Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236629District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$593 k
Jul 2007 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02179720
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition69 bbl$4,393
GasProduction108,846 Mcf$588,546
Total$592,939

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4469, -100.7498. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44692, -100.74979 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,600 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-4353843588,600 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 2026087106.413.05$265
Apr 202607698.932.87$218
Mar 202607889.753.15$246
Feb 202607663.503.75$285
Jan 202608059.138.00$640
Dec 202508156.664.41$357
Nov 202508558.593.93$334
Oct 202508559.383.30$281
Sep 202509262.743.08$283
Aug 202509463.933.01$283
Jul 202508166.743.32$269
Jun 202508566.483.13$266
May 202509460.553.23$304
Apr 202509162.363.54$322
Mar 202509467.704.27$401
Feb 202508170.884.34$352
Jan 202509174.324.28$389
Dec 202409268.993.12$287
Nov 202408969.052.20$196
Oct 202409571.372.28$217
Sep 202409169.612.36$215
Aug 202409475.632.06$194
Jul 202408779.932.15$187
Jun 202409178.082.63$240
May 202409978.812.20$218
Apr 202409484.451.66$156
Mar 2024010280.301.55$158
Feb 2024010176.091.78$180
Jan 2024011673.023.30$383
Dec 2023010571.262.61$274
Nov 2023010577.892.81$295
Oct 2023010685.443.09$327
Sep 2023010489.042.74$284
Aug 2023010480.522.67$278
Jul 2023010174.852.64$267
Jun 2023010368.962.26$233
May 2023010470.622.23$232
Apr 2023010778.122.24$239
Mar 2023011072.852.39$263
Feb 2023010375.112.47$254
Jan 2023011576.533.39$390
Dec 2022011376.415.73$647
Nov 2022011085.005.65$621
Oct 2022011987.185.86$698
Sep 2022011584.888.16$939
Aug 2022010994.529.13$995
Jul 20220113101.587.54$852
Jun 20220114115.097.98$909
May 20220126109.378.43$1,063
Apr 20220117104.226.84$800
Mar 20220117108.885.08$594
Feb 2022011091.054.86$534
Jan 2022011881.844.54$535
Dec 2021010571.323.90$409
Nov 2021010277.435.24$534
Oct 2021011379.795.71$646
Sep 2021016769.865.35$894
Aug 2021014566.024.22$612
Jul 2021012170.783.98$482
Jun 2021013469.493.38$453
May 2021012163.483.02$365
Apr 2021011860.362.76$325
Mar 2021012661.302.72$342
Feb 2021013157.805.55$727
Jan 2021013050.412.81$365
Dec 2020013344.642.68$356
Nov 2020012438.772.71$336
Oct 2020012836.972.48$317
Sep 2020012837.091.99$255
Aug 2020014139.982.39$336
Jul 2020014038.371.83$256
Jun 2020013434.901.69$227
May 2020087816.921.81$1,593
Apr 2020014214.751.80$256
Mar 2020014030.341.86$260
Feb 2020013949.881.98$275
Jan 2020014957.252.09$312
Dec 2019015259.012.30$350
Nov 2019015255.302.75$418
Oct 2019016653.472.42$401
Sep 2019018755.052.66$497
Aug 2019017753.112.30$408
Jul 2019018256.272.46$448
Jun 2019017552.782.49$436
May 2019019158.482.74$523
Apr 2019018562.632.75$509
Mar 2019018256.803.06$557
Feb 2019017750.852.79$494
Jan 2019019846.033.23$639
Dec 2018019446.594.19$812
Nov 2018019052.934.24$805
Oct 2018020061.443.40$680
Sep 2018019959.543.11$618
Aug 2018020359.403.07$623
Jul 2018020365.142.93$595
Jun 2018019960.183.08$612
May 2018020165.382.90$583
Apr 2018020163.842.90$583
Mar 2018012761.222.79$354
Feb 2018019961.782.77$550
Jan 2018114262.874.01$632
Dec 2017015957.272.92$465
Nov 2017012355.423.12$384
Oct 2017112749.292.98$428
Sep 2017113847.523.09$474
Aug 2017014645.373.00$439
Jul 2017014843.873.09$457
Jun 2017011242.493.09$346
May 201702145.373.26$69
Apr 201701247.933.21$39
Mar 2017112446.772.98$417
Feb 201701250.452.95$35
Jan 201701549.413.42$51
