Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230490District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$389 k
Jul 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-11-26176626
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition184 bbl$14,492
GasProduction74,936 Mcf$374,084
Total$388,576

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4231, -100.6424. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42306, -100.64241 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-43538255146,300 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230285.443.09$6
Sep 202303089.042.74$82
Aug 202302980.522.67$78
Jul 202304274.852.64$111
Jun 202305468.962.26$122
May 202306270.622.23$138
Apr 202304978.122.24$110
Mar 202304472.852.39$105
Feb 202304575.112.47$111
Jan 202304876.533.39$163
Dec 202205076.415.73$286
Nov 202205385.005.65$299
Oct 202205187.185.86$299
Sep 202204884.888.16$392
Aug 202205294.529.13$475
Jul 2022060101.587.54$453
Jun 2022040115.097.98$319
May 2022045109.378.43$379
Apr 2022039104.226.84$267
Mar 2022058108.885.08$294
Feb 202207291.054.86$350
Jan 202206581.844.54$295
Dec 202107371.323.90$285
Nov 202107677.435.24$398
Oct 202109679.795.71$549
Sep 2021011469.865.35$610
Aug 202107266.024.22$304
Jul 202108570.783.98$338
Jun 2021010169.493.38$341
May 202108963.483.02$269
Apr 2021012160.362.76$334
Mar 202109761.302.72$264
Feb 2021011657.805.55$644
Jan 202109550.412.81$267
Dec 202009344.642.68$249
Nov 202009038.772.71$244
Oct 202009236.972.48$228
Sep 202008937.091.99$177
Aug 2020010839.982.39$258
Jul 2020014238.371.83$259
Jun 2020012734.901.69$215
May 2020013416.921.81$243
Apr 2020014614.751.80$263
Mar 2020016330.341.86$303
Feb 202009949.881.98$196
Jan 202009457.252.09$197
Dec 2019010359.012.30$237
Nov 2019010355.302.75$283
Oct 2019010953.472.42$264
Sep 2019022055.052.66$585
Aug 2019025653.112.30$590
Jul 2019017056.272.46$418
Jun 2019022952.782.49$570
May 2019024958.482.74$682
Apr 2019013762.632.75$377
Mar 2019014456.803.06$441
Feb 2019018150.852.79$505
Jan 2019026446.033.23$852
Dec 2018027446.594.19$1,147
Nov 2018031252.934.24$1,322
Oct 2018018061.443.40$612
Sep 2018017959.543.11$556
Aug 2018030559.403.07$935
Jul 2018030265.142.93$885
Jun 2018020860.183.08$640
May 2018020965.382.90$606
Apr 2018011863.842.90$342
Mar 2018014861.222.79$412
Feb 2018013561.782.77$373
Jan 2018015262.874.01$609
Dec 2017018957.272.92$552
Nov 2017020755.423.12$646
Oct 2017020849.292.98$621
Sep 2017020347.523.09$627
Aug 2017023145.373.00$694
Jul 2017025343.873.09$781
Jun 2017022042.493.09$679
May 2017022245.373.26$724
Apr 2017022847.933.21$732
Mar 2017023346.772.98$695
Feb 2017020150.452.95$593
Jan 2017022149.413.42$756
Dec 2016022248.763.72$826
Nov 2016023442.492.64$619
Oct 2016023846.193.09$735
Sep 2016023041.553.10$713
Aug 2016024241.442.92$708
Jul 2016029041.622.92$848
Jun 2016020745.352.69$556
May 2016020942.521.99$416
Apr 2016019936.561.99$396
Mar 2016018333.011.79$328
Feb 2016116826.472.06$373
Jan 2016121527.352.36$536
Dec 2015023532.362.00$470
Nov 2015021938.792.17$475
