SUGG "3"

Operated by COMPASS ENERGY OPERATING, LLC (P-5 169751) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 232529District 7CField 85279200NGPA filingCondensateGasSaveExport
Value, all time
$2.2 M
Aug 2007 – May 2026
Value, last 12 filed months
$28 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,461 leases and 22,481 wells, and the rule below applies to all of them.

Discovered
1904-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2016-03-08.

The Commission's schedule remark for this field reads: AREA) 85279200.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,002 bbl$244,817
GasProduction365,130 Mcf$1,926,487
Total$2,171,304

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4908, -101.0223. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.49076, -101.02229 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,200 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-23534080117,200 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 20260699106.413.05$2,129
Apr 2026366198.932.87$2,194
Mar 2026062189.753.15$1,956
Feb 2026050063.503.75$1,875
Jan 2026056859.138.00$4,543
Dec 2025460756.664.41$2,906
Nov 2025055758.593.93$2,187
Oct 2025052859.383.30$1,745
Sep 2025064362.743.08$1,978
Aug 2025069763.933.01$2,101
Jul 2025470566.743.32$2,604
Jun 2025069166.483.13$2,162
May 2025061160.553.23$1,975
Apr 2025666362.363.54$2,723
Mar 2025067767.704.27$2,890
Feb 2025969670.884.34$3,659
Jan 20251773974.324.28$4,425
Dec 2024097668.993.12$3,046
Nov 20241384169.052.20$2,747
Oct 20241558971.372.28$2,414
Sep 2024023769.612.36$560
Aug 2024039775.632.06$819
Jul 2024038879.932.15$833
Jun 20241436778.082.63$2,060
May 2024038278.812.20$840
Apr 2024036684.451.66$607
Mar 2024037080.301.55$572
Feb 20241435776.091.78$1,702
Jan 2024041673.023.30$1,372
Dec 2023042471.262.61$1,107
Nov 2023039777.892.81$1,115
Oct 20231245585.443.09$2,430
Sep 2023045489.042.74$1,242
Aug 2023047680.522.67$1,272
Jul 20231954774.852.64$2,867
Jun 2023053668.962.26$1,211
May 2023057870.622.23$1,287
Apr 2023759178.122.24$1,869
Mar 2023057972.852.39$1,386
Feb 2023046475.112.47$1,144
Jan 2023051776.533.39$1,751
Dec 20223553976.415.73$5,762
Nov 2022053685.005.65$3,026
Oct 2022055787.185.86$3,266
Sep 2022056184.888.16$4,580
Aug 2022058994.529.13$5,376
Jul 20220586101.587.54$4,420
Jun 20220562115.097.98$4,483
May 20220556109.378.43$4,689
Apr 20220521104.226.84$3,562
Mar 20220506108.885.08$2,569
Feb 2022046691.054.86$2,264
Jan 2022061181.844.54$2,773
Dec 20213560071.323.90$4,836
Nov 2021051177.435.24$2,676
Oct 2021046079.795.71$2,628
Sep 2021045969.865.35$2,456
Aug 2021052266.024.22$2,203
Jul 2021061570.783.98$2,449
Jun 2021060069.493.38$2,028
May 2021051463.483.02$1,551
Apr 20212067960.362.76$3,080
Mar 2021077561.302.72$2,106
Feb 2021052557.805.55$2,913
Jan 2021072950.412.81$2,049
Dec 2020075844.642.68$2,028
Nov 2020065838.772.71$1,781
Oct 2020068536.972.48$1,698
Sep 20201968637.091.99$2,071
Aug 2020075239.982.39$1,794
Jul 2020075638.371.83$1,380
Jun 2020070834.901.69$1,197
May 2020075116.921.81$1,363
Apr 2020067814.751.80$1,223
Mar 2020070830.341.86$1,314
Feb 2020067849.881.98$1,343
Jan 2020082557.252.09$1,728
Dec 20192780759.012.30$3,453
Nov 2019082455.302.75$2,267
Oct 2019086853.472.42$2,099
Sep 20190755.052.66$19
Aug 2019088353.112.30$2,035
Jul 2019080056.272.46$1,968
Jun 20192275552.782.49$3,042
May 2019071658.482.74$1,962
Apr 2019065462.632.75$1,799
Mar 2019076656.803.06$2,346
Feb 20191469050.852.79$2,639
Jan 2019078646.033.23$2,537
Dec 20181773446.594.19$3,864
Nov 2018065552.934.24$2,775
Oct 2018073661.443.40$2,501
Sep 20181174759.543.11$2,977
Aug 2018088759.403.07$2,720
Jul 2018097665.142.93$2,862
Jun 2018995760.183.08$3,486
May 2018096365.382.90$2,793
Apr 2018094363.842.90$2,735
Mar 2018597661.222.79$3,026
Feb 2018084161.782.77$2,326
Jan 2018690062.874.01$3,986
Dec 2017093857.272.92$2,740
Nov 2017991255.423.12$3,343
Oct 20171195649.292.98$3,395
Sep 2017095247.523.09$2,939
Aug 2017093645.373.00$2,812
