MAYER, EDWIN S. JR.

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235345District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$235 k
May 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
229
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-16179200
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition150 bbl$11,483
GasProduction40,373 Mcf$223,681
Total$235,163

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6750, -100.8475. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67501, -100.84755 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,592 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,592 ft.

Completions filed
May 2007
1 of 1 wells

1 well

42-43538437297,592 ftMay 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (229)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

229 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240375.632.06$6
Jul 20240279.932.15$4
Jun 20240378.082.63$8
May 20240278.812.20$4
Apr 20240284.451.66$3
Mar 20240280.301.55$3
Feb 20240376.091.78$5
Jan 20240373.023.30$10
Dec 20230371.262.61$8
Nov 20230277.892.81$6
Oct 20230385.443.09$9
Sep 20230389.042.74$8
Aug 20230380.522.67$8
Jul 20230274.852.64$5
Jun 20230268.962.26$5
May 20230270.622.23$4
Apr 20230278.122.24$4
Mar 20230272.852.39$5
Feb 20230275.112.47$5
Jan 20230276.533.39$7
Dec 20221176.415.73$82
Nov 20220585.005.65$28
Oct 20220987.185.86$53
Sep 202201084.888.16$82
Aug 202201494.529.13$128
Jul 2022015101.587.54$113
Jun 2022120115.097.98$275
May 202201109.378.43$8
Apr 202211104.226.84$111
Mar 2022011108.885.08$56
Feb 202212191.054.86$193
Jan 202202081.844.54$91
Dec 202105871.323.90$226
Nov 202107177.435.24$372
Oct 202107779.795.71$440
Sep 202107769.865.35$412
Aug 202108166.024.22$342
Jul 202108370.783.98$331
Jun 202107269.493.38$243
May 202118063.483.02$305
Apr 20210860.362.76$22
Mar 202107261.302.72$196
Feb 20210657.805.55$33
Jan 20210250.412.81$6
Dec 20200644.642.68$16
Nov 20200738.772.71$19
Oct 20200936.972.48$22
Sep 20200937.091.99$18
Aug 20200539.982.39$12
Jul 20200338.371.83$5
Jun 20200734.901.69$12
May 20200816.921.81$15
Apr 202001014.751.80$18
Mar 20200930.341.86$17
Feb 20200549.881.98$10
Jan 20200357.252.09$6
Dec 20190259.012.30$5
Nov 20190355.302.75$8
Oct 20190853.472.42$19
Sep 201901155.052.66$29
Aug 20190853.112.30$18
Jul 20190956.272.46$22
Jun 20190852.782.49$20
May 20190858.482.74$22
Apr 20190762.632.75$19
Mar 20190956.803.06$28
Feb 20190750.852.79$20
Jan 20190846.033.23$26
Dec 20180946.594.19$38
Nov 201801152.934.24$47
Oct 201801261.443.40$41
Sep 201811459.543.11$103
Aug 201811959.403.07$118
Jul 201801465.142.93$41
Jun 201811760.183.08$112
May 201811865.382.90$118
Apr 201801663.842.90$46
Mar 201801261.222.79$33
Feb 20180861.782.77$22
Jan 201801162.874.01$44
Dec 201701257.272.92$35
Nov 201701155.423.12$34
Oct 201701349.292.98$39
Sep 201701647.523.09$49
Aug 201702045.373.00$60
Jul 201702143.873.09$65
Jun 201701742.493.09$52
May 201701745.373.26$55
Apr 201701447.933.21$45
Mar 201708446.772.98$251
Feb 201701150.452.95$32
Jan 20170949.413.42$31
Dec 20160748.763.72$26
Nov 20161942.492.64$66
Oct 201601346.193.09$40
Sep 201621641.553.10$133
Aug 201621741.442.92$133
