SIMMONS RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228384District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$151 k
Dec 2006 – May 2026
Value, last 12 filed months
$36
at the published price for each month
Months reported
234
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-14175316
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition99 bbl$7,344
GasProduction25,412 Mcf$143,678
Total$151,021

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6217, -100.7665. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62172, -100.76651 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,150 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-43538104848,150 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260459.138.00$32
Dec 20250156.664.41$4
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250170.884.34$4
Jan 20250274.324.28$9
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240271.372.28$5
Sep 20240469.612.36$9
Aug 20240475.632.06$8
Jul 20240479.932.15$9
Jun 20240578.082.63$13
May 20240578.812.20$11
Apr 20240684.451.66$10
Mar 20240580.301.55$8
Feb 20240476.091.78$7
Jan 20240373.023.30$10
Dec 20230471.262.61$10
Nov 20230577.892.81$14
Oct 20230485.443.09$12
Sep 20230689.042.74$16
Aug 20230580.522.67$13
Jul 202301274.852.64$32
Jun 20230568.962.26$11
May 20230670.622.23$13
Apr 20230378.122.24$7
Mar 20230572.852.39$12
Feb 20230375.112.47$7
Jan 20230476.533.39$14
Dec 20220576.415.73$29
Nov 20220485.005.65$23
Oct 20220587.185.86$29
Sep 20220484.888.16$33
Aug 20220794.529.13$64
Jul 202204101.587.54$30
Jun 2022026115.097.98$207
May 202201109.378.43$8
Apr 2022012104.226.84$82
Mar 202200108.885.08$0
Feb 202203091.054.86$146
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 202103777.435.24$194
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210370.783.98$12
Jun 202102469.493.38$81
May 20210063.483.02$0
Apr 202101,25060.362.76$3,448
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 202104850.412.81$135
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 202004036.972.48$99
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200938.371.83$16
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202001,62514.751.80$2,932
Mar 20200030.341.86$0
Feb 202001649.881.98$32
Jan 202003057.252.09$63
Dec 20190859.012.30$18
Nov 20190055.302.75$0
Oct 201903353.472.42$80
Sep 20190755.052.66$19
Aug 20190753.112.30$16
Jul 20190856.272.46$20
Jun 201902552.782.49$62
May 20190058.482.74$0
Apr 201903162.632.75$85
Mar 201901456.803.06$43
Feb 2019037250.852.79$1,039
Jan 20190046.033.23$0
Dec 201804846.594.19$201
Nov 20180352.934.24$13
Oct 2018020961.443.40$710
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 201801660.183.08$49
May 201803465.382.90$99
Apr 20180063.842.90$0
Mar 201803261.222.79$89
Feb 201803261.782.77$89
Jan 201804662.874.01$184
Dec 20170057.272.92$0
Nov 201703755.423.12$115
Oct 20170049.292.98$0
Sep 201703447.523.09$105
Aug 20170045.373.00$0
Jul 201701943.873.09$59
Jun 201702542.493.09$77
May 201702345.373.26$75
Apr 201703247.933.21$103
Mar 201705946.772.98$176
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 201603648.763.72$134
Nov 20160042.492.64$0
Oct 201604046.193.09$124
Sep 20160541.553.10$16
Aug 20160841.442.92$23
Jul 2016091041.622.92$2,661
Jun 201601945.352.69$51
May 20160542.521.99$10
Apr 20160036.561.99$0
Mar 201602333.011.79$41
Feb 201601826.472.06$37
Jan 201601627.352.36$38
Dec 201501932.362.00$38
Nov 2015029838.792.17$646
Oct 201502043.552.43$49
Sep 201501442.992.76$39
Aug 201501640.162.87$46
Jul 201513548.152.95$151
Jun 201501756.152.88$49
May 201502555.212.96$74
Apr 201503049.822.71$81
Mar 201503642.892.93$106
Feb 201521544.662.98$134
Jan 201509943.433.10$307
Dec 20140254.693.59$7
Nov 20140070.464.25$0
Oct 201401778.303.90$66
Sep 201403086.164.05$121
Aug 201406089.394.04$242
Jul 201401196.564.18$46
Jun 201432998.164.74$432
May 201403994.734.73$184
Apr 201406295.944.81$298
Mar 201402395.895.06$116
Feb 201406097.406.19$372
Jan 201403290.404.86$156
Dec 201306191.824.35$266
Nov 201304688.853.74$172
Oct 201308397.423.78$314
Sep 2013037104.113.72$138
Aug 2013043104.253.52$151
Jul 2013039102.523.72$145
Jun 201305294.403.93$205
May 201306394.834.15$261
Apr 201307093.964.28$300
Mar 201306793.623.91$262
Feb 2013010691.233.42$363
Jan 201305191.603.42$174
Dec 201204186.773.42$140
Nov 201205086.953.62$181
Oct 201207289.383.40$245
Sep 201209894.672.92$286
Aug 201202692.662.91$76
Jul 201205785.133.02$172
Jun 201205279.822.52$131
May 201207791.612.49$192
Apr 2012054101.652.00$108
Mar 2012075105.052.22$167
Feb 2012030101.102.57$77
Jan 201204998.092.73$134
Dec 201103796.873.24$120
Nov 201103695.723.31$119
Oct 201107384.983.65$266
Sep 201104283.623.99$167
Aug 201104783.404.15$195
Jul 201105694.144.52$253
Jun 201103492.904.64$158
May 20110898.134.40$35
Apr 2011032105.964.33$139
Mar 20110096.364.06$0
Feb 20110185.644.18$4
Jan 201104086.504.59$184
Dec 201003685.734.35$157
Nov 201006980.843.80$262
Oct 201002778.103.51$95
Sep 201001572.633.98$60
Aug 201008173.684.42$358
Jul 201003572.554.74$166
Jun 2010013370.364.91$653
May 2010023771.124.24$1,004
Apr 2010025181.694.12$1,035
Mar 2010026578.394.39$1,163
Feb 20102526873.585.44$3,298
Jan 2010028374.365.96$1,688
Dec 2009024271.445.48$1,327
Nov 20096869774.593.75$7,687
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009036567.423.22$1,175
Jul 2009039361.133.46$1,362
Jun 2009041666.163.90$1,620
May 2009042054.743.93$1,649
Apr 2009043946.773.59$1,575
Mar 2009047242.144.06$1,916
Feb 2009045632.814.63$2,113
Jan 2009028735.865.37$1,541
Dec 2008035237.105.98$2,104
Nov 2008047955.496.86$3,286
Oct 2008058975.246.92$4,077
Sep 20080619101.767.88$4,876
Aug 20080744114.228.48$6,311
Jul 20080814131.0811.39$9,271
Jun 20080945131.3313.03$12,316
May 20080676123.1711.57$7,824
Apr 20080256110.3110.45$2,676
Mar 2008064101.909.66$619
Feb 200806692.538.77$579
Jan 200806690.388.21$542
Dec 200707188.337.30$518
Nov 20070991.677.29$66
Oct 200707282.856.92$498
Sep 2007017275.846.24$1,074
Aug 2007014769.066.39$939
Jul 200709670.906.39$613
Jun 2007013162.007.55$989
May 2007019458.747.85$1,522
Apr 2007033859.617.81$2,638
Mar 2007058056.927.30$4,235
Feb 2007096355.108.22$7,912
Jan 2007082550.306.73$5,550
Dec 200601,93756.656.92$13,401

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.13 =         $0
Gas                    4 Mcf  × $  8.00 =        $32

────────────────────────────────────────────────────
Month total                                      $32

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/228384 is the state's own key, not one this site invented.