SHURLEY 99

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230197District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$218 k
Feb 2007 – May 2026
Value, last 12 filed months
$942
at the published price for each month
Months reported
232
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-01-22175991
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition46 bbl$3,398
GasProduction37,138 Mcf$214,191
Total$217,589

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5338, -100.6752. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53379, -100.67515 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,525 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,525 ft.

Completions filed
Feb 2007
1 of 1 wells

1 well

42-43538205216,525 ftFeb 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (232)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

232 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 202601459.138.00$112
Dec 202503256.664.41$141
Nov 202503558.593.93$137
Oct 202503759.383.30$122
Sep 202503762.743.08$114
Aug 202503363.933.01$99
Jul 202503366.743.32$109
Jun 202503466.483.13$106
May 202503660.553.23$116
Apr 202503662.363.54$128
Mar 202502767.704.27$115
Feb 202502870.884.34$122
Jan 202502574.324.28$107
Dec 202402568.993.12$78
Nov 202402569.052.20$55
Oct 202403071.372.28$68
Sep 202402369.612.36$54
Aug 202401475.632.06$29
Jul 202402279.932.15$47
Jun 202402078.082.63$53
May 202401278.812.20$26
Apr 20240984.451.66$15
Mar 202401880.301.55$28
Feb 202403176.091.78$55
Jan 202403173.023.30$102
Dec 202303371.262.61$86
Nov 202303177.892.81$87
Oct 202302385.443.09$71
Sep 202303689.042.74$98
Aug 202303780.522.67$99
Jul 202302574.852.64$66
Jun 202301068.962.26$23
May 202302470.622.23$53
Apr 20230878.122.24$18
Mar 202301472.852.39$34
Feb 202302575.112.47$62
Jan 202304176.533.39$139
Dec 202204276.415.73$241
Nov 202203985.005.65$220
Oct 202204387.185.86$252
Sep 202204384.888.16$351
Aug 202204294.529.13$383
Jul 2022041101.587.54$309
Jun 2022038115.097.98$303
May 2022039109.378.43$329
Apr 2022141104.226.84$385
Mar 2022041108.885.08$208
Feb 202203791.054.86$180
Jan 202204181.844.54$186
Dec 202103471.323.90$133
Nov 202103977.435.24$204
Oct 202104479.795.71$251
Sep 202104469.865.35$235
Aug 202104566.024.22$190
Jul 202104570.783.98$179
Jun 202102369.493.38$78
May 202103863.483.02$115
Apr 202103760.362.76$102
Mar 202103761.302.72$101
Feb 202102457.805.55$133
Jan 202103750.412.81$104
Dec 202004044.642.68$107
Nov 202003838.772.71$103
Oct 202004136.972.48$102
Sep 202003937.091.99$78
Aug 202004439.982.39$105
Jul 202001738.371.83$31
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202001214.751.80$22
Mar 20200030.341.86$0
Feb 202001449.881.98$28
Jan 20200057.252.09$0
Dec 201901559.012.30$35
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190555.052.66$13
Aug 20190253.112.30$5
Jul 20190756.272.46$17
Jun 201903952.782.49$97
May 201904358.482.74$118
Apr 201902462.632.75$66
Mar 201901056.803.06$31
Feb 20190650.852.79$17
Jan 201903146.033.23$100
Dec 201805446.594.19$226
Nov 201802952.934.24$123
Oct 201804461.443.40$150
Sep 201804659.543.11$143
Aug 201804859.403.07$147
Jul 201804765.142.93$138
Jun 201805060.183.08$154
May 201805165.382.90$148
Apr 201805663.842.90$162
Mar 201805561.222.79$153
Feb 201805061.782.77$138
Jan 201805862.874.01$233
Dec 201705457.272.92$158
Nov 201705655.423.12$175
Oct 201705949.292.98$176
Sep 201705247.523.09$161
Aug 201706145.373.00$183
Jul 201705943.873.09$182
Jun 201705742.493.09$176
May 201706445.373.26$209
Apr 201706047.933.21$193
Mar 201705746.772.98$170
