SHURLEY 148

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236648District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$664 k
Sep 2007 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02181029
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition670 bbl$55,682
GasProduction111,503 Mcf$608,123
Total$663,805

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4535, -100.7187. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45355, -100.71866 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,139 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,139 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-43538422137,139 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

May 202600106.413.05$0
Apr 20260698.932.87$17
Mar 202603889.753.15$120
Feb 202603663.503.75$135
Jan 202604259.138.00$336
Dec 202504356.664.41$190
Nov 202502658.593.93$102
Oct 202502959.383.30$96
Sep 202503262.743.08$98
Aug 202503363.933.01$99
Jul 202503366.743.32$109
Jun 202502966.483.13$91
May 202503160.553.23$100
Apr 202503562.363.54$124
Mar 202504167.704.27$175
Feb 202502670.884.34$113
Jan 202505574.324.28$235
Dec 202401968.993.12$59
Nov 202402869.052.20$62
Oct 202404071.372.28$91
Sep 202404169.612.36$97
Aug 202404475.632.06$91
Jul 202404579.932.15$97
Jun 202404278.082.63$111
May 202404078.812.20$88
Apr 202404384.451.66$71
Mar 202403980.301.55$60
Feb 202404076.091.78$71
Jan 202404773.023.30$155
Dec 202304771.262.61$123
Nov 202304977.892.81$138
Oct 202304885.443.09$148
Sep 202305289.042.74$142
Aug 202305080.522.67$134
Jul 202304774.852.64$124
Jun 202305268.962.26$117
May 202305370.622.23$118
Apr 202305578.122.24$123
Mar 202305672.852.39$134
Feb 202305175.112.47$126
Jan 202306076.533.39$203
Dec 202206076.415.73$344
Nov 202206185.005.65$344
Oct 202206487.185.86$375
Sep 202205984.888.16$482
Aug 202206294.529.13$566
Jul 2022062101.587.54$468
Jun 2022066115.097.98$527
May 2022067109.378.43$565
Apr 2022064104.226.84$438
Mar 2022069108.885.08$350
Feb 202206391.054.86$306
Jan 202207081.844.54$318
Dec 202107071.323.90$273
Nov 202106877.435.24$356
Oct 202107579.795.71$429
Sep 202106869.865.35$364
Aug 202107366.024.22$308
Jul 202107370.783.98$291
Jun 202107469.493.38$250
May 202106863.483.02$205
Apr 202107660.362.76$210
Mar 202107861.302.72$212
Feb 202105557.805.55$305
Jan 202107750.412.81$216
Dec 202008344.642.68$222
Nov 202008438.772.71$227
Oct 202009636.972.48$238
Sep 202009037.091.99$179
Aug 202009939.982.39$236
Jul 202009638.371.83$175
Jun 2020010434.901.69$176
May 2020012016.921.81$218
Apr 2020012914.751.80$233
Mar 2020013130.341.86$243
Feb 2020014049.881.98$277
Jan 2020016657.252.09$348
Dec 2019017359.012.30$399
Nov 2019018355.302.75$503
Oct 2019020053.472.42$484
Sep 2019018755.052.66$497
Aug 2019022353.112.30$514
Jul 2019023756.272.46$583
Jun 2019024052.782.49$598
May 2019024858.482.74$680
Apr 2019025862.632.75$710
Mar 2019014856.803.06$453
Feb 201901150.852.79$31
Jan 20190946.033.23$29
Dec 20180946.594.19$38
Nov 20180152.934.24$4
Oct 2018016461.443.40$557
Sep 20180259.543.11$6
Aug 201803559.403.07$107
Jul 201801865.142.93$53
Jun 20180760.183.08$22
May 20180365.382.90$9
Apr 20180563.842.90$15
Mar 20180961.222.79$25
Feb 201805661.782.77$155
Jan 2018034262.874.01$1,371
Dec 2017025757.272.92$751
Nov 2017032755.423.12$1,020
Oct 2017036049.292.98$1,074
Sep 2017036947.523.09$1,139
Aug 2017035345.373.00$1,061
Jul 2017036743.873.09$1,133
Jun 2017039042.493.09$1,204
May 2017041145.373.26$1,341
Apr 2017041147.933.21$1,320
Mar 2017046146.772.98$1,375
Feb 201709350.452.95$275
