MAYER, EDWIN S. JR. "F"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236581District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$533 k
Jul 2007 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02179880
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition300 bbl$17,743
GasProduction108,312 Mcf$514,802
Total$532,545

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7291, -100.8975. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.72911, -100.89751 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,450 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,450 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-4133246188,450 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 20260133106.413.05$405
Apr 2026014198.932.87$405
Mar 2026014589.753.15$457
Feb 2026113663.503.75$574
Jan 2026015459.138.00$1,232
Dec 2025015056.664.41$662
Nov 2025114658.593.93$632
Oct 2025015459.383.30$509
Sep 2025015162.743.08$465
Aug 2025116763.933.01$567
Jul 2025112666.743.32$484
Jun 202503266.483.13$100
May 202516360.553.23$264
Apr 2025110262.363.54$424
Mar 2025311567.704.27$694
Feb 2025210170.884.34$580
Jan 2025111974.324.28$583
Dec 2024311268.993.12$557
Nov 2024111469.052.20$320
Oct 2024212171.372.28$419
Sep 2024112169.612.36$356
Aug 2024213975.632.06$438
Jul 2024215379.932.15$488
Jun 2024415278.082.63$713
May 2024214878.812.20$483
Apr 2024415984.451.66$602
Mar 2024417180.301.55$585
Feb 2024316576.091.78$523
Jan 2024518473.023.30$972
Dec 2023118471.262.61$552
Nov 2023718277.892.81$1,056
Oct 2023019485.443.09$599
Sep 2023319289.042.74$792
Aug 2023220280.522.67$701
Jul 2023220574.852.64$691
Jun 2023420268.962.26$732
May 2023321470.622.23$689
Apr 2023420378.122.24$767
Mar 2023721372.852.39$1,020
Feb 2023219375.112.47$626
Jan 2023522176.533.39$1,131
Dec 2022220676.415.73$1,333
Nov 2022217985.005.65$1,181
Oct 2022120187.185.86$1,266
Sep 2022320884.888.16$1,953
Aug 2022023194.529.13$2,108
Jul 20221247101.587.54$1,964
Jun 20220260115.097.98$2,074
May 20221282109.378.43$2,487
Apr 20220312104.226.84$2,133
Mar 20220311108.885.08$1,579
Feb 2022031091.054.86$1,506
Jan 2022037781.844.54$1,711
Dec 202118071.323.90$383
Nov 2021123977.435.24$1,329
Oct 2021217479.795.71$1,154
Sep 2021124469.865.35$1,375
Aug 2021129866.024.22$1,324
Jul 2021429570.783.98$1,458
Jun 2021529069.493.38$1,328
May 2021529863.483.02$1,217
Apr 2021428560.362.76$1,028
Mar 2021129861.302.72$871
Feb 2021126557.805.55$1,528
Jan 2021329250.412.81$972
Dec 2020130144.642.68$850
Nov 2020129338.772.71$832
Oct 2020130836.972.48$800
Sep 2020130337.091.99$640
Aug 2020131739.982.39$796
Jul 2020131138.371.83$606
Jun 2020130434.901.69$549
May 2020167516.921.81$1,242
Apr 2020231814.751.80$603
Mar 2020126830.341.86$528
Feb 2020128349.881.98$610
Jan 2020130657.252.09$698
Dec 2019031659.012.30$728
Nov 2019033055.302.75$908
Oct 2019032253.472.42$779
Sep 2019027855.052.66$739
Aug 2019025253.112.30$581
Jul 2019034156.272.46$839
Jun 2019029152.782.49$725
May 2019036158.482.74$989
Apr 2019140262.632.75$1,168
Mar 2019225256.803.06$885
Feb 2019220050.852.79$660
Jan 20191528546.033.23$1,610
Dec 2018129346.594.19$1,273
Nov 2018528852.934.24$1,485
Oct 2018233361.443.40$1,254
Sep 20181031159.543.11$1,562
Aug 2018433059.403.07$1,250
Jul 2018631765.142.93$1,320
Jun 20181131460.183.08$1,628
May 2018730965.382.90$1,354
Apr 2018632363.842.90$1,320
Mar 2018233561.222.79$1,056
Feb 2018130761.782.77$911
Jan 2018225062.874.01$1,128
Dec 2017128457.272.92$887
Nov 2017229055.423.12$1,015
Oct 2017331449.292.98$1,085
Sep 2017230847.523.09$1,046
Aug 2017132645.373.00$1,025
Jul 2017334043.873.09$1,181
Jun 2017232942.493.09$1,101
