Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229244District 7CField 812673332 tax incentive programmesGasSaveExport
Value, all time
$555 k
Oct 2006 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
236
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-12178204
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction109,234 Mcf$555,270
Total$555,270

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4197, -100.8705. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41974, -100.87052 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,300 ft.

Completions filed
Oct 2006
1 of 1 wells

1 well

42-4353810839,300 ftOct 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 20260106.413.05$0
Apr 20263498.932.87$98
Mar 2026089.753.15$0
Feb 202620863.503.75$780
Jan 202626659.138.00$2,127
Dec 202523156.664.41$1,019
Nov 202515858.593.93$620
Oct 202521759.383.30$717
Sep 202521562.743.08$662
Aug 202516563.933.01$497
Jul 202516566.743.32$547
Jun 202520166.483.13$629
May 202517760.553.23$572
Apr 202523162.363.54$818
Mar 202519667.704.27$837
Feb 202520970.884.34$907
Jan 202525074.324.28$1,070
Dec 202419568.993.12$609
Nov 202421269.052.20$466
Oct 202422671.372.28$516
Sep 202419069.612.36$449
Aug 202416875.632.06$347
Jul 202420679.932.15$442
Jun 202414678.082.63$385
May 202428178.812.20$618
Apr 202431084.451.66$514
Mar 202467480.301.55$1,041
Feb 202466376.091.78$1,183
Jan 202449773.023.30$1,639
Dec 202349071.262.61$1,279
Nov 202349277.892.81$1,381
Oct 202363985.443.09$1,973
Sep 202351889.042.74$1,417
Aug 202332280.522.67$861
Jul 202333374.852.64$880
Jun 202332668.962.26$736
May 202334070.622.23$757
Apr 202330178.122.24$674
Mar 202333172.852.39$792
Feb 202333775.112.47$831
Jan 202349376.533.39$1,670
Dec 20226576.415.73$372
Nov 20227385.005.65$412
Oct 20222687.185.86$152
Sep 20222984.888.16$237
Aug 20221894.529.13$164
Jul 202248101.587.54$362
Jun 202263115.097.98$503
May 202276109.378.43$641
Apr 202271104.226.84$485
Mar 202277108.885.08$391
Feb 20227591.054.86$364
Jan 20229981.844.54$449
Dec 20218471.323.90$328
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021166.024.22$4
Jul 2021170.783.98$4
Jun 2021369.493.38$10
May 20215163.483.02$154
Apr 202111260.362.76$309
Mar 202112861.302.72$348
Feb 202111257.805.55$621
Jan 202110950.412.81$306
Dec 20205644.642.68$150
Nov 2020338.772.71$8
Oct 2020636.972.48$15
Sep 20202137.091.99$42
Aug 20202339.982.39$55
Jul 2020838.371.83$15
Jun 20202434.901.69$41
May 20204316.921.81$78
Apr 202016314.751.80$294
Mar 202026430.341.86$490
Feb 202025449.881.98$503
Jan 202023957.252.09$501
Dec 201923059.012.30$530
Nov 201937655.302.75$1,034
Oct 201930353.472.42$733
Sep 201922855.052.66$606
Aug 201932653.112.30$751
Jul 201937156.272.46$913
Jun 201944752.782.49$1,114
May 201940658.482.74$1,113
Apr 201933262.632.75$913
Mar 201933956.803.06$1,038
Feb 201942350.852.79$1,181
Jan 201924946.033.23$804
Dec 201821746.594.19$908
Nov 201822352.934.24$945
Oct 201824161.443.40$819
Sep 201820059.543.11$622
Aug 201818359.403.07$561
Jul 201843965.142.93$1,287
Jun 201830960.183.08$951
May 201817865.382.90$516
Apr 201814163.842.90$409
Mar 201830661.222.79$853
Feb 201839361.782.77$1,087
Jan 201832162.874.01$1,287
Dec 201735357.272.92$1,031
Nov 201733855.423.12$1,054
Oct 201732849.292.98$979
Sep 201736147.523.09$1,115
Aug 201747545.373.00$1,427
Jul 201745843.873.09$1,414
Jun 201753242.493.09$1,642
May 201757245.373.26$1,867
Apr 201763147.933.21$2,027
Mar 201746846.772.98$1,396
Feb 2017050.452.95$0
Jan 201744649.413.42$1,525