Oct 2015423543.552.43$744
Sep 2015023442.992.76$645
Aug 2015030340.162.87$870
Jul 2015033448.152.95$984
Jun 2015330356.152.88$1,042
May 2015032455.212.96$958
Apr 2015030049.822.71$812
Mar 2015330442.892.93$1,021
Feb 2015026344.662.98$783
Jan 2015032243.433.10$998
Dec 2014330154.693.59$1,245
Nov 2014030670.464.25$1,301
Oct 2014032578.303.90$1,268
Sep 2014032486.164.05$1,311
Aug 2014031889.394.04$1,283
Jul 2014033496.564.18$1,396
Jun 2014033698.164.74$1,592
May 2014037094.734.73$1,749
Apr 2014337995.944.81$2,110
Mar 2014035795.895.06$1,805
Feb 2014031997.406.19$1,975
Jan 2014435890.404.86$2,102
Dec 2013038891.824.35$1,690
Nov 2013036588.853.74$1,364
Oct 2013334597.423.78$1,596
Sep 20130284104.113.72$1,056
Aug 20130295104.253.52$1,039
Jul 20130339102.523.72$1,260
Jun 2013334594.403.93$1,640
May 2013034294.834.15$1,419
Apr 2013034993.964.28$1,495
Mar 2013335593.623.91$1,670
Feb 2013033591.233.42$1,146
Jan 2013330991.603.42$1,332
Dec 2012026586.773.42$906
Nov 2012327986.953.62$1,272
Oct 2012032889.383.40$1,115
Sep 2012335294.672.92$1,311
Aug 2012042692.662.91$1,239
Jul 2012046385.133.02$1,399
Jun 2012049179.822.52$1,237
May 2012037291.612.49$926
Apr 20120386101.652.00$771
Mar 20122397105.052.22$1,092
Feb 20120470101.102.57$1,208
Jan 2012040798.092.73$1,113
Dec 2011242296.873.24$1,561
Nov 2011340695.723.31$1,632
Oct 2011051484.983.65$1,875
Sep 2011455783.623.99$2,555
Aug 2011067483.404.15$2,797
Jul 2011379294.144.52$3,860
Jun 2011045392.904.64$2,102
May 2011344198.134.40$2,237
Apr 20113458105.964.33$2,303
Mar 2011049396.364.06$2,000
Feb 2011445585.644.18$2,244
Jan 2011057386.504.59$2,629
Dec 2010061085.734.35$2,652
Nov 2010350180.843.80$2,144
Oct 2010460378.103.51$2,428
Sep 2010064772.633.98$2,575
Aug 2010472673.684.42$3,503
Jul 2010071672.554.74$3,391
Jun 2010471770.364.91$3,802
May 2010462271.124.24$2,919
Apr 2010070081.694.12$2,886
Mar 2010481378.394.39$3,882
Feb 2010066473.585.44$3,614
Jan 2010058374.365.96$3,477
Dec 2009360071.445.48$3,505
Nov 2009061574.593.75$2,307
Oct 2009363272.544.11$2,815
Sep 2009464665.543.06$2,242
Aug 2009075067.423.22$2,414
Jul 2009476561.133.46$2,895
Jun 2009075766.163.90$2,949
May 2009381354.743.93$3,356
Apr 2009370746.773.59$2,677
Mar 2009479042.144.06$3,375
Feb 2009471732.814.63$3,453
Jan 2009393235.865.37$5,113
Dec 2008372037.105.98$4,415
Nov 2008070455.496.86$4,830
Oct 2008477575.246.92$5,665
Sep 20084834101.767.88$6,977
Aug 20084869114.228.48$7,829
Jul 20080930131.0811.39$10,592
Jun 20080943131.3313.03$12,290
May 200841,042123.1711.57$12,553
Apr 200841,017110.3110.45$11,074
Mar 200801,142101.909.66$11,036
Feb 200891,13192.538.77$10,752
Jan 200801,27890.388.21$10,487
Dec 200791,28088.337.30$10,141
Nov 200771,34691.677.29$10,456
Oct 200781,55982.856.92$11,454
Sep 200701,77875.846.24$11,102
Aug 200792,24269.066.39$14,943
Jul 200712,90270.906.39$18,609

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 85.44 =         $0
Gas                    2 Mcf  × $  3.09 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/230490 is the state's own key, not one this site invented.