JONES RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236772District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Sep 2007 – May 2026
Value, last 12 filed months
$850
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-03181291
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition139 bbl$11,217
GasProduction213,152 Mcf$1,460,918
Total$1,472,136

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6771, -100.7113. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67705, -100.71130 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,510 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,510 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-4353850215537,510 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

May 202607106.413.05$21
Apr 202604098.932.87$115
Mar 202601389.753.15$41
Feb 202602163.503.75$79
Jan 202602259.138.00$176
Dec 202505056.664.41$221
Nov 20250758.593.93$27
Oct 20250159.383.30$3
Sep 20250962.743.08$28
Aug 202501363.933.01$39
Jul 202501366.743.32$43
Jun 202501866.483.13$56
May 202501560.553.23$48
Apr 20250662.363.54$21
Mar 20250767.704.27$30
Feb 202501070.884.34$43
Jan 20250774.324.28$30
Dec 202402168.993.12$66
Nov 202402769.052.20$59
Oct 202405471.372.28$123
Sep 202411169.612.36$96
Aug 202404875.632.06$99
Jul 202401779.932.15$36
Jun 202401778.082.63$45
May 202402978.812.20$64
Apr 202405184.451.66$85
Mar 202401480.301.55$22
Feb 202404276.091.78$75
Jan 202401073.023.30$33
Dec 20230671.262.61$16
Nov 20230377.892.81$8
Oct 20230185.443.09$3
Sep 202301689.042.74$44
Aug 202302080.522.67$53
Jul 202302174.852.64$55
Jun 202312268.962.26$119
May 202302470.622.23$53
Apr 202302378.122.24$51
Mar 202302572.852.39$60
Feb 202302475.112.47$59
Jan 202302776.533.39$91
Dec 202203376.415.73$189
Nov 202202985.005.65$164
Oct 202202987.185.86$170
Sep 202202784.888.16$220
Aug 202203394.529.13$301
Jul 2022030101.587.54$226
Jun 2022033115.097.98$263
May 2022035109.378.43$295
Apr 2022029104.226.84$198
Mar 2022021108.885.08$107
Feb 202202491.054.86$117
Jan 202204581.844.54$204
Dec 202104271.323.90$164
Nov 202104377.435.24$225
Oct 202104479.795.71$251
Sep 202104169.865.35$219
Aug 202104666.024.22$194
Jul 202105070.783.98$199
Jun 202104869.493.38$162
May 202105263.483.02$157
Apr 202105360.362.76$146
Mar 202105761.302.72$155
Feb 202106057.805.55$333
Jan 202106350.412.81$177
Dec 202006744.642.68$179
Nov 202006438.772.71$173
Oct 202006736.972.48$166
Sep 202006437.091.99$127
Aug 202006539.982.39$155
Jul 202006838.371.83$124
Jun 202005834.901.69$98
May 202005716.921.81$103
Apr 202006214.751.80$112
Mar 202007530.341.86$139
Feb 202007249.881.98$143
Jan 202008157.252.09$170
Dec 201988359.012.30$663
Nov 201907855.302.75$215
Oct 201907753.472.42$186
Sep 201906255.052.66$165
Aug 201908453.112.30$194
Jul 201908656.272.46$212
Jun 201907752.782.49$192
May 201909158.482.74$249
Apr 201908962.632.75$245
Mar 201909656.803.06$294
Feb 201908950.852.79$249
Jan 2019010246.033.23$329
Dec 2018010746.594.19$448
Nov 2018010352.934.24$436
Oct 2018011061.443.40$374
Sep 2018010859.543.11$336
Aug 2018011359.403.07$347
Jul 2018011765.142.93$343
Jun 2018011460.183.08$351
May 2018112165.382.90$416
Apr 2018011963.842.90$345
Mar 2018113261.222.79$429
Feb 2018112361.782.77$402
Jan 2018114262.874.01$632
Dec 2017014157.272.92$412
Nov 2017012855.423.12$399
Oct 2017014349.292.98$427
Sep 2017014547.523.09$448
Aug 2017015045.373.00$451
Jul 2017015443.873.09$475
Jun 2017015242.493.09$469