Jul 20171390743.873.09$3,370
Jun 2017093542.493.09$2,887
May 2017141,05245.373.26$4,068
Apr 201701,05447.933.21$3,385
Mar 20171997646.772.98$3,801
Feb 2017087850.452.95$2,592
Jan 20171376349.413.42$3,251
Dec 20161176248.763.72$3,373
Nov 2016082342.492.64$2,176
Oct 2016081646.193.09$2,522
Sep 20161575541.553.10$2,964
Aug 2016092441.442.92$2,702
Jul 2016141,20941.622.92$4,118
Jun 2016095145.352.69$2,554
May 2016095842.521.99$1,907
Apr 20161878336.561.99$2,217
Mar 20161874533.011.79$1,931
Feb 2016071226.472.06$1,469
Jan 20161699827.352.36$2,797
Dec 2015096132.362.00$1,923
Nov 20151496738.792.17$2,639
Oct 201501,02843.552.43$2,495
Sep 2015141,02742.992.76$3,435
Aug 2015087040.162.87$2,499
Jul 2015684748.152.95$2,783
Jun 2015092156.152.88$2,655
May 2015583555.212.96$2,744
Apr 2015073249.822.71$1,981
Mar 2015439542.892.93$1,331
Feb 2015561744.662.98$2,060
Jan 2015064143.433.10$1,988
Dec 2014561254.693.59$2,471
Nov 2014575670.464.25$3,567
Oct 2014083378.303.90$3,250
Sep 2014582686.164.05$3,772
Aug 2014582689.394.04$3,780
Jul 2014085496.564.18$3,569
Jun 2014586398.164.74$4,579
May 2014592794.734.73$4,855
Apr 2014085495.944.81$4,107
Mar 2014591295.895.06$5,091
Feb 2014584597.406.19$5,719
Jan 2014496790.404.86$5,062
Dec 2013599691.824.35$4,796
Nov 2013596788.853.74$4,059
Oct 201351,07497.423.78$4,546
Sep 201301,059104.113.72$3,937
Aug 201351,147104.253.52$4,562
Jul 201351,135102.523.72$4,732
Jun 201351,14594.403.93$4,976
May 201361,25394.834.15$5,768
Apr 201381,24493.964.28$6,079
Mar 201391,44993.623.91$6,512
Feb 2013101,36391.233.42$5,574
Jan 201391,53091.603.42$6,057
Dec 201291,54486.773.42$6,062
Nov 201291,56186.953.62$6,441
Oct 201291,63289.383.40$6,353
Sep 201201,38494.672.92$4,039
Aug 2012101,46592.662.91$5,187
Jul 201291,55785.133.02$5,470
Jun 20121398179.822.52$3,509
May 2012191,77291.612.49$6,150
Apr 2012121,861101.652.00$4,936
Mar 2012121,788105.052.22$5,234
Feb 201291,675101.102.57$5,215
Jan 201251,86198.092.73$5,579
Dec 201151,90196.873.24$6,643
Nov 201181,91895.723.31$7,117
Oct 201142,26184.983.65$8,589
Sep 201152,29283.623.99$9,554
Aug 201172,37883.404.15$10,451
Jul 201192,43494.144.52$11,842
Jun 2011112,26592.904.64$11,531
May 2011132,32998.134.40$11,535
Apr 2011142,389105.964.33$11,836
Mar 2011212,36596.364.06$11,619
Feb 201132,01185.644.18$8,663
Jan 201132,21686.504.59$10,428
Dec 201062,44585.734.35$11,145
Nov 201042,58380.843.80$10,127
Oct 201062,89578.103.51$10,627
Sep 2010132,66472.633.98$11,546
Aug 201092,60473.684.42$12,171
Jul 2010122,73172.554.74$13,806
Jun 2010133,12770.364.91$16,270
May 2010233,36071.124.24$15,866
Apr 2010113,26381.694.12$14,351
Mar 2010153,28678.394.39$15,597
Feb 201082,85573.585.44$16,127
Jan 201073,32974.365.96$20,375
Dec 200983,40871.445.48$19,260
Nov 200993,41574.593.75$13,483
Oct 200963,47572.544.11$14,718
Sep 2009123,79565.543.06$12,417
Aug 2009134,09467.423.22$14,053
Jul 2009214,56061.133.46$17,082
Jun 2009255,24866.163.90$22,095
May 2009234,85954.743.93$20,334
Apr 2009214,26746.773.59$16,290
Mar 2009304,40542.144.06$19,144
Feb 2009273,61232.814.63$17,620
Jan 2009175,32035.865.37$29,183
Dec 2008376,10937.105.98$37,887
Nov 2008286,33655.496.86$45,021
Oct 2008277,05575.246.92$50,866
Sep 2008316,975101.767.88$58,097
Aug 2008217,422114.228.48$65,360
Jul 2008418,003131.0811.39$96,524
Jun 2008808,804131.3313.03$125,246
May 2008676,119123.1711.57$79,075
Apr 20081096,725110.3110.45$82,333
Mar 20081417,091101.909.66$82,896
Feb 20081474,86092.538.77$56,227
Jan 200814310,25990.388.21$97,107
Dec 200713512,31988.337.30$101,878
Nov 200720815,26391.677.29$130,361
Oct 200724819682.856.92$21,904
Sep 200717233775.846.24$15,149
Aug 200711718469.066.39$9,255

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  699 Mcf  × $  3.05 =     $2,129

────────────────────────────────────────────────────
Month total                                   $2,129

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/232529 is the state's own key, not one this site invented.