Jan 2017035549.413.42$1,214
Dec 2016035948.763.72$1,337
Nov 2016033042.492.64$873
Oct 2016034446.193.09$1,063
Sep 2016033441.553.10$1,036
Aug 2016134541.442.92$1,050
Jul 2016038241.622.92$1,117
Jun 2016137945.352.69$1,063
May 2016139542.521.99$829
Apr 2016138936.561.99$811
Mar 2016140033.011.79$751
Feb 2016139026.472.06$831
Jan 2016242627.352.36$1,062
Dec 2015143132.362.00$895
Nov 2015142238.792.17$953
Oct 2015251143.552.43$1,327
Sep 2015247042.992.76$1,382
Aug 2015251040.162.87$1,545
Jul 2015451148.152.95$1,698
Jun 2015353056.152.88$1,696
May 2015255655.212.96$1,754
Apr 2015343749.822.71$1,332
Mar 2015271542.892.93$2,184
Feb 201503544.662.98$104
Jan 20150343.433.10$9
Dec 20140254.693.59$7
Nov 20141270.464.25$79
Oct 2014125578.303.90$1,073
Sep 201418386.164.05$422
Aug 2014026089.394.04$1,049
Jul 2014010596.564.18$439
Jun 201404798.164.74$223
May 2014210794.734.73$695
Apr 2014327295.944.81$1,596
Mar 2014239595.895.06$2,189
Feb 2014241697.406.19$2,771
Jan 2014229490.404.86$1,610
Dec 2013334791.824.35$1,786
Nov 2013450188.853.74$2,228
Oct 2013355697.423.78$2,394
Sep 20133555104.113.72$2,376
Aug 20132580104.253.52$2,252
Jul 20132438102.523.72$1,833
Jun 2013345894.403.93$2,085
May 2013353994.834.15$2,521
Apr 2013554393.964.28$2,795
Mar 2013360193.623.91$2,632
Feb 2013454591.233.42$2,229
Jan 2013557391.603.42$2,418
Dec 2012458386.773.42$2,341
Nov 2012458586.953.62$2,468
Oct 2012249689.383.40$1,865
Sep 2012341094.672.92$1,481
Aug 2012257492.662.91$1,855
Jul 2012362685.133.02$2,146
Jun 2012351079.822.52$1,524
May 2012255891.612.49$1,572
Apr 20124525101.652.00$1,455
Mar 20124590105.052.22$1,731
Feb 20123613101.102.57$1,879
Jan 2012467998.092.73$2,249
Dec 2011476596.873.24$2,866
Nov 2011456195.723.31$2,241
Oct 2011351184.983.65$2,119
Sep 2011255783.623.99$2,387
Aug 2011463183.404.15$2,952
Jul 2011468294.144.52$3,457
Jun 2011469992.904.64$3,615
May 2011472098.134.40$3,564
Apr 20115699105.964.33$3,559
Mar 2011676496.364.06$3,678
Feb 2011461185.644.18$2,897
Jan 2011784086.504.59$4,460
Dec 2010778985.734.35$4,030
Nov 2010576680.843.80$3,311
Oct 2010481678.103.51$3,176
Sep 2010585872.633.98$3,778
Aug 2010488673.684.42$4,210
Jul 2010582672.554.74$4,275
Jun 2010494070.364.91$4,897
May 2010785871.124.24$4,132
Apr 2010790481.694.12$4,299
Mar 2010696078.394.39$4,683
Feb 2010583273.585.44$4,896
Jan 2010799474.365.96$6,449
Dec 200961,12471.445.48$6,592
Nov 200981,05074.593.75$4,536
Oct 200951,10672.544.11$4,909
Sep 200941,04765.543.06$3,471
Aug 200971,17667.423.22$4,257
Jul 200971,30261.133.46$4,939
Jun 200951,33966.163.90$5,546
May 2009121,57454.743.93$6,836
Apr 2009111,32546.773.59$5,268
Mar 2009111,58642.144.06$6,901
Feb 200971,50832.814.63$7,216
Jan 2009111,66635.865.37$9,343
Dec 2008111,70637.105.98$10,605
Nov 2008111,82355.496.86$13,117
Oct 2008131,96375.246.92$14,566
Sep 2008111,980101.767.88$16,716
Aug 200892,185114.228.48$19,563
Jul 200892,289131.0811.39$27,250
Jun 2008112,387131.3313.03$32,554
May 2008152,669123.1711.57$32,739
Apr 2008122,771110.3110.45$30,294
Mar 2008102,521101.909.66$25,382
Feb 2008542,32292.538.77$25,362
Jan 2008512,59390.388.21$25,887
Dec 2007492,71388.337.30$24,138
Nov 2007363,02591.677.29$25,358
Oct 200703,55282.856.92$24,587
Sep 2007354,40075.846.24$30,129

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    6 Mcf  × $  2.87 =        $17

────────────────────────────────────────────────────
Month total                                      $17

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236648 is the state's own key, not one this site invented.