SHURLEY 147

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229552District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$405 k
Nov 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-10-19178189
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition379 bbl$29,028
GasProduction65,797 Mcf$375,863
Total$404,891

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4618, -100.7319. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46181, -100.73191 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,309 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,309 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-43537758237,309 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220285.005.65$11
Oct 20220187.185.86$6
Sep 20220184.888.16$8
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 202202104.226.84$14
Mar 202200108.885.08$0
Feb 20220191.054.86$5
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210279.795.71$11
Sep 20210369.865.35$16
Aug 20210266.024.22$8
Jul 20210370.783.98$12
Jun 20210369.493.38$10
May 20210263.483.02$6
Apr 20210160.362.76$3
Mar 202106661.302.72$179
Feb 202106157.805.55$338
Jan 2021012750.412.81$357
Dec 2020013544.642.68$361
Nov 2020013638.772.71$368
Oct 2020015436.972.48$382
Sep 2020014637.091.99$291
Aug 2020016139.982.39$384
Jul 2020015738.371.83$287
Jun 2020020834.901.69$352
May 202003816.921.81$69
Apr 202002014.751.80$36
Mar 2020016730.341.86$310
Feb 2020019049.881.98$376
Jan 2020022257.252.09$465
Dec 2019023959.012.30$551
Nov 2019028555.302.75$784
Oct 2019031353.472.42$757
Sep 2019030855.052.66$818
Aug 2019034653.112.30$797
Jul 2019043156.272.46$1,060
Jun 2019053152.782.49$1,323
May 2019020358.482.74$556
Apr 20190462.632.75$11
Mar 201901156.803.06$34
Feb 20190050.852.79$0
Jan 20190146.033.23$3
Dec 201801046.594.19$42
Nov 20180452.934.24$17
Oct 20180361.443.40$10
Sep 20180159.543.11$3
Aug 20180459.403.07$12
Jul 20180365.142.93$9
Jun 20180460.183.08$12
May 20180665.382.90$17
Apr 20180163.842.90$3
Mar 20180461.222.79$11
Feb 20180361.782.77$8
Jan 20180462.874.01$16
Dec 20170657.272.92$18
Nov 20170455.423.12$12
Oct 20170449.292.98$12
Sep 20170247.523.09$6
Aug 20170745.373.00$21
Jul 20170343.873.09$9
Jun 20170942.493.09$28
May 201704345.373.26$140
Apr 20170547.933.21$16
Mar 20170246.772.98$6
Feb 2017014450.452.95$425
Jan 20170249.413.42$7
Dec 20160748.763.72$26
Nov 201601342.492.64$34
Oct 201601346.193.09$40
Sep 20160341.553.10$9
Aug 20160241.442.92$6
Jul 201601741.622.92$50
Jun 201601345.352.69$35
May 201601442.521.99$28
Apr 201602536.561.99$50
Mar 201602833.011.79$50
Feb 201603926.472.06$80
Jan 201603727.352.36$87
Dec 201502832.362.00$56
Nov 201519038.792.17$234
Oct 2015123543.552.43$614
Sep 2015125142.992.76$735
Aug 2015124940.162.87$755
Jul 2015225748.152.95$853
Jun 2015124656.152.88$765
May 2015126955.212.96$850
Apr 2015126149.822.71$756
Mar 2015328442.892.93$962
Feb 2015127144.662.98$851
Jan 2015332243.433.10$1,129
Dec 2014239854.693.59$1,539
Nov 201404270.464.25$179
Oct 201414578.303.90$254
Sep 2014115586.164.05$713
Aug 2014117789.394.04$804
Jul 2014020996.564.18$874
Jun 2014125398.164.74$1,297
May 2014226294.734.73$1,428
Apr 2014228595.944.81$1,562
Mar 2014121095.895.06$1,158
Feb 2014224197.406.19$1,687
Jan 2014227390.404.86$1,508
Dec 2013127391.824.35$1,281
Nov 2013226788.853.74$1,176
Oct 2013229197.423.78$1,295
Sep 20131279104.113.72$1,141
Aug 20130235104.253.52$828
Jul 2013050102.523.72$186
Jun 201305094.403.93$197
May 201306094.834.15$249
Apr 201316193.964.28$355
Mar 201306893.623.91$266
Feb 201317891.233.42$358
Jan 201319291.603.42$406
Dec 201219786.773.42$419
Nov 201219786.953.62$439
Oct 2012110589.383.40$446
Sep 2012011894.672.92$344
Aug 20120192.662.91$3
Jul 201214785.133.02$227
Jun 2012111779.822.52$375
May 2012018491.612.49$458
Apr 2012158101.652.00$217
Mar 20123322105.052.22$1,031
Feb 20122475101.102.57$1,423
Jan 2012351098.092.73$1,689
Dec 2011247596.873.24$1,733
Nov 2011221395.723.31$897
Oct 2011225384.983.65$1,093
Sep 2011126683.623.99$1,144
Aug 2011229483.404.15$1,387
Jul 2011239594.144.52$1,973
Jun 2011344792.904.64$2,353
May 2011357398.134.40$2,818
Apr 20114514105.964.33$2,651
Mar 2011466896.364.06$3,096
Feb 2011237185.644.18$1,722
Jan 2011452086.504.59$2,732
Dec 2010340085.734.35$1,996
Nov 2010334680.843.80$1,556
Oct 2010352178.103.51$2,062
Sep 2010464972.633.98$2,873
Aug 2010366773.684.42$3,169
Jul 2010346872.554.74$2,434
Jun 2010242070.364.91$2,203
May 2010450271.124.24$2,411
Apr 2010564381.694.12$3,059
Mar 2010568178.394.39$3,381
Feb 2010563973.585.44$3,846
Jan 2010673874.365.96$4,848
Dec 2009579871.445.48$4,733
Nov 2009675374.593.75$3,272
Oct 2009378772.544.11$3,452
Sep 2009474765.543.06$2,552
Aug 2009484567.423.22$2,989
Jul 2009882061.133.46$3,330
Jun 2009378066.163.90$3,237
May 2009101,05254.743.93$4,677
Apr 2009879446.773.59$3,223
Mar 2009893042.144.06$4,112
Feb 2009488232.814.63$4,218
Jan 2009895935.865.37$5,438
Dec 2008895537.105.98$6,005
Nov 200881,01655.496.86$7,414
Oct 2008101,08375.246.92$8,249
Sep 2008111,018101.767.88$9,138
Aug 200871,091114.228.48$10,055
Jul 200841,124131.0811.39$13,326
Jun 200891,145131.3313.03$16,104
May 200881,230123.1711.57$15,222
Apr 200881,092110.3110.45$12,299
Mar 200861,012101.909.66$10,391
Feb 2008895392.538.77$9,099
Jan 2008480090.388.21$6,926
Dec 2007583888.337.30$6,561
Nov 2007970591.677.29$5,966
Oct 2007664982.856.92$4,989
Sep 2007572175.846.24$4,881
Aug 2007389369.066.39$5,912
Jul 2007111,17570.906.39$8,286
Jun 2007395562.007.55$7,395
May 200771,35158.747.85$11,012
Apr 200771,50159.617.81$12,133
Mar 200761,67256.927.30$12,550
Feb 200781,69655.108.22$14,375
Jan 200771,72950.306.73$11,983
Dec 200682,47256.656.92$17,556
Nov 2006168454.207.62$5,265

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 75.11 =         $0
Gas                    1 Mcf  × $  2.47 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/229552 is the state's own key, not one this site invented.