Jul 201608741.622.92$254
Jun 201611645.352.69$88
May 201611942.521.99$80
Apr 201631736.561.99$144
Mar 201621633.011.79$95
Feb 201631526.472.06$110
Jan 201601527.352.36$35
Dec 201501432.362.00$28
Nov 201501438.792.17$30
Oct 201501843.552.43$44
Sep 201501842.992.76$50
Aug 201505040.162.87$144
Jul 201502248.152.95$65
Jun 201502256.152.88$63
May 201502255.212.96$65
Apr 201502049.822.71$54
Mar 201502242.892.93$65
Feb 201501844.662.98$54
Jan 201501843.433.10$56
Dec 201402054.693.59$72
Nov 201401870.464.25$77
Oct 201402278.303.90$86
Sep 201402886.164.05$113
Aug 201403089.394.04$121
Jul 201403396.564.18$138
Jun 201403198.164.74$147
May 201403194.734.73$147
Apr 201403295.944.81$154
Mar 201403195.895.06$157
Feb 201403097.406.19$186
Jan 201404490.404.86$214
Dec 201305791.824.35$248
Nov 201308988.853.74$333
Oct 201308497.423.78$317
Sep 2013098104.113.72$364
Aug 20130114104.253.52$402
Jul 20130122102.523.72$454
Jun 2013013094.403.93$511
May 2013014094.834.15$581
Apr 2013013793.964.28$587
Mar 2013014793.623.91$575
Feb 2013013691.233.42$465
Jan 2013015091.603.42$513
Dec 2012014986.773.42$510
Nov 2012015386.953.62$555
Oct 2012016289.383.40$551
Sep 2012016894.672.92$490
Aug 2012017092.662.91$494
Jul 2012017485.133.02$526
Jun 2012017579.822.52$441
May 2012019091.612.49$473
Apr 20120188101.652.00$375
Mar 20120192105.052.22$427
Feb 20120189101.102.57$486
Jan 2012021598.092.73$588
Dec 2011022896.873.24$739
Nov 2011021795.723.31$719
Oct 2011024884.983.65$905
Sep 2011035083.623.99$1,395
Aug 2011042283.404.15$1,751
Jul 2011036994.144.52$1,667
Jun 2011544092.904.64$2,506
May 2011742598.134.40$2,559
Apr 201115420105.964.33$3,409
Mar 2011046296.364.06$1,874
Feb 2011047985.644.18$2,002
Jan 2011052586.504.59$2,409
Dec 2010022185.734.35$961
Nov 2010022980.843.80$869
Oct 2010026778.103.51$937
Sep 2010034372.633.98$1,365
Aug 2010042873.684.42$1,891
Jul 20101946372.554.74$3,571
Jun 2010746170.364.91$2,756
May 2010041471.124.24$1,753
Apr 2010844281.694.12$2,476
Mar 2010047278.394.39$2,071
Feb 2010047473.585.44$2,580
Jan 2010045274.365.96$2,696
Dec 2009040871.445.48$2,237
Nov 2009047074.593.75$1,763
Oct 2009052772.544.11$2,166
Sep 2009059365.543.06$1,817
Aug 2009065867.423.22$2,118
Jul 2009068161.133.46$2,359
Jun 2009070166.163.90$2,730
May 2009075054.743.93$2,944
Apr 2009077346.773.59$2,773
Mar 2009074742.144.06$3,032
Feb 2009080432.814.63$3,725
Jan 2009096735.865.37$5,194
Dec 200801,20137.105.98$7,179
Nov 2008053155.496.86$3,643
Oct 2008025775.246.92$1,779
Sep 20080213101.767.88$1,678
Aug 20080192114.228.48$1,629
Jul 2008077131.0811.39$877
Jun 20081389131.3313.03$5,201
May 20081327123.1711.57$3,908
Apr 20081374110.3110.45$4,020
Mar 20082430101.909.66$4,359
Feb 2008249392.538.77$4,509
Jan 2008352790.388.21$4,596
Dec 2007452388.337.30$4,172
Nov 2007575391.677.29$5,949
Oct 2007393682.856.92$6,728
Sep 2007478575.846.24$5,205
Aug 2007597269.066.39$6,554
Jul 2007161,62070.906.39$11,483
Jun 2007143,55962.007.55$27,733
May 200743,06258.747.85$24,260

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 75.63 =         $0
Gas                    3 Mcf  × $  2.06 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/235345 is the state's own key, not one this site invented.