HICKS 23

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236504District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$472 k
Jul 2007 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02179882
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16 bbl$1,030
GasProduction92,712 Mcf$471,185
Total$472,215

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5414, -100.8477. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54135, -100.84769 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,716 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,716 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-43538414168,716 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 20260177106.413.05$539
Apr 2026017198.932.87$491
Mar 2026017689.753.15$554
Feb 2026016163.503.75$604
Jan 2026017059.138.00$1,360
Dec 2025018256.664.41$803
Nov 2025018158.593.93$711
Oct 2025018459.383.30$608
Sep 2025018162.743.08$557
Aug 2025019363.933.01$582
Jul 2025019966.743.32$660
Jun 2025021366.483.13$666
May 2025032160.553.23$1,038
Apr 202509462.363.54$333
Mar 20250067.704.27$0
Feb 202501970.884.34$82
Jan 202502974.324.28$124
Dec 202405268.993.12$162
Nov 202404269.052.20$92
Oct 202404571.372.28$103
Sep 202403369.612.36$78
Aug 202402975.632.06$60
Jul 202403779.932.15$79
Jun 202404578.082.63$119
May 202406378.812.20$139
Apr 202407684.451.66$126
Mar 202407180.301.55$110
Feb 202406076.091.78$107
Jan 202407573.023.30$247
Dec 202306471.262.61$167
Nov 202307077.892.81$197
Oct 2023011085.443.09$340
Sep 202309689.042.74$263
Aug 2023010380.522.67$275
Jul 2023011274.852.64$296
Jun 2023012468.962.26$280
May 2023015970.622.23$354
Apr 2023017078.122.24$380
Mar 2023018072.852.39$431
Feb 2023015575.112.47$382
Jan 2023017076.533.39$576
Dec 2022017976.415.73$1,026
Nov 2022018385.005.65$1,033
Oct 2022019887.185.86$1,161
Sep 2022019484.888.16$1,584
Aug 2022018794.529.13$1,707
Jul 20220187101.587.54$1,410
Jun 20220180115.097.98$1,436
May 20220194109.378.43$1,636
Apr 20220189104.226.84$1,292
Mar 20220209108.885.08$1,061
Feb 2022018791.054.86$909
Jan 2022020681.844.54$935
Dec 2021021671.323.90$842
Nov 2021020677.435.24$1,079
Oct 2021020879.795.71$1,188
Sep 2021020269.865.35$1,081
Aug 2021021366.024.22$899
Jul 2021021670.783.98$860
Jun 2021020969.493.38$707
May 2021022063.483.02$664
Apr 2021021360.362.76$588
Mar 2021021661.302.72$587
Feb 2021020157.805.55$1,115
Jan 2021022950.412.81$644
Dec 2020020944.642.68$559
Nov 2020019938.772.71$539
Oct 2020020436.972.48$506
Sep 2020020637.091.99$410
Aug 2020020839.982.39$496
Jul 2020020938.371.83$381
Jun 2020020134.901.69$340
May 2020020216.921.81$367
Apr 2020020914.751.80$377
Mar 2020022430.341.86$416
Feb 2020021849.881.98$432
Jan 2020020157.252.09$421
Dec 2019020059.012.30$461
Nov 2019020855.302.75$572
Oct 2019020853.472.42$503
Sep 2019020555.052.66$545
Aug 2019021653.112.30$498
Jul 2019023656.272.46$581
Jun 2019019652.782.49$488
May 2019023458.482.74$641
Apr 2019022862.632.75$627
Mar 2019023756.803.06$726
Feb 2019021350.852.79$595
Jan 2019024146.033.23$778
Dec 2018024046.594.19$1,005
Nov 2018023952.934.24$1,013
Oct 2018023061.443.40$782
Sep 2018021259.543.11$659
Aug 2018022559.403.07$690
Jul 2018018165.142.93$531
Jun 2018017060.183.08$523
May 2018019465.382.90$563
Apr 2018032163.842.90$931
Mar 2018027461.222.79$764
Feb 2018026261.782.77$725
Jan 20180862.874.01$32
Dec 2017013057.272.92$380
Nov 2017014155.423.12$440
Oct 2017014749.292.98$439
Sep 2017013947.523.09$429
Aug 2017014145.373.00$424
Jul 2017014843.873.09$457
Jun 2017020442.493.09$630
May 2017025145.373.26$819
Apr 2017025847.933.21$829