Feb 201705450.452.95$159
Jan 201706149.413.42$209
Dec 201605148.763.72$190
Nov 201605642.492.64$148
Oct 201626446.193.09$290
Sep 201605541.553.10$171
Aug 201606141.442.92$178
Jul 201606441.622.92$187
Jun 201636045.352.69$297
May 201606842.521.99$135
Apr 201607036.561.99$139
Mar 201606833.011.79$122
Feb 201607026.472.06$144
Jan 201644427.352.36$213
Dec 201502732.362.00$54
Nov 201502538.792.17$54
Oct 201503243.552.43$78
Sep 201502942.992.76$80
Aug 201513240.162.87$132
Jul 201503048.152.95$88
Jun 201503756.152.88$107
May 201503555.212.96$103
Apr 201503649.822.71$97
Mar 201503542.892.93$103
Feb 201503644.662.98$107
Jan 201503843.433.10$118
Dec 201402854.693.59$101
Nov 201403070.464.25$128
Oct 201403878.303.90$148
Sep 201401286.164.05$49
Aug 20140989.394.04$36
Jul 201402696.564.18$109
Jun 201406798.164.74$317
May 201406694.734.73$312
Apr 201406595.944.81$313
Mar 201404495.895.06$223
Feb 201407797.406.19$477
Jan 201407790.404.86$374
Dec 201306191.824.35$266
Nov 201307688.853.74$284
Oct 201308197.423.78$306
Sep 2013083104.113.72$309
Aug 2013085104.253.52$299
Jul 2013085102.523.72$316
Jun 201308494.403.93$330
May 201309494.834.15$390
Apr 201309493.964.28$403
Mar 2013010093.623.91$391
Feb 201309991.233.42$339
Jan 2013010991.603.42$373
Dec 2012011186.773.42$380
Nov 2012012986.953.62$468
Oct 2012015789.383.40$534
Sep 2012021794.672.92$633
Aug 2012029192.662.91$846
Jul 2012029785.133.02$897
Jun 2012027679.822.52$695
May 2012028291.612.49$702
Apr 20120262101.652.00$523
Mar 20120267105.052.22$593
Feb 20120168101.102.57$432
Jan 2012013798.092.73$375
Dec 2011014796.873.24$476
Nov 2011017495.723.31$576
Oct 2011027684.983.65$1,007
Sep 2011030183.623.99$1,200
Aug 2011020683.404.15$855
Jul 2011018694.144.52$840
Jun 2011024092.904.64$1,114
May 2011034898.134.40$1,533
Apr 20110282105.964.33$1,222
Mar 2011030096.364.06$1,217
Feb 2011031985.644.18$1,333
Jan 2011037786.504.59$1,730
Dec 2010042285.734.35$1,835
Nov 2010043380.843.80$1,643
Oct 2010045778.103.51$1,604
Sep 2010041872.633.98$1,663
Aug 2010041273.684.42$1,821
Jul 2010040072.554.74$1,895
Jun 2010040070.364.91$1,964
May 2010038971.124.24$1,648
Apr 2010037081.694.12$1,525
Mar 2010037178.394.39$1,628
Feb 2010034073.585.44$1,850
Jan 2010044174.365.96$2,630
Dec 2009042271.445.48$2,314
Nov 2009024774.593.75$927
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009045467.423.22$1,461
Jul 2009035761.133.46$1,237
Jun 2009035666.163.90$1,387
May 2009042354.743.93$1,661
Apr 2009037146.773.59$1,331
Mar 2009045342.144.06$1,839
Feb 2009042732.814.63$1,978
Jan 2009051735.865.37$2,777
Dec 2008051237.105.98$3,060
Nov 2008052855.496.86$3,622
Oct 2008057375.246.92$3,966
Sep 20080597101.767.88$4,703
Aug 20080656114.228.48$5,565
Jul 20080687131.0811.39$7,825
Jun 20081659131.3313.03$8,720
May 20082700123.1711.57$8,348
Apr 20083704110.3110.45$7,691
Mar 20082762101.909.66$7,568
Feb 2008371892.538.77$6,575
Jan 2008377390.388.21$6,614
Dec 2007182288.337.30$6,091
Nov 2007276791.677.29$5,776
Oct 2007263282.856.92$4,540
Sep 2007271175.846.24$4,591
Aug 2007174969.066.39$4,854
Jul 2007265970.906.39$4,351
Jun 2007278162.007.55$6,019
May 2007497458.747.85$7,877
Apr 2007498859.617.81$7,950
Mar 2007194156.927.30$6,928
Feb 2007028555.108.22$2,342

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.13 =         $0
Gas                   14 Mcf  × $  8.00 =       $112

────────────────────────────────────────────────────
Month total                                     $112

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/230197 is the state's own key, not one this site invented.