HICKS 22

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236350District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$929 k
Jun 2007 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02179273
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition44 bbl$3,267
GasProduction178,428 Mcf$926,141
Total$929,408

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5320, -100.8645. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53200, -100.86445 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,758 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,758 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-43538374198,758 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 20260308106.413.05$938
Apr 2026030598.932.87$875
Mar 2026032089.753.15$1,008
Feb 2026028963.503.75$1,084
Jan 2026030959.138.00$2,471
Dec 2025031856.664.41$1,403
Nov 2025031658.593.93$1,241
Oct 2025032459.383.30$1,071
Sep 2025030962.743.08$951
Aug 2025032663.933.01$983
Jul 2025032766.743.32$1,084
Jun 2025030866.483.13$964
May 2025031160.553.23$1,005
Apr 2025031162.363.54$1,102
Mar 2025033467.704.27$1,426
Feb 2025032670.884.34$1,415
Jan 2025036574.324.28$1,562
Dec 2024036468.993.12$1,136
Nov 2024034969.052.20$767
Oct 2024035671.372.28$812
Sep 2024034969.612.36$825
Aug 2024038775.632.06$799
Jul 2024044079.932.15$945
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 202208285.005.65$463
Oct 2022027987.185.86$1,636
Sep 2022023084.888.16$1,878
Aug 2022022494.529.13$2,044
Jul 20220215101.587.54$1,622
Jun 20220195115.097.98$1,556
May 20220189109.378.43$1,594
Apr 20220183104.226.84$1,251
Mar 20220200108.885.08$1,015
Feb 2022017991.054.86$870
Jan 2022020281.844.54$917
Dec 2021020771.323.90$807
Nov 2021022677.435.24$1,184
Oct 2021023679.795.71$1,348
Sep 2021019969.865.35$1,065
Aug 2021020966.024.22$882
Jul 2021021470.783.98$852
Jun 2021020769.493.38$700
May 2021021963.483.02$661
Apr 2021021060.362.76$579
Mar 2021021961.302.72$595
Feb 2021020157.805.55$1,115
Jan 2021022650.412.81$635
Dec 2020022144.642.68$591
Nov 2020021238.772.71$574
Oct 2020022436.972.48$555
Sep 2020021537.091.99$428
Aug 2020021939.982.39$522
Jul 2020021838.371.83$398
Jun 2020021634.901.69$365
May 2020022216.921.81$403
Apr 2020022614.751.80$408
Mar 2020025230.341.86$468
Feb 2020025149.881.98$497
Jan 2020029557.252.09$618
Dec 2019029059.012.30$668
Nov 2019030455.302.75$836
Oct 2019033153.472.42$801
Sep 2019040955.052.66$1,087
Aug 2019033353.112.30$767
Jul 2019045556.272.46$1,119
Jun 2019024652.782.49$613
May 2019032158.482.74$880
Apr 2019031562.632.75$866
Mar 2019033256.803.06$1,017
Feb 2019029750.852.79$829
Jan 2019034046.033.23$1,098
Dec 2018034846.594.19$1,457
Nov 2018033452.934.24$1,415
Oct 2018035461.443.40$1,203
Sep 2018034259.543.11$1,063
Aug 2018037759.403.07$1,156
Jul 2018037165.142.93$1,088
Jun 2018035660.183.08$1,095
May 2018036065.382.90$1,044
Apr 2018034763.842.90$1,007
Mar 2018036561.222.79$1,017
Feb 2018033761.782.77$932
Jan 2018040262.874.01$1,612
Dec 2017037157.272.92$1,084
Nov 2017035755.423.12$1,113
Oct 2017037949.292.98$1,131
Sep 2017037547.523.09$1,158
Aug 2017039445.373.00$1,184
Jul 2017039243.873.09$1,210
Jun 2017040142.493.09$1,238
May 2017040245.373.26$1,312
Apr 2017040247.933.21$1,291
Mar 2017041846.772.98$1,247
Feb 2017038750.452.95$1,143
Jan 2017042249.413.42$1,443
Dec 2016044248.763.72$1,645
Nov 2016043942.492.64$1,161
Oct 2016046746.193.09$1,443
Sep 2016045541.553.10$1,411
Aug 2016046141.442.92$1,348
Jul 2016046941.622.92$1,372
