SHURLEY 142

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235383District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$576 k
Jun 2007 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-23179190
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition323 bbl$24,431
GasProduction102,913 Mcf$551,652
Total$576,083

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4614, -100.7140. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46142, -100.71404 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,071 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,071 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-43538456317,071 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 202600106.413.05$0
Apr 202602398.932.87$66
Mar 2026016189.753.15$507
Feb 2026014863.503.75$555
Jan 2026016359.138.00$1,304
Dec 2025016256.664.41$715
Nov 2025012858.593.93$503
Oct 2025013959.383.30$459
Sep 2025014862.743.08$455
Aug 2025015563.933.01$467
Jul 2025015566.743.32$514
Jun 2025013766.483.13$429
May 2025016360.553.23$527
Apr 2025016362.363.54$578
Mar 2025016667.704.27$709
Feb 2025014870.884.34$642
Jan 2025016874.324.28$719
Dec 2024016768.993.12$521
Nov 2024016169.052.20$354
Oct 2024016571.372.28$376
Sep 2024016469.612.36$388
Aug 2024017075.632.06$351
Jul 2024017379.932.15$371
Jun 2024015778.082.63$414
May 2024015178.812.20$332
Apr 2024015584.451.66$257
Mar 2024015280.301.55$235
Feb 2024013976.091.78$248
Jan 2024016573.023.30$544
Dec 2023016471.262.61$428
Nov 2023017077.892.81$477
Oct 2023015285.443.09$469
Sep 2023016689.042.74$454
Aug 2023016080.522.67$428
Jul 2023014674.852.64$386
Jun 2023016568.962.26$373
May 2023016370.622.23$363
Apr 2023017378.122.24$387
Mar 2023018072.852.39$431
Feb 2023016475.112.47$404
Jan 2023018676.533.39$630
Dec 2022018176.415.73$1,037
Nov 2022018485.005.65$1,039
Oct 2022018987.185.86$1,108
Sep 2022018384.888.16$1,494
Aug 2022020394.529.13$1,853
Jul 20220148101.587.54$1,116
Jun 20220189115.097.98$1,508
May 20220195109.378.43$1,644
Apr 20220195104.226.84$1,333
Mar 20220206108.885.08$1,046
Feb 2022019691.054.86$952
Jan 2022022281.844.54$1,007
Dec 2021023271.323.90$905
Nov 2021024877.435.24$1,299
Oct 2021030479.795.71$1,737
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 202102063.483.02$60
Apr 2021019460.362.76$535
Mar 2021020061.302.72$543
Feb 2021013457.805.55$743
Jan 2021018850.412.81$528
Dec 2020019644.642.68$524
Nov 2020019338.772.71$522
Oct 2020021136.972.48$523
Sep 2020019137.091.99$380
Aug 2020020339.982.39$484
Jul 2020018738.371.83$341
Jun 2020019334.901.69$326
May 2020021316.921.81$387
Apr 2020021014.751.80$379
Mar 2020018730.341.86$347
Feb 2020018649.881.98$368
Jan 2020020857.252.09$436
Dec 2019020259.012.30$465
Nov 2019020055.302.75$550
Oct 2019019953.472.42$481
Sep 2019018255.052.66$484
Aug 2019022353.112.30$514
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 2019016550.852.79$461
Jan 2019019746.033.23$636
Dec 2018023846.594.19$996
Nov 2018020352.934.24$860
Oct 2018018761.443.40$635
Sep 2018018559.543.11$575
Aug 2018020559.403.07$629
Jul 2018021465.142.93$627
Jun 2018022460.183.08$689
May 2018021165.382.90$612
Apr 2018021963.842.90$635
Mar 2018024961.222.79$694
Feb 2018024761.782.77$683
Jan 2018026662.874.01$1,066
Dec 2017026457.272.92$771
Nov 2017026855.423.12$836
Oct 2017028149.292.98$838
Sep 2017028647.523.09$883
Aug 2017029945.373.00$898
Jul 2017028343.873.09$874
Jun 2017027342.493.09$843
May 2017027745.373.26$904
Apr 2017026547.933.21$851
Mar 2017028646.772.98$853
Feb 2017026050.452.95$768
Jan 2017029149.413.42$995
