HICKS 22

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235809District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Jun 2007 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-23179283
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition224 bbl$20,339
GasProduction191,158 Mcf$1,044,353
Total$1,064,693

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5366, -100.8524. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53662, -100.85237 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,728 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,728 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-43538369228,728 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 20260222106.413.05$676
Apr 2026021298.932.87$608
Mar 2026022489.753.15$705
Feb 2026021063.503.75$788
Jan 2026019259.138.00$1,536
Dec 2025021456.664.41$944
Nov 2025020958.593.93$821
Oct 2025021259.383.30$701
Sep 2025020962.743.08$643
Aug 2025021363.933.01$642
Jul 2025021466.743.32$709
Jun 2025020766.483.13$648
May 2025020760.553.23$669
Apr 2025020362.363.54$719
Mar 2025021667.704.27$922
Feb 2025020970.884.34$907
Jan 2025024174.324.28$1,031
Dec 2024023068.993.12$718
Nov 2024022169.052.20$486
Oct 2024022471.372.28$511
Sep 2024021469.612.36$506
Aug 2024021475.632.06$442
Jul 2024021979.932.15$470
Jun 2024020878.082.63$548
May 2024022678.812.20$497
Apr 2024023184.451.66$383
Mar 2024024480.301.55$377
Feb 2024023576.091.78$419
Jan 2024024973.023.30$821
Dec 2023024871.262.61$647
Nov 2023024377.892.81$682
Oct 2023025385.443.09$781
Sep 2023023089.042.74$629
Aug 2023022580.522.67$601
Jul 2023023074.852.64$608
Jun 2023022768.962.26$513
May 2023024670.622.23$548
Apr 2023025278.122.24$564
Mar 2023026372.852.39$629
Feb 2023022775.112.47$560
Jan 2023024876.533.39$840
Dec 2022024976.415.73$1,427
Nov 2022024985.005.65$1,406
Oct 2022026287.185.86$1,536
Sep 2022026084.888.16$2,123
Aug 2022026494.529.13$2,410
Jul 20220261101.587.54$1,968
Jun 20220247115.097.98$1,970
May 20220260109.378.43$2,193
Apr 20220258104.226.84$1,764
Mar 20220274108.885.08$1,391
Feb 2022025491.054.86$1,234
Jan 2022028881.844.54$1,307
Dec 2021029371.323.90$1,142
Nov 2021028977.435.24$1,513
Oct 2021029579.795.71$1,686
Sep 2021028569.865.35$1,525
Aug 2021030666.024.22$1,292
Jul 2021031470.783.98$1,250
Jun 2021030569.493.38$1,031
May 2021032363.483.02$975
Apr 2021031460.362.76$866
Mar 2021031661.302.72$859
Feb 2021028957.805.55$1,603
Jan 2021033250.412.81$933
Dec 2020031444.642.68$840
Nov 2020030038.772.71$812
Oct 2020030236.972.48$748
Sep 2020029037.091.99$577
Aug 2020028739.982.39$685
Jul 2020027538.371.83$502
Jun 2020026934.901.69$455
May 2020028016.921.81$508
Apr 2020027414.751.80$494
Mar 2020030130.341.86$559
Feb 2020029149.881.98$576
Jan 2020030457.252.09$637
Dec 2019031259.012.30$719
Nov 2019032455.302.75$891
Oct 2019033253.472.42$803
Sep 2019036955.052.66$981
Aug 2019036753.112.30$846
Jul 2019043556.272.46$1,070
Jun 2019024752.782.49$615
May 2019033158.482.74$907
Apr 2019033262.632.75$913
Mar 2019034456.803.06$1,053
Feb 2019030250.852.79$843
Jan 2019034646.033.23$1,117
Dec 2018035346.594.19$1,477
Nov 2018033752.934.24$1,428
Oct 2018034861.443.40$1,183
Sep 2018033259.543.11$1,032
Aug 2018036459.403.07$1,116
Jul 2018036465.142.93$1,067
Jun 2018035360.183.08$1,086
May 2018037065.382.90$1,073
Apr 2018035863.842.90$1,038
Mar 2018037861.222.79$1,053
Feb 2018034261.782.77$946
Jan 2018037662.874.01$1,508
Dec 2017037657.272.92$1,098
Nov 2017036855.423.12$1,148
Oct 2017038749.292.98$1,155
Sep 2017038147.523.09$1,176
Aug 2017039545.373.00$1,187
Jul 2017039343.873.09$1,213
Jun 2017038742.493.09$1,195
May 2017038645.373.26$1,260
Apr 2017039247.933.21$1,259
Mar 2017040746.772.98$1,214
Feb 2017036550.452.95$1,078
