KELLY 35

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235597District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$554 k
Jun 2007 – May 2026
Value, last 12 filed months
$108
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-23179291
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition110 bbl$8,639
GasProduction109,927 Mcf$545,545
Total$554,184

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4175, -100.7256. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41746, -100.72559 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,236 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,236 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-435385084A7,236 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260159.138.00$8
Dec 20250256.664.41$9
Nov 20250358.593.93$12
Oct 20250359.383.30$10
Sep 20250362.743.08$9
Aug 20250463.933.01$12
Jul 20250566.743.32$17
Jun 202501066.483.13$31
May 202501460.553.23$45
Apr 202501262.363.54$43
Mar 202501367.704.27$55
Feb 202504070.884.34$174
Jan 2025021374.324.28$911
Dec 2024029668.993.12$924
Nov 20240569.052.20$11
Oct 202401071.372.28$23
Sep 202401069.612.36$24
Aug 202402875.632.06$58
Jul 202401779.932.15$36
Jun 202401178.082.63$29
May 2024025378.812.20$556
Apr 2024033484.451.66$554
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202302385.443.09$71
Sep 202306489.042.74$175
Aug 2023012080.522.67$321
Jul 202306074.852.64$159
Jun 202301668.962.26$36
May 202302970.622.23$65
Apr 202301978.122.24$43
Mar 202304572.852.39$108
Feb 202302975.112.47$72
Jan 202309676.533.39$325
Dec 202201776.415.73$97
Nov 202208685.005.65$486
Oct 2022031887.185.86$1,865
Sep 202209384.888.16$759
Aug 2022025794.529.13$2,346
Jul 20220105101.587.54$792
Jun 20220142115.097.98$1,133
May 20220204109.378.43$1,720
Apr 20220123104.226.84$841
Mar 20220171108.885.08$868
Feb 202204791.054.86$228
Jan 202202581.844.54$113
Dec 2021021071.323.90$819
Nov 2021018377.435.24$958
Oct 202103779.795.71$211
Sep 2021017269.865.35$920
Aug 202102166.024.22$89
Jul 2021018070.783.98$717
Jun 2021016369.493.38$551
May 2021018263.483.02$549
Apr 202105660.362.76$154
Mar 2021016361.302.72$443
Feb 2021022057.805.55$1,221
Jan 2021017950.412.81$503
Dec 2020015844.642.68$423
Nov 2020010538.772.71$284
Oct 2020012636.972.48$312
Sep 2020016537.091.99$329
Aug 2020013539.982.39$322
Jul 2020019038.371.83$347
Jun 2020014434.901.69$243
May 2020014016.921.81$254
Apr 2020014714.751.80$265
Mar 2020015830.341.86$293
Feb 2020017349.881.98$343
Jan 2020024357.252.09$509
Dec 2019015159.012.30$348
Nov 2019020955.302.75$575
Oct 2019016853.472.42$406
Sep 2019024255.052.66$643
Aug 2019037453.112.30$862
Jul 2019035856.272.46$881
Jun 2019039852.782.49$992
May 201907958.482.74$216
Apr 2019018962.632.75$520
Mar 201907356.803.06$224
Feb 2019018350.852.79$511
Jan 2019022146.033.23$713
Dec 2018021846.594.19$912
Nov 2018022652.934.24$958
Oct 2018031961.443.40$1,084
Sep 2018017159.543.11$531
Aug 2018027459.403.07$840
Jul 2018039665.142.93$1,161
Jun 2018031860.183.08$978
May 2018026865.382.90$777
Apr 2018029963.842.90$867
Mar 2018032061.222.79$892
Feb 2018030561.782.77$844
Jan 2018034662.874.01$1,387
Dec 2017233657.272.92$1,096
Nov 2017032455.423.12$1,010
Oct 2017336849.292.98$1,246
Sep 2017043547.523.09$1,343
Aug 2017039545.373.00$1,187
Jul 2017341743.873.09$1,419
Jun 2017041642.493.09$1,284
May 2017341545.373.26$1,490
Apr 2017043247.933.21$1,387
Mar 2017044346.772.98$1,322
Feb 2017042150.452.95$1,243
Jan 2017044549.413.42$1,521
Dec 2016342748.763.72$1,736
Nov 2016043242.492.64$1,142
Oct 2016351946.193.09$1,742