Mar 2017028846.772.98$859
Feb 2017025350.452.95$747
Jan 2017023649.413.42$807
Dec 2016027248.763.72$1,013
Nov 2016030442.492.64$804
Oct 2016029446.193.09$909
Sep 2016030041.553.10$930
Aug 2016030041.442.92$877
Jul 2016032041.622.92$936
Jun 2016032445.352.69$870
May 2016034142.521.99$679
Apr 2016033536.561.99$667
Mar 2016035233.011.79$631
Feb 2016032026.472.06$660
Jan 2016034327.352.36$811
Dec 2015036032.362.00$721
Nov 2015033438.792.17$724
Oct 2015034543.552.43$837
Sep 2015033942.992.76$935
Aug 2015034940.162.87$1,003
Jul 2015035948.152.95$1,057
Jun 2015035156.152.88$1,012
May 2015336455.212.96$1,241
Apr 2015037249.822.71$1,007
Mar 2015037942.892.93$1,112
Feb 2015035444.662.98$1,054
Jan 2015039843.433.10$1,234
Dec 2014041054.693.59$1,472
Nov 2014041770.464.25$1,773
Oct 2014037978.303.90$1,478
Sep 2014033186.164.05$1,339
Aug 2014034589.394.04$1,392
Jul 2014041396.564.18$1,726
Jun 2014052698.164.74$2,492
May 20140894.734.73$38
Apr 2014037595.944.81$1,803
Mar 2014041795.895.06$2,109
Feb 2014037297.406.19$2,303
Jan 2014037190.404.86$1,803
Dec 2013029591.824.35$1,285
Nov 2013035588.853.74$1,327
Oct 2013037797.423.78$1,425
Sep 20131363104.113.72$1,454
Aug 20130366104.253.52$1,289
Jul 20130375102.523.72$1,394
Jun 2013135694.403.93$1,495
May 2013038294.834.15$1,585
Apr 2013037993.964.28$1,623
Mar 2013040893.623.91$1,596
Feb 2013038191.233.42$1,303
Jan 2013043491.603.42$1,484
Dec 2012045186.773.42$1,542
Nov 2012044386.953.62$1,606
Oct 2012034189.383.40$1,159
Sep 2012038694.672.92$1,127
Aug 2012042792.662.91$1,242
Jul 2012045585.133.02$1,374
Jun 2012043279.822.52$1,088
May 2012044191.612.49$1,097
Apr 20120444101.652.00$887
Mar 20120473105.052.22$1,051
Feb 20120464101.102.57$1,193
Jan 2012049698.092.73$1,356
Dec 2011050296.873.24$1,626
Nov 2011049495.723.31$1,636
Oct 2011053884.983.65$1,963
Sep 2011052483.623.99$2,089
Aug 2011056083.404.15$2,324
Jul 2011055894.144.52$2,521
Jun 2011053192.904.64$2,464
May 2011058698.134.40$2,581
Apr 20110543105.964.33$2,353
Mar 2011058496.364.06$2,369
Feb 2011048885.644.18$2,040
Jan 2011060886.504.59$2,790
Dec 2010060185.734.35$2,613
Nov 2010059880.843.80$2,270
Oct 2010063278.103.51$2,218
Sep 2010063072.633.98$2,507
Aug 2010067073.684.42$2,961
Jul 2010164872.554.74$3,142
Jun 2010043770.364.91$2,146
May 2010061771.124.24$2,613
Apr 2010060381.694.12$2,486
Mar 2010061678.394.39$2,703
Feb 2010051573.585.44$2,803
Jan 2010458074.365.96$3,757
Dec 2009059771.445.48$3,274
Nov 2009060374.593.75$2,262
Oct 2009062872.544.11$2,581
Sep 2009061165.543.06$1,873
Aug 2009066267.423.22$2,131
Jul 2009081661.133.46$2,827
Jun 2009080366.163.90$3,128
May 2009083854.743.93$3,290
Apr 2009085946.773.59$3,082
Mar 2009089042.144.06$3,613
Feb 2009082032.814.63$3,799
Jan 2009091735.865.37$4,925
Dec 2008595137.105.98$5,870
Nov 2008095055.496.86$6,517
Oct 200801,02075.246.92$7,060
Sep 200801,036101.767.88$8,161
Aug 200801,396114.228.48$11,842
Jul 200801,437131.0811.39$16,367
Jun 200801,481131.3313.03$19,301
May 200801,612123.1711.57$18,658
Apr 200811,637110.3110.45$17,225
Mar 200801,773101.909.66$17,134
Feb 200801,62492.538.77$14,243
Jan 200801,78290.388.21$14,623
Dec 200701,96388.337.30$14,334
Nov 200702,03391.677.29$14,824
Oct 200702,26382.856.92$15,664
Sep 200702,37975.846.24$14,855
Aug 200702,71969.066.39$17,369
Jul 2007011470.906.39$728

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  177 Mcf  × $  3.05 =       $539

────────────────────────────────────────────────────
Month total                                     $539

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well