VANDERSTUCKEN 65

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235013District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$621 k
Mar 2007 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-23177973
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2 bbl$157
GasProduction128,438 Mcf$621,049
Total$621,205

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3315, -100.3565. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.33151, -100.35647 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,250 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-4353830894,250 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 2026046106.413.05$140
Apr 202605798.932.87$164
Mar 202609089.753.15$283
Feb 20260663.503.75$23
Jan 2026010359.138.00$824
Dec 2025011656.664.41$512
Nov 2025011158.593.93$436
Oct 2025010959.383.30$360
Sep 2025010562.743.08$323
Aug 202509863.933.01$295
Jul 2025012066.743.32$398
Jun 2025011366.483.13$354
May 2025012260.553.23$394
Apr 2025011762.363.54$415
Mar 2025013567.704.27$576
Feb 2025012470.884.34$538
Jan 2025014374.324.28$612
Dec 2024014868.993.12$462
Nov 2024013769.052.20$301
Oct 2024013571.372.28$308
Sep 2024012669.612.36$298
Aug 2024012775.632.06$262
Jul 2024013079.932.15$279
Jun 2024013178.082.63$345
May 2024011978.812.20$262
Apr 2024010184.451.66$168
Mar 2024012480.301.55$192
Feb 2024012076.091.78$214
Jan 2024014773.023.30$485
Dec 2023014871.262.61$386
Nov 2023014677.892.81$410
Oct 2023015385.443.09$472
Sep 2023016489.042.74$449
Aug 2023017080.522.67$454
Jul 2023016674.852.64$439
Jun 2023016068.962.26$361
May 2023019070.622.23$423
Apr 2023018178.122.24$405
Mar 2023018972.852.39$452
Feb 2023017475.112.47$429
Jan 2023014176.533.39$478
Dec 2022017976.415.73$1,026
Nov 2022016585.005.65$932
Oct 2022018587.185.86$1,085
Sep 2022017884.888.16$1,453
Aug 2022018394.529.13$1,670
Jul 20220146101.587.54$1,101
Jun 20220184115.097.98$1,468
May 20220197109.378.43$1,661
Apr 20220193104.226.84$1,320
Mar 20220207108.885.08$1,051
Feb 2022018891.054.86$913
Jan 2022041781.844.54$1,892
Dec 2021021471.323.90$834
Nov 2021020477.435.24$1,068
Oct 2021020579.795.71$1,171
Sep 2021020669.865.35$1,102
Aug 2021021766.024.22$916
Jul 2021022070.783.98$876
Jun 2021021369.493.38$720
May 2021021163.483.02$637
Apr 2021022760.362.76$626
Mar 2021023961.302.72$649
Feb 2021023357.805.55$1,293
Jan 2021024750.412.81$694
Dec 2020027544.642.68$736
Nov 2020023338.772.71$631
Oct 2020023536.972.48$582
Sep 2020022837.091.99$454
Aug 2020023939.982.39$570
Jul 2020023938.371.83$436
Jun 2020023134.901.69$390
May 2020024716.921.81$448
Apr 2020023414.751.80$422
Mar 2020025630.341.86$475
Feb 2020024149.881.98$477
Jan 2020025857.252.09$540
Dec 2019025559.012.30$588
Nov 2019027355.302.75$751
Oct 2019026553.472.42$641
Sep 2019020055.052.66$531
Aug 2019018853.112.30$433
Jul 2019025856.272.46$635
Jun 2019024452.782.49$608
May 2019022958.482.74$628
Apr 2019026762.632.75$734
Mar 2019024156.803.06$738
Feb 2019023450.852.79$653
Jan 2019026046.033.23$839
Dec 2018026946.594.19$1,126
Nov 2018026552.934.24$1,123
Oct 2018027761.443.40$941
Sep 2018027459.543.11$852
Aug 2018028959.403.07$886
Jul 2018030165.142.93$883
Jun 2018030160.183.08$926
May 2018031665.382.90$917
Apr 2018030763.842.90$891
Mar 2018031961.222.79$889
Feb 2018028861.782.77$797
Jan 2018029762.874.01$1,191
Dec 2017028857.272.92$841
Nov 2017030255.423.12$942
Oct 2017033149.292.98$988
Sep 2017030847.523.09$951
Aug 2017032345.373.00$970
Jul 2017032443.873.09$1,000
Jun 2017033042.493.09$1,019
May 2017034545.373.26$1,126
Apr 2017034247.933.21$1,098
Mar 2017035146.772.98$1,047
Feb 2017033050.452.95$974
Jan 2017035549.413.42$1,214
Dec 2016035648.763.72$1,325