Dec 201655748.763.72$2,074
Nov 201656642.492.64$1,497
Oct 201664046.193.09$1,978
Sep 201664241.553.10$1,991
Aug 201668241.442.92$1,994
Jul 201669441.622.92$2,029
Jun 201665945.352.69$1,770
May 201670142.521.99$1,396
Apr 201669036.561.99$1,374
Mar 201673133.011.79$1,311
Feb 201672326.472.06$1,492
Jan 201683027.352.36$1,962
Dec 201582632.362.00$1,653
Nov 201569938.792.17$1,515
Oct 201542543.552.43$1,031
Sep 2015942.992.76$25
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 20153844.662.98$113
Jan 2015043.433.10$0
Dec 20141454.693.59$50
Nov 2014370.464.25$13
Oct 20144978.303.90$191
Sep 2014086.164.05$0
Aug 20141689.394.04$65
Jul 2014096.564.18$0
Jun 20143098.164.74$142
May 20143694.734.73$170
Apr 20145195.944.81$245
Mar 2014295.895.06$10
Feb 20142597.406.19$155
Jan 201419190.404.86$928
Dec 201316691.824.35$723
Nov 201319688.853.74$733
Oct 201322097.423.78$831
Sep 2013243104.113.72$903
Aug 2013376104.253.52$1,325
Jul 201320102.523.72$74
Jun 20133894.403.93$149
May 20136094.834.15$249
Apr 20137993.964.28$338
Mar 201310593.623.91$411
Feb 201311691.233.42$397
Jan 201314991.603.42$510
Dec 201217486.773.42$595
Nov 201219386.953.62$700
Oct 201222789.383.40$772
Sep 201224894.672.92$724
Aug 201228092.662.91$814
Jul 201229685.133.02$894
Jun 201231379.822.52$788
May 201235791.612.49$888
Apr 2012390101.652.00$779
Mar 2012402105.052.22$893
Feb 2012502101.102.57$1,290
Jan 201257498.092.73$1,569
Dec 201159096.873.24$1,911
Nov 201152295.723.31$1,728
Oct 201164284.983.65$2,342
Sep 201149383.623.99$1,965
Aug 201143683.404.15$1,809
Jul 201157894.144.52$2,611
Jun 201149492.904.64$2,292
May 201148098.134.40$2,114
Apr 2011494105.964.33$2,141
Mar 201154296.364.06$2,199
Feb 201148585.644.18$2,027
Jan 201161986.504.59$2,840
Dec 201039985.734.35$1,735
Nov 201040680.843.80$1,541
Oct 201050078.103.51$1,754
Sep 201039572.633.98$1,572
Aug 201063573.684.42$2,806
Jul 201058172.554.74$2,752
Jun 201066770.364.91$3,275
May 201082871.124.24$3,507
Apr 201084781.694.12$3,492
Mar 201093578.394.39$4,103
Feb 201085273.585.44$4,637
Jan 201093674.365.96$5,582
Dec 200994571.445.48$5,182
Nov 200988574.593.75$3,320
Oct 200984372.544.11$3,465
Sep 200986065.543.06$2,636
Aug 200990767.423.22$2,919
Jul 200985261.133.46$2,952
Jun 200995566.163.90$3,720
May 200986454.743.93$3,392
Apr 200983746.773.59$3,003
Mar 20091,01742.144.06$4,128
Feb 200988632.814.63$4,105
Jan 200996435.865.37$5,178
Dec 20081,03537.105.98$6,186
Nov 200899455.496.86$6,819
Oct 20081,04275.246.92$7,213
Sep 2008986101.767.88$7,767
Aug 20081,092114.228.48$9,263
Jul 20081,132131.0811.39$12,893
Jun 20081,185131.3313.03$15,444
May 20081,292123.1711.57$14,954
Apr 20081,268110.3110.45$13,257
Mar 20081,333101.909.66$12,882
Feb 20081,29892.538.77$11,384
Jan 20081,42990.388.21$11,726
Dec 20071,46388.337.30$10,683
Nov 20071,47991.677.29$10,784
Oct 20071,45682.856.92$10,078
Sep 20071,48375.846.24$9,260
Aug 20071,63269.066.39$10,425
Jul 20071,61170.906.39$10,291
Jun 20071,66362.007.55$12,553
May 20071,82258.747.85$14,296
Apr 20071,87359.617.81$14,619
Mar 20071,98656.927.30$14,502
Feb 20071,93155.108.22$15,865
Jan 20072,17350.306.73$14,617
Dec 20062,35256.656.92$16,272
Nov 20062,23154.207.62$16,995
Oct 20062,38854.906.01$14,361

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Gas                   34 Mcf  × $  2.87 =        $98

────────────────────────────────────────────────────
Month total                                      $98

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/229244 is the state's own key, not one this site invented.