656.927.30$44,513
Feb 200701,74855.108.22$14,362

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   55 Mcf  × $  3.05 =       $168

────────────────────────────────────────────────────
Month total                                     $168

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/228095 is the state's own key, not one this site invented.