Jan 2017039749.413.42$1,357
Dec 2016040648.763.72$1,511
Nov 2016040442.492.64$1,068
Oct 2016043046.193.09$1,329
Sep 2016041941.553.10$1,299
Aug 2016041241.442.92$1,205
Jul 2016042741.622.92$1,249
Jun 2016042345.352.69$1,136
May 2016044542.521.99$886
Apr 2016044136.561.99$878
Mar 2016046233.011.79$829
Feb 2016042126.472.06$869
Jan 2016045227.352.36$1,069
Dec 2015046932.362.00$939
Nov 2015048238.792.17$1,045
Oct 2015045843.552.43$1,111
Sep 2015044142.992.76$1,216
Aug 2015046640.162.87$1,339
Jul 2015044848.152.95$1,319
Jun 2015041556.152.88$1,196
May 2015446855.212.96$1,604
Apr 2015046349.822.71$1,253
Mar 2015048442.892.93$1,420
Feb 2015043744.662.98$1,301
Jan 2015048843.433.10$1,513
Dec 2014049354.693.59$1,771
Nov 2014045670.464.25$1,939
Oct 2014048378.303.90$1,884
Sep 2014045586.164.05$1,841
Aug 2014048389.394.04$1,949
Jul 2014047496.564.18$1,981
Jun 2014048298.164.74$2,283
May 2014048994.734.73$2,311
Apr 2014048995.944.81$2,352
Mar 2014050295.895.06$2,539
Feb 2014045397.406.19$2,805
Jan 2014049290.404.86$2,391
Dec 2013036291.824.35$1,576
Nov 2013046888.853.74$1,750
Oct 2013048897.423.78$1,844
Sep 20130477104.113.72$1,773
Aug 20130485104.253.52$1,708
Jul 20130511102.523.72$1,900
Jun 2013049394.403.93$1,939
May 2013052094.834.15$2,158
Apr 2013051593.964.28$2,206
Mar 2013053793.623.91$2,101
Feb 2013050791.233.42$1,734
Jan 2013055591.603.42$1,898
Dec 2012057786.773.42$1,973
Nov 2012055586.953.62$2,012
Oct 2012056589.383.40$1,921
Sep 2012054494.672.92$1,588
Aug 2012058192.662.91$1,690
Jul 2012059885.133.02$1,806
Jun 2012057279.822.52$1,441
May 2012060091.612.49$1,493
Apr 20120587101.652.00$1,172
Mar 20120628105.052.22$1,395
Feb 20120571101.102.57$1,468
Jan 2012060698.092.73$1,657
Dec 2011053396.873.24$1,727
Nov 2011023995.723.31$791
Oct 2011091084.983.65$3,320
Sep 201101,11383.623.99$4,436
Aug 201101,15383.404.15$4,784
Jul 201101,16794.144.52$5,272
Jun 201121,13092.904.64$5,429
May 201101,26798.134.40$5,581
Apr 201101,225105.964.33$5,308
Mar 201131,32996.364.06$5,681
Feb 201111,09085.644.18$4,642
Jan 201101,42286.504.59$6,525
Dec 201001,45185.734.35$6,309
Nov 201021,43380.843.80$5,600
Oct 201001,47678.103.51$5,179
Sep 201041,49572.633.98$6,240
Aug 201001,49273.684.42$6,594
Jul 201021,45672.554.74$7,041
Jun 201011,38770.364.91$6,881
May 201021,44771.124.24$6,271
Apr 201031,29881.694.12$5,596
Mar 201081,31978.394.39$6,416
Feb 2010096773.585.44$5,263
Jan 201081,56174.365.96$9,905
Dec 2009050371.445.48$2,758
Nov 200901,05774.593.75$3,965
Oct 200901,06472.544.11$4,373
Sep 200901,01065.543.06$3,095
Aug 200901,53567.423.22$4,940
Jul 200902,12361.133.46$7,355
Jun 200901,73666.163.90$6,762
May 200901,71954.743.93$6,748
Apr 200901,72746.773.59$6,196
Mar 200901,84942.144.06$7,505
Feb 200901,72632.814.63$7,997
Jan 200901,89935.865.37$10,200
Dec 2008102,03137.105.98$12,511
Nov 200802,06155.496.86$14,139
Oct 200802,19475.246.92$15,187
Sep 200802,210101.767.88$17,408
Aug 200802,317114.228.48$19,655
Jul 200802,341131.0811.39$26,663
Jun 200872,661131.3313.03$35,599
May 200802,956123.1711.57$34,214
Apr 2008453,082110.3110.45$37,186
Mar 2008313,508101.909.66$37,060
Feb 200803,45992.538.77$30,337
Jan 2008184,05990.388.21$34,934
Dec 2007314,54888.337.30$35,948
Nov 2007214,31991.677.29$33,418
Oct 200705,62582.856.92$38,936
Sep 2007186,94475.846.24$44,725
Aug 200708,20769.066.39$52,426
Jul 2007310,73170.906.39$68,762
Jun 200708,83862.007.55$66,713

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  222 Mcf  × $  3.05 =       $676

────────────────────────────────────────────────────
Month total                                     $676

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/235809 is the state's own key, not one this site invented.