May 2017015945.373.26$519
Apr 2017015747.933.21$504
Mar 2017016046.772.98$477
Feb 2017014350.452.95$422
Jan 2017016249.413.42$554
Dec 2016116348.763.72$656
Nov 2016116042.492.64$466
Oct 20161216846.193.09$1,073
Sep 2016016641.553.10$515
Aug 2016017541.442.92$512
Jul 2016017641.622.92$515
Jun 2016017445.352.69$467
May 2016118342.521.99$407
Apr 2016117936.561.99$393
Mar 2016018633.011.79$334
Feb 2016017526.472.06$361
Jan 2016019027.352.36$449
Dec 2015019232.362.00$384
Nov 2015018738.792.17$405
Oct 2015020643.552.43$500
Sep 2015020042.992.76$552
Aug 2015021440.162.87$615
Jul 2015020248.152.95$595
Jun 2015019856.152.88$571
May 2015020755.212.96$612
Apr 2015021049.822.71$568
Mar 2015021642.892.93$634
Feb 2015017844.662.98$530
Jan 2015021443.433.10$664
Dec 2014022554.693.59$808
Nov 2014023270.464.25$986
Oct 2014021678.303.90$843
Sep 2014022886.164.05$922
Aug 2014022889.394.04$920
Jul 2014023496.564.18$978
Jun 2014323198.164.74$1,389
May 2014025894.734.73$1,219
Apr 2014022795.944.81$1,092
Mar 2014023095.895.06$1,163
Feb 2014024497.406.19$1,511
Jan 2014027590.404.86$1,337
Dec 2013027491.824.35$1,193
Nov 2013024888.853.74$927
Oct 2013026897.423.78$1,013
Sep 20130266104.113.72$989
Aug 20130189104.253.52$666
Jul 20130188102.523.72$699
Jun 2013019594.403.93$767
May 2013022994.834.15$950
Apr 2013027893.964.28$1,191
Mar 2013032693.623.91$1,276
Feb 2013036191.233.42$1,235
Jan 2013042091.603.42$1,436
Dec 2012039586.773.42$1,351
Nov 2012035486.953.62$1,283
Oct 2012035289.383.40$1,197
Sep 2012030494.672.92$887
Aug 2012051092.662.91$1,483
Jul 2012054885.133.02$1,655
Jun 2012061379.822.52$1,544
May 2012069191.612.49$1,719
Apr 20120935101.652.00$1,867
Mar 201209105.052.22$20
Feb 2012016101.102.57$41
Jan 201201698.092.73$44
Dec 201101496.873.24$45
Nov 201101195.723.31$36
Oct 20110484.983.65$15
Sep 201101583.623.99$60
Aug 201101383.404.15$54
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201103105.964.33$13
Mar 201106896.364.06$276
Feb 2011030385.644.18$1,267
Jan 2011069086.504.59$3,166
Dec 201001,10485.734.35$4,800
Nov 201001,15980.843.80$4,399
Oct 201001,13778.103.51$3,990
Sep 201001,07172.633.98$4,262
Aug 201001,27073.684.42$5,613
Jul 201001,43772.554.74$6,806
Jun 201001,49470.364.91$7,336
May 201001,49171.124.24$6,315
Apr 201001,65781.694.12$6,831
Mar 201001,78978.394.39$7,851
Feb 201001,64073.585.44$8,925
Jan 201001,91374.365.96$11,409
Dec 200901,99171.445.48$10,918
Nov 200902,03374.593.75$7,627
Oct 200902,17772.544.11$8,948
Sep 200962,23865.543.06$7,252
Aug 200902,26567.423.22$7,290
Jul 200902,44161.133.46$8,457
Jun 200902,70666.163.90$10,540
May 200903,06954.743.93$12,048
Apr 200903,25646.773.59$11,681
Mar 200903,69642.144.06$15,002
Feb 2009253,32132.814.63$16,206
Jan 200903,63835.865.37$19,540
Dec 200803,95637.105.98$23,646
Nov 200804,14855.496.86$28,457
Oct 200804,60575.246.92$31,876
Sep 200804,713101.767.88$37,125
Aug 200805,627114.228.48$47,734
Jul 200806,173131.0811.39$70,307
Jun 200806,705131.3313.03$87,384
May 2008437,924123.1711.57$97,011
Apr 200807,175110.3110.45$75,014
Mar 200808,383101.909.66$81,014
Feb 200809,16792.538.77$80,400
Jan 2008011,46890.388.21$94,103
Dec 20073213,80388.337.30$103,616
Nov 2007016,64091.677.29$121,334
Oct 2007024,29282.856.92$168,149
Sep 200705,13175.846.24$32,039

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    7 Mcf  × $  3.05 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236772 is the state's own key, not one this site invented.