Nov 2016035042.492.64$926
Oct 2016036446.193.09$1,125
Sep 2016035341.553.10$1,095
Aug 2016036941.442.92$1,079
Jul 2016037441.622.92$1,094
Jun 2016036345.352.69$975
May 2016037742.521.99$751
Apr 2016038336.561.99$763
Mar 2016041333.011.79$741
Feb 2016039026.472.06$805
Jan 2016040927.352.36$967
Dec 2015042032.362.00$841
Nov 2015041238.792.17$893
Oct 2015042843.552.43$1,039
Sep 2015038142.992.76$1,051
Aug 2015039040.162.87$1,120
Jul 2015039048.152.95$1,149
Jun 2015038756.152.88$1,116
May 2015040255.212.96$1,188
Apr 2015039049.822.71$1,056
Mar 2015042442.892.93$1,244
Feb 2015038944.662.98$1,158
Jan 2015045843.433.10$1,420
Dec 2014053654.693.59$1,925
Nov 201406570.464.25$276
Oct 2014043878.303.90$1,709
Sep 2014044486.164.05$1,796
Aug 2014046489.394.04$1,872
Jul 2014046296.564.18$1,931
Jun 2014045498.164.74$2,151
May 2014037994.734.73$1,791
Apr 2014037395.944.81$1,794
Mar 2014034495.895.06$1,740
Feb 2014032697.406.19$2,019
Jan 2014050190.404.86$2,435
Dec 2013051291.824.35$2,229
Nov 2013049988.853.74$1,865
Oct 2013054697.423.78$2,064
Sep 20130537104.113.72$1,996
Aug 20130589104.253.52$2,075
Jul 20130598102.523.72$2,223
Jun 2013052794.403.93$2,073
May 2013054394.834.15$2,253
Apr 2013058293.964.28$2,492
Mar 2013062793.623.91$2,453
Feb 2013061591.233.42$2,103
Jan 2013060991.603.42$2,083
Dec 2012061286.773.42$2,093
Nov 2012072286.953.62$2,617
Oct 2012077889.383.40$2,645
Sep 2012079494.672.92$2,317
Aug 2012079292.662.91$2,303
Jul 2012084885.133.02$2,562
Jun 2012088079.822.52$2,217
May 2012084791.612.49$2,108
Apr 20120819101.652.00$1,635
Mar 20120855105.052.22$1,900
Feb 20120786101.102.57$2,020
Jan 2012087998.092.73$2,403
Dec 2011086596.873.24$2,802
Nov 2011084195.723.31$2,785
Oct 2011087084.983.65$3,174
Sep 2011086783.623.99$3,456
Aug 2011093883.404.15$3,892
Jul 2011094594.144.52$4,269
Jun 2011093392.904.64$4,329
May 201101,02598.134.40$4,515
Apr 201101,009105.964.33$4,372
Mar 201101,06496.364.06$4,317
Feb 2011090985.644.18$3,800
Jan 201101,09486.504.59$5,020
Dec 201001,13785.734.35$4,943
Nov 201001,10780.843.80$4,201
Oct 201001,14378.103.51$4,011
Sep 201001,16272.633.98$4,624
Aug 201001,21773.684.42$5,378
Jul 201001,19172.554.74$5,641
Jun 201001,19570.364.91$5,868
May 201001,27371.124.24$5,391
Apr 201001,24581.694.12$5,133
Mar 201021,30178.394.39$5,866
Feb 201001,17173.585.44$6,373
Jan 201001,36874.365.96$8,159
Dec 200901,44071.445.48$7,897
Nov 200901,48374.593.75$5,563
Oct 200901,55672.544.11$6,396
Sep 200901,41065.543.06$4,321
Aug 200901,60167.423.22$5,153
Jul 200901,43561.133.46$4,972
Jun 200901,54466.163.90$6,014
May 200901,89754.743.93$7,447
Apr 2009092946.773.59$3,333
Mar 2009073042.144.06$2,963
Feb 2009041132.814.63$1,904
Jan 2009066035.865.37$3,545
Dec 200801,64537.105.98$9,832
Nov 200802,21655.496.86$15,203
Oct 200801,99975.246.92$13,837
Sep 200801,986101.767.88$15,644
Aug 200802,023114.228.48$17,161
Jul 200801,585131.0811.39$18,052
Jun 200801,616131.3313.03$21,061
May 200801,271123.1711.57$14,711
Apr 200801,017110.3110.45$10,633
Mar 20080877101.909.66$8,475
Feb 2008094992.538.77$8,323
Jan 2008098890.388.21$8,107
Dec 2007076188.337.30$5,557
Nov 2007078991.677.29$5,753
Oct 200701,04782.856.92$7,247
Sep 200701,30375.846.24$8,136
Aug 200701,37569.066.39$8,783
Jul 200701,55570.906.39$9,933
Jun 200701,70062.007.55$12,832
May 200702,76458.747.85$21,687
Apr 200703,66659.617.81$28,614
Mar 2007022456.927.30$1,636

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   46 Mcf  × $  3.05 =       $140

────────────────────────────────────────────────────
Month total                                     $140

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/235013 is the state's own key, not one this site invented.