Dec 2016028548.763.72$1,061
Nov 2016028242.492.64$746
Oct 2016029446.193.09$909
Sep 2016028241.553.10$874
Aug 2016127741.442.92$851
Jul 2016029941.622.92$874
Jun 2016129945.352.69$848
May 2016131142.521.99$662
Apr 2016129936.561.99$632
Mar 2016130733.011.79$584
Feb 2016129026.472.06$625
Jan 2016230827.352.36$783
Dec 2015130932.362.00$651
Nov 2015130438.792.17$698
Oct 2015237543.552.43$997
Sep 2015132042.992.76$926
Aug 2015133140.162.87$991
Jul 2015234348.152.95$1,106
Jun 2015233256.152.88$1,069
May 2015233855.212.96$1,109
Apr 2015231749.822.71$958
Mar 2015333042.892.93$1,097
Feb 2015230244.662.98$988
Jan 2015233743.433.10$1,132
Dec 2014233354.693.59$1,305
Nov 2014132570.464.25$1,452
Oct 2014230678.303.90$1,350
Sep 2014226686.164.05$1,248
Aug 2014327089.394.04$1,358
Jul 2014127196.564.18$1,229
Jun 2014127098.164.74$1,377
May 2014227594.734.73$1,489
Apr 2014227895.944.81$1,529
Mar 2014215795.895.06$986
Feb 2014225897.406.19$1,792
Jan 2014228990.404.86$1,586
Dec 2013228491.824.35$1,420
Nov 2013328488.853.74$1,328
Oct 2013229697.423.78$1,314
Sep 20131281104.113.72$1,149
Aug 20131294104.253.52$1,140
Jul 20131298102.523.72$1,210
Jun 2013328994.403.93$1,420
May 2013130294.834.15$1,348
Apr 2013329593.964.28$1,545
Mar 2013130793.623.91$1,295
Feb 2013328291.233.42$1,238
Jan 2013331491.603.42$1,349
Dec 2012231586.773.42$1,251
Nov 2012330586.953.62$1,366
Oct 2012132389.383.40$1,187
Sep 2012231294.672.92$1,100
Aug 2012132192.662.91$1,026
Jul 2012133885.133.02$1,106
Jun 2012021379.822.52$537
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 2012010101.102.57$26
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 201111395.723.31$139
Oct 20110484.983.65$15
Sep 20110383.623.99$12
Aug 20111683.404.15$108
Jul 2011229994.144.52$1,539
Jun 2011240192.904.64$2,046
May 2011343198.134.40$2,193
Apr 20112445105.964.33$2,140
Mar 2011327896.364.06$1,417
Feb 2011346485.644.18$2,196
Jan 2011668486.504.59$3,658
Dec 2010671485.734.35$3,619
Nov 2010468580.843.80$2,923
Oct 2010360378.103.51$2,350
Sep 2010351472.633.98$2,263
Aug 2010353973.684.42$2,603
Jul 2010359572.554.74$3,036
Jun 2010359370.364.91$3,123
May 2010672471.124.24$3,493
Apr 2010679081.694.12$3,747
Mar 2010675378.394.39$3,775
Feb 201061,01973.585.44$5,987
Jan 201091,31374.365.96$8,500
Dec 200971,36871.445.48$8,002
Nov 200991,27274.593.75$5,443
Oct 200951,26872.544.11$5,575
Sep 200941,14365.543.06$3,765
Aug 200971,27567.423.22$4,576
Jul 200961,30461.133.46$4,884
Jun 200951,28766.163.90$5,344
May 200981,49454.743.93$6,303
Apr 200991,28646.773.59$5,034
Mar 200981,56142.144.06$6,673
Feb 200961,45532.814.63$6,938
Jan 2009101,61335.865.37$9,022
Dec 200891,63537.105.98$10,107
Nov 200891,63155.496.86$11,689
Oct 2008101,67275.246.92$12,326
Sep 200881,570101.767.88$13,181
Aug 200861,696114.228.48$15,073
Jul 200861,416131.0811.39$16,914
Jun 200861,427131.3313.03$19,386
May 200891,703123.1711.57$20,820
Apr 200861,766110.3110.45$19,125
Mar 200841,564101.909.66$15,522
Feb 200801,76392.538.77$15,463
Jan 200802,01090.388.21$16,494
Dec 200702,24888.337.30$16,415
Nov 200702,10991.677.29$15,378
Oct 200703,28982.856.92$22,766
Sep 200702,21075.846.24$13,800
Aug 200703,14969.066.39$20,116
Jul 200702,32570.906.39$14,852
Jun 200703,32462.007.55$25,091

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   23 Mcf  × $  2.87 =        $66

────────────────────────────────────────────────────
Month total                                      $66

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/235383 is the state's own key, not one this site invented.