Jun 2016045945.352.69$1,233
May 2016049242.521.99$980
Apr 2016048436.561.99$964
Mar 2016049133.011.79$881
Feb 2016045126.472.06$931
Jan 2016047727.352.36$1,128
Dec 2015050032.362.00$1,001
Nov 2015052038.792.17$1,127
Oct 2015050243.552.43$1,218
Sep 2015049742.992.76$1,371
Aug 2015053140.162.87$1,525
Jul 2015054348.152.95$1,599
Jun 2015055656.152.88$1,603
May 2015557555.212.96$1,975
Apr 2015056849.822.71$1,537
Mar 2015059242.892.93$1,737
Feb 2015052244.662.98$1,554
Jan 2015060043.433.10$1,860
Dec 2014060754.693.59$2,180
Nov 2014061070.464.25$2,594
Oct 2014064478.303.90$2,512
Sep 2014061686.164.05$2,492
Aug 2014067789.394.04$2,732
Jul 2014064496.564.18$2,692
Jun 2014064498.164.74$3,051
May 2014069894.734.73$3,299
Apr 2014068495.944.81$3,289
Mar 2014075095.895.06$3,793
Feb 2014072797.406.19$4,502
Jan 201401,01290.404.86$4,919
Dec 2013097191.824.35$4,228
Nov 2013075988.853.74$2,837
Oct 2013099997.423.78$3,776
Sep 20130960104.113.72$3,569
Aug 201301,022104.253.52$3,600
Jul 201301,153102.523.72$4,287
Jun 201301,76194.403.93$6,927
May 201301,77094.834.15$7,344
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 201304091.603.42$137
Dec 2012039586.773.42$1,351
Nov 2012095386.953.62$3,455
Oct 2012096789.383.40$3,287
Sep 2012093894.672.92$2,737
Aug 201201,01192.662.91$2,940
Jul 201201,01785.133.02$3,072
Jun 2012082979.822.52$2,088
May 2012095991.612.49$2,386
Apr 20120905101.652.00$1,807
Mar 20120986105.052.22$2,191
Feb 20120760101.102.57$1,953
Jan 201201,04098.092.73$2,843
Dec 201101,23896.873.24$4,011
Nov 201101,24595.723.31$4,123
Oct 201101,26984.983.65$4,630
Sep 2011061283.623.99$2,439
Aug 2011087383.404.15$3,622
Jul 201101,15194.144.52$5,199
Jun 201101,15692.904.64$5,364
May 201101,24898.134.40$5,497
Apr 201101,069105.964.33$4,632
Mar 2011086996.364.06$3,526
Feb 201101,00585.644.18$4,201
Jan 201101,27786.504.59$5,860
Dec 201001,42785.734.35$6,204
Nov 201001,80080.843.80$6,832
Oct 2010094978.103.51$3,330
Sep 2010093372.633.98$3,713
Aug 2010094173.684.42$4,159
Jul 2010099272.554.74$4,699
Jun 2010084870.364.91$4,164
May 201001,34871.124.24$5,709
Apr 201011,37681.694.12$5,755
Mar 201001,42778.394.39$6,263
Feb 201021,28373.585.44$7,130
Jan 201081,55974.365.96$9,893
Dec 200901,66971.445.48$9,152
Nov 200901,65674.593.75$6,212
Oct 200901,72972.544.11$7,107
Sep 200901,68265.543.06$5,155
Aug 200901,71167.423.22$5,507
Jul 200901,56161.133.46$5,408
Jun 200901,63366.163.90$6,361
May 200901,76354.743.93$6,921
Apr 200901,83846.773.59$6,594
Mar 200901,96542.144.06$7,976
Feb 200901,88532.814.63$8,733
Jan 200902,07535.865.37$11,145
Dec 200892,18637.105.98$13,400
Nov 200802,20955.496.86$15,155
Oct 200802,35275.246.92$16,281
Sep 200802,378101.767.88$18,732
Aug 200802,497114.228.48$21,182
Jul 200802,523131.0811.39$28,736
Jun 200802,615131.3313.03$34,080
May 200802,745123.1711.57$31,771
Apr 200892,801110.3110.45$30,277
Mar 200803,019101.909.66$29,176
Feb 200802,95292.538.77$25,891
Jan 200803,31590.388.21$27,202
Dec 200773,61988.337.30$27,044
Nov 200703,76391.677.29$27,439
Oct 200703,97182.856.92$27,487
Sep 200724,32975.846.24$27,183
Aug 200705,12569.066.39$32,738
Jul 200716,39270.906.39$40,903
Jun 200701,83562.007.55$13,851

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  308 Mcf  × $  3.05 =       $938

────────────────────────────────────────────────────
Month total                                     $938

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236350 is the state's own key, not one this site invented.