Dec 201611048.763.72$86
Nov 201601542.492.64$40
Oct 201617346.193.09$272
Sep 201602741.553.10$84
Aug 2016013341.442.92$389
Jul 2016022041.622.92$643
Jun 2016010545.352.69$282
May 2016110642.521.99$254
Apr 201609936.561.99$197
Mar 2016010733.011.79$192
Feb 2016010726.472.06$221
Jan 2016112927.352.36$332
Dec 2015013132.362.00$262
Nov 2015113338.792.17$327
Oct 2015013043.552.43$315
Sep 2015014642.992.76$403
Aug 2015018540.162.87$531
Jul 2015031648.152.95$931
Jun 2015026656.152.88$767
May 2015127555.212.96$868
Apr 2015030049.822.71$812
Mar 2015031442.892.93$922
Feb 2015025544.662.98$759
Jan 2015031143.433.10$964
Dec 2014030954.693.59$1,110
Nov 2014031070.464.25$1,318
Oct 2014029978.303.90$1,166
Sep 2014032586.164.05$1,315
Aug 2014034789.394.04$1,400
Jul 2014035696.564.18$1,488
Jun 2014034798.164.74$1,644
May 2014037294.734.73$1,758
Apr 2014038095.944.81$1,827
Mar 2014038595.895.06$1,947
Feb 2014036897.406.19$2,279
Jan 2014045590.404.86$2,212
Dec 2013043191.824.35$1,877
Nov 2013041388.853.74$1,544
Oct 2013046997.423.78$1,773
Sep 20130473104.113.72$1,758
Aug 20130480104.253.52$1,691
Jul 20130570102.523.72$2,119
Jun 2013058094.403.93$2,281
May 2013063294.834.15$2,622
Apr 2013062793.964.28$2,685
Mar 2013067893.623.91$2,653
Feb 2013060691.233.42$2,072
Jan 2013068191.603.42$2,329
Dec 2012070086.773.42$2,394
Nov 2012071286.953.62$2,581
Oct 2012077089.383.40$2,618
Sep 2012079394.672.92$2,314
Aug 2012888992.662.91$3,327
Jul 2012042085.133.02$1,269
Jun 2012045979.822.52$1,156
May 2012044691.612.49$1,110
Apr 20120270101.652.00$539
Mar 20120298105.052.22$662
Feb 20120285101.102.57$733
Jan 2012034498.092.73$941
Dec 2011037696.873.24$1,218
Nov 2011038495.723.31$1,272
Oct 2011042284.983.65$1,540
Sep 2011034283.623.99$1,363
Aug 2011058883.404.15$2,440
Jul 2011070094.144.52$3,162
Jun 201107292.904.64$334
May 2011030498.134.40$1,339
Apr 20110370105.964.33$1,603
Mar 2011052096.364.06$2,110
Feb 2011031785.644.18$1,325
Jan 2011042086.504.59$1,927
Dec 2010063385.734.35$2,752
Nov 2010065580.843.80$2,486
Oct 2010078378.103.51$2,747
Sep 2010085172.633.98$3,387
Aug 2010096473.684.42$4,260
Jul 2010084072.554.74$3,979
Jun 2010081870.364.91$4,017
May 2010077571.124.24$3,282
Apr 2010095881.694.12$3,950
Mar 201001,01778.394.39$4,463
Feb 2010093773.585.44$5,099
Jan 201001,03774.365.96$6,185
Dec 2009093971.445.48$5,149
Nov 200901,05074.593.75$3,939
Oct 200901,15672.544.11$4,751
Sep 200901,14965.543.06$3,521
Aug 200921,20467.423.22$4,010
Jul 200911,24461.133.46$4,371
Jun 200921,25166.163.90$5,005
May 200921,16754.743.93$4,691
Apr 200931,29746.773.59$4,793
Mar 200951,34842.144.06$5,682
Feb 200951,19932.814.63$5,719
Jan 200941,40535.865.37$7,690
Dec 200851,49937.105.98$9,145
Nov 200851,33155.496.86$9,409
Oct 200851,68875.246.92$12,061
Sep 200851,680101.767.88$13,742
Aug 200811,577114.228.48$13,492
Jul 200801,474131.0811.39$16,788
Jun 200801,558131.3313.03$20,305
May 200801,740123.1711.57$20,139
Apr 200821,853110.3110.45$19,593
Mar 200842,070101.909.66$20,412
Feb 200802,06792.538.77$18,129
Jan 200802,41390.388.21$19,800
Dec 200702,69788.337.30$19,693
Nov 200703,06591.677.29$22,349
Oct 200703,43082.856.92$23,742
Sep 200704,05375.846.24$25,308
Aug 200705,66969.066.39$36,213
Jul 200703,66070.906.39$23,380

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   87 Mcf  × $  3.05 =       $265

────────────────────────────────────────────────────
Month total                                     $265

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236629 is the state's own key, not one this site invented.