May 2017331745.373.26$1,171
Apr 2017333747.933.21$1,226
Mar 2017436246.772.98$1,267
Feb 2017434850.452.95$1,229
Jan 2017439249.413.42$1,538
Dec 2016336848.763.72$1,516
Nov 2016334242.492.64$1,032
Oct 2016232746.193.09$1,103
Sep 2016225441.553.10$871
Aug 2016221941.442.92$723
Jul 2016232941.622.92$1,045
Jun 2016235845.352.69$1,052
May 2016438642.521.99$939
Apr 2016436536.561.99$873
Mar 2016339133.011.79$800
Feb 2016437626.472.06$882
Jan 2016441427.352.36$1,088
Dec 2015339032.362.00$878
Nov 2015236838.792.17$875
Oct 2015436443.552.43$1,057
Sep 2015342042.992.76$1,288
Aug 2015245140.162.87$1,376
Jul 2015447348.152.95$1,586
Jun 2015042556.152.88$1,225
May 2015031455.212.96$928
Apr 2015035249.822.71$953
Mar 2015040642.892.93$1,191
Feb 2015040444.662.98$1,202
Jan 2015045543.433.10$1,411
Dec 2014051154.693.59$1,835
Nov 2014042770.464.25$1,816
Oct 2014044078.303.90$1,716
Sep 2014043286.164.05$1,748
Aug 2014045789.394.04$1,844
Jul 2014046096.564.18$1,923
Jun 2014045398.164.74$2,146
May 2014047894.734.73$2,259
Apr 2014046995.944.81$2,255
Mar 2014049695.895.06$2,508
Feb 2014045797.406.19$2,830
Jan 2014048390.404.86$2,348
Dec 2013048691.824.35$2,116
Nov 2013044188.853.74$1,649
Oct 2013048097.423.78$1,814
Sep 20130485104.113.72$1,803
Aug 20130513104.253.52$1,807
Jul 20130516102.523.72$1,918
Jun 2013050294.403.93$1,975
May 2013052094.834.15$2,158
Apr 2013050993.964.28$2,180
Mar 2013053493.623.91$2,089
Feb 2013047991.233.42$1,638
Jan 2013055391.603.42$1,891
Dec 2012057886.773.42$1,977
Nov 2012059786.953.62$2,164
Oct 2012166589.383.40$2,350
Sep 2012059494.672.92$1,734
Aug 2012039392.662.91$1,143
Jul 2012034985.133.02$1,054
Jun 2012054879.822.52$1,380
May 2012033791.612.49$839
Apr 20120346101.652.00$691
Mar 20120404105.052.22$898
Feb 20120471101.102.57$1,211
Jan 2012052098.092.73$1,422
Dec 2011052796.873.24$1,707
Nov 2011056995.723.31$1,884
Oct 2011061984.983.65$2,258
Sep 2011060883.623.99$2,423
Aug 2011067283.404.15$2,788
Jul 2011067894.144.52$3,063
Jun 2011064992.904.64$3,011
May 2011072998.134.40$3,211
Apr 20110593105.964.33$2,570
Mar 2011065196.364.06$2,641
Feb 2011059085.644.18$2,466
Jan 2011066986.504.59$3,070
Dec 2010045085.734.35$1,956
Nov 2010065380.843.80$2,478
Oct 2010073678.103.51$2,583
Sep 2010074672.633.98$2,969
Aug 2010084973.684.42$3,752
Jul 2010073072.554.74$3,458
Jun 2010066070.364.91$3,241
May 2010072071.124.24$3,049
Apr 2010087681.694.12$3,611
Mar 2010090778.394.39$3,981
Feb 2010082973.585.44$4,512
Jan 2010089274.365.96$5,320
Dec 2009079971.445.48$4,382
Nov 2009094074.593.75$3,526
Oct 2009094472.544.11$3,880
Sep 2009089365.543.06$2,737
Aug 2009074667.423.22$2,401
Jul 2009085861.133.46$2,973
Jun 2009098566.163.90$3,837
May 200901,01254.743.93$3,973
Apr 200901,05746.773.59$3,792
Mar 2009090842.144.06$3,686
Feb 2009079232.814.63$3,669
Jan 2009099235.865.37$5,328
Dec 2008089637.105.98$5,356
Nov 2008087255.496.86$5,982
Oct 2008097075.246.92$6,714
Sep 20080959101.767.88$7,554
Aug 200801,176114.228.48$9,976
Jul 200801,165131.0811.39$13,269
Jun 200801,252131.3313.03$16,317
May 200801,413123.1711.57$16,354
Apr 200801,330110.3110.45$13,905
Mar 200801,475101.909.66$14,255
Feb 200801,33992.538.77$11,744
Jan 200801,49290.388.21$12,243
Dec 200701,68288.337.30$12,282
Nov 200701,84591.677.29$13,453
Oct 200701,84382.856.92$12,757
Sep 200702,53575.846.24$15,829
Aug 200703,50469.066.39$22,383
Jul 2007096770.906.39$6,177

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  133 Mcf  × $  3.05 =       $405

────────────────────────────────────────────────────
Month total                                     $405

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well