Sep 2016239841.553.10$1,317
Aug 2016034641.442.92$1,012
Jul 2016022541.622.92$658
Jun 2016128445.352.69$808
May 2016025142.521.99$500
Apr 2016030136.561.99$599
Mar 2016232633.011.79$651
Feb 2016039426.472.06$813
Jan 2016048327.352.36$1,142
Dec 2015052632.362.00$1,053
Nov 2015020838.792.17$451
Oct 2015342943.552.43$1,172
Sep 2015242342.992.76$1,253
Aug 2015045940.162.87$1,318
Jul 2015045948.152.95$1,352
Jun 2015344956.152.88$1,463
May 2015046855.212.96$1,383
Apr 2015045849.822.71$1,240
Mar 2015049842.892.93$1,461
Feb 2015044044.662.98$1,310
Jan 2015048743.433.10$1,510
Dec 2014349454.693.59$1,938
Nov 2014349570.464.25$2,316
Oct 2014046078.303.90$1,794
Sep 2014249986.164.05$2,191
Aug 2014252989.394.04$2,313
Jul 2014353696.564.18$2,530
Jun 2014051998.164.74$2,458
May 2014055194.734.73$2,604
Apr 2014055595.944.81$2,669
Mar 2014250295.895.06$2,730
Feb 2014047597.406.19$2,941
Jan 2014353690.404.86$2,877
Dec 2013254091.824.35$2,535
Nov 2013253488.853.74$2,174
Oct 2013356097.423.78$2,409
Sep 20133554104.113.72$2,372
Aug 20132592104.253.52$2,294
Jul 20132591102.523.72$2,402
Jun 2013057794.403.93$2,270
May 2013359994.834.15$2,770
Apr 2013059493.964.28$2,544
Mar 2013262893.623.91$2,645
Feb 2013257991.233.42$2,163
Jan 2013262991.603.42$2,334
Dec 2012263686.773.42$2,349
Nov 2012563286.953.62$2,726
Oct 2012267189.383.40$2,460
Sep 2012369394.672.92$2,306
Aug 2012467492.662.91$2,331
Jul 2012261685.133.02$2,031
Jun 2012266379.822.52$1,830
May 2012459491.612.49$1,845
Apr 20122751101.652.00$1,703
Mar 20120659105.052.22$1,464
Feb 20122699101.102.57$1,999
Jan 2012269698.092.73$2,099
Dec 2011374596.873.24$2,704
Nov 2011267995.723.31$2,440
Oct 2011274084.983.65$2,870
Sep 2011174783.623.99$3,061
Aug 2011075283.404.15$3,120
Jul 2011081194.144.52$3,663
Jun 2011078792.904.64$3,652
May 2011087898.134.40$3,867
Apr 20110762105.964.33$3,302
Mar 2011071496.364.06$2,897
Feb 2011072585.644.18$3,030
Jan 2011087386.504.59$4,006
Dec 2010087085.734.35$3,783
Nov 2010086180.843.80$3,268
Oct 2010094378.103.51$3,309
Sep 2010089172.633.98$3,546
Aug 2010088273.684.42$3,898
Jul 2010185272.554.74$4,108
Jun 2010077770.364.91$3,815
May 2010093871.124.24$3,973
Apr 2010088081.694.12$3,628
Mar 2010056678.394.39$2,484
Feb 201007573.585.44$408
Jan 2010029574.365.96$1,759
Dec 2009033771.445.48$1,848
Nov 2009050674.593.75$1,898
Oct 2009061472.544.11$2,524
Sep 2009068665.543.06$2,102
Aug 2009075767.423.22$2,436
Jul 2009075461.133.46$2,612
Jun 2009074366.163.90$2,894
May 2009085254.743.93$3,345
Apr 2009067046.773.59$2,404
Mar 2009093842.144.06$3,807
Feb 2009080432.814.63$3,725
Jan 200901,04435.865.37$5,607
Dec 200801,18037.105.98$7,053
Nov 200801,18155.496.86$8,102
Oct 200801,19775.246.92$8,286
Sep 200801,255101.767.88$9,886
Aug 200801,358114.228.48$11,520
Jul 200801,358131.0811.39$15,467
Jun 200801,057131.3313.03$13,775
May 200801,396123.1711.57$16,158
Apr 200801,428110.3110.45$14,930
Mar 200801,550101.909.66$14,979
Feb 200801,09292.538.77$9,577
Jan 200801,60490.388.21$13,162
Dec 200701,24688.337.30$9,098
Nov 200702,04891.677.29$14,933
Oct 200702,13482.856.92$14,772
Sep 200702,59775.846.24$16,216
Aug 200703,02569.066.39$19,324
Jul 200703,72670.906.39$23,801
Jun 200703,96762.007.55$29,945

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.13 =         $0
Gas                    1 Mcf  × $  8.00 =         $8

────────────────────────────────────────────────────
Month total                                       $8

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/235597 is the state's